549,000 OZ GOLD EQUIVALENT
441,000 OZ GOLD AND 7.2 MOZ SILVER
Far East Gold Ltd (FEG or the Company) is pleased to announce a maiden JORC (2012) Mineral
Resource Estimate (MRE) for its Woyla Gold–Silver Project (Woyla or the Project) in Aceh
Province, Sumatra, Indonesia. The MRE covers four low-sulphidation epithermal vein deposits –
Rek Rinti–Agam, Aloe Rek, Aloe Eumpeuk and Anak Perak – within a 24,260-hectare sixth-
generation Contract of Work originally established by Barrick, in which FEG holds an indirect 51%
interest.
The maiden MRE totals 19.4 Mt at 0.71 g/t Au and 11.6 g/t Ag (0.88 g/t AuEq) for 441,000 ounces
of gold and 7.2 million ounces of silver, or 549,000 ounces of gold equivalent (AuEq),
reported within optimised open-pit shells above a 0.15 g/t AuEq cut-off. Indicated Mineral
Resources of 5.1 Mt at 0.92 g/t AuEq for 151,000 oz AuEq (125,000 oz Au) represent 27% of the
contained AuEq. The Resource contains a coherent higher-grade component: above a 1.0 g/t AuEq
cut-off it contains approximately 293,000 oz AuEq at 1.75 g/t AuEq – 53% of the contained metal
within 27% of the tonnage. The 1.0 g/t AuEq cut-off figures are a grade-tonnage presentation of the
MRE and are not a separate Mineral Resource.
The MRE has been defined from 133 diamond holes for 20,585 m drilled by FEG between
September 2022 and July 2024 on four of the nine known prospects within the Contract of Work,
and is effective as at 9 November 2026. Mineral Resources are not Ore Reserves and do not have
demonstrated economic viability. See the key risks and Forward-Looking Statements in this
announcement.
HIGHLIGHTS
• Maiden JORC (2012) Mineral Resource of 19.4 Mt at 0.71 g/t Au and 11.6 g/t Ag (0.88 g/t
AuEq) for 441,000 oz Au and 7.2 Moz Ag (549,000 oz AuEq), reported within optimised
open-pit shells above a 0.15 g/t AuEq cut-off and classified as Indicated and Inferred.
• Indicated Mineral Resources of 5.1 Mt at 0.76 g/t Au and 10.5 g/t Ag (0.92 g/t AuEq) for
125,000 oz Au and 1.7 Moz Ag (151,000 oz AuEq), representing 27% of contained AuEq
and providing a strong confidence base for a maiden estimate.
• Rek Rinti–Agam is the cornerstone deposit with 343,000 oz Au and 5.9 Moz Ag (432,000
oz AuEq), hosted in at least eight vein zones of 0.7–20 m width and 600–1,500 m strike
length.
• Aloe Rek contains a high-grade Indicated core of 0.3 Mt at 2.02 g/t Au (2.12 g/t AuEq)
within a total Resource of 66,000 oz Au (71,000 oz AuEq). Aloe Eumpeuk is silver-rich at
53.9 g/t Ag (2.15 g/t AuEq).
• Above a 1.0 g/t AuEq cut-off, the MRE contains approximately 5.2 Mt at 1.40 g/t Au and
23.3 g/t Ag (1.75 g/t AuEq) for 293,000 oz AuEq – 53% of the contained AuEq within 27%
WOYLA UPDATE: MAIDEN JORC MINERAL RESOURCE ESTIMATE
FAR EAST GOLD ASX ANNOUNCEMENT 2
of the tonnage. This is a grade-tonnage presentation of the MRE and not a separate Mineral
Resource.
• Metallurgical testwork on Rek Rinti & Aloe Eumpeuk drill core returned 92–93% gold and
79–81% silver recovery by whole-ore cyanide leach at P80 75 µm, with 45–47% gravity-
recoverable gold. The MRE adopts recoveries of 90% for gold and 80% for silver.
• The MRE is supported by 133 diamond holes for 20,585 m drilled by FEG between
September 2022 and July 2024. Only four of the nine known prospects within the Contract
of Work have been drilled; the other five, including FEG’s Kareung Reuboh discovery, are
undrilled exploration targets.
• Potential future work identified in the JORC Report includes infill and extension drilling, first-
pass drilling of untested prospects, and metallurgical and geotechnical studies. All four
deposits lie within Protected Forest (Hutan Lindung). Open-pit mining will require the
relevant areas to be reclassified from Protected Forest to Production Forest; a desktop
study, confirmed by the Ministry of Forestry, identified 15,425.09 ha (63.75%) of the PT
WAM CoW area as potentially eligible for reclassification.
Figure 1: Woyla Project location, retained Contract of Work area and established prospects, Aceh Province, Indonesia.
Chief Executive Officer, Shane Menere comments
“This is another significant milestone for Far East Gold. Delivering a maiden JORC Resource of
549,000 ounces of gold equivalent, including 441,000 ounces of gold and 7.2 million ounces
of silver, is an outstanding result, particularly when you consider that we have only drilled four of
the nine known prospects across this extensive project.
What really excites me is the quality of what we have discovered. We already have 151,000 ounces
of gold equivalent in the Indicated category, and metallurgical testwork demonstrating gold
recoveries of over 90%. These are encouraging fundamentals for the next stage of Woyla's
development. These results provide a strong foundation for demonstrating Woyla's value to
potential development partners.
WOYLA UPDATE: MAIDEN JORC MINERAL RESOURCE ESTIMATE
FAR EAST GOLD ASX ANNOUNCEMENT 3
Importantly, this is only the beginning of our understanding of Woyla's potential. We have five known
prospects yet to be drilled, including our own Kareung Reuboh discovery, and considerable
opportunity to extend the mineralisation already identified.
With Woyla now joining Idenburg and Wonogiri as another of FEG’s JORC-defined gold
projects in Indonesia, FEG's combined JORC 2012-compliant gold resources across its
portfolio now exceed 2.2 million ounces (Woyla 441 koz + Idenburg 780 koz + Wonogiri 996
koz = 2,217 koz Au). This further demonstrates the underlying value and scale of Far East
Gold's portfolio. Our focus at Woyla is now on consolidating the technical information and
evaluating opportunities to realise value through a potential sale or joint venture.”
WOYLA MINERAL RESOURCE ESTIMATE
The Woyla MRE is presented in Table 1 by deposit and classification. It has been estimated in
accordance with the JORC Code (2012) and is reported in situ, within optimised open-pit shells,
above a cut-off grade of 0.15 g/t AuEq on a 100% project basis. Gold and silver grades and
contained metal are reported individually alongside the gold equivalent. The geological modelling
and resource estimation were undertaken by Mr Pratama Abimanyu, Senior Resource Geologist
and an independent consultant to FEG. Dr. Mark Steemson Process Engineer and an independent
consultant to FEG reviewed the metallurgical test results. Mr Michael Corey has reviewed the
supporting data, estimation methodology and results and takes responsibility for the MRE as
Competent Person. The MRE is effective as at 9 November 2026.
Deposit Classification
Tonnes
(Mt)
Au (g/t) Ag (g/t)
AuEq
(g/t)
Au (koz)
Ag
(Moz)
AuEq
(koz)
Rek Rinti–Agam Indicated 4.4 0.64 9.4 0.78 90 1.33 110
Inferred 12.2 0.64 11.7 0.82 253 4.60 322
Total 16.6 0.64 11.1 0.81 343 5.93 432
Aloe Rek Indicated 0.3 2.02 7.0 2.12 19 0.07 20
Inferred 1.6 0.89 4.9 0.97 47 0.26 51
Total 1.9 1.06 5.2 1.14 66 0.33 71
Aloe Eumpeuk Indicated 0.2 1.05 37.6 1.62 8 0.29 12
Inferred 0.3 1.59 68.4 2.62 14 0.59 22
Total 0.5 1.34 53.9 2.15 22 0.88 34
Anak Perak Indicated 0.2 1.25 6.9 1.36 8 0.04 8
Inferred 0.1 0.83 7.1 0.94 3 0.03 3
Total 0.3 1.10 7.0 1.21 11 0.07 11
Woyla Total Indicated 5.1 0.76 10.5 0.92 125 1.73 151
Inferred 14.3 0.69 11.9 0.87 316 5.47 398
Total 19.4 0.71 11.6 0.88 441 7.20 549
Table 1: Woyla Mineral Resource Estimate, effective 9 November 2026. Mineral Resources are reported in situ within
optimised pit shells above a cut-off grade of 0.15 g/t AuEq on a 100% project basis; FEG holds an indirect 51% interest
in PT Woyla Aceh Minerals. AuEq = Au + 0.015 × Ag (see Gold equivalent calculation). Tonnes, grades and contained
metal are rounded and totals may not add due to rounding. Mineral Resources are not Ore Reserves and do not have
demonstrated economic viability.
WOYLA UPDATE: MAIDEN JORC MINERAL RESOURCE ESTIMATE
FAR EAST GOLD ASX ANNOUNCEMENT 4
Figure 2: Woyla contained gold by deposit and classification, with contained gold equivalent shown in brackets.
Gold equivalent calculation
Gold equivalent (AuEq) grades are calculated as AuEq (g/t) = Au (g/t) + 0.015 × Ag (g/t), and
contained AuEq ounces as Au oz + 0.015 × Ag oz. The conversion factor of 0.015 reflects a
recovery-adjusted Ag:Au value ratio of approximately 67:1, based on assumed prices of
US$3,500/oz for gold and US$59.06/oz for silver and metallurgical recoveries of 90% for gold and
80% for silver, which are supported by the metallurgical testwork summarised in Table 3. It is the
Company’s opinion that both gold and silver included in the metal equivalent calculation have a
reasonable potential to be recovered and sold.
WOYLA PROJECT OVERVIEW
The Woyla Project lies in the Barisan Range of Aceh Province, northern Sumatra, approximately
120 km south-east of Banda Aceh (Figure 1). Access is by sealed road from Banda Aceh via
Beureunuen, Tangse and Geumpang to the base camp near Anak Perak (about 5.5 hours), then
by trail bike or on foot to the prospects. Helicopter access from Banda Aceh takes about 40 minutes.
The Project is held by PT Woyla Aceh Minerals (PT WAM), formerly PT Barrick Mutiara Woyla,
under a sixth-generation Contract of Work (CoW) signed on 28 April 1997 and covering 24,260
hectares in the Pidie and West Aceh Regencies. FEG holds an indirect 51% interest in PT WAM.
The CoW is in the exploration stage. The exploration term ran from 14 October 2022 to 14 October
2024; PT WAM lodged a valid application to extend the exploration stage before it expired, followed
by further applications in 2025 and 2026, and the extension is being processed by the Directorate
General of Minerals and Coal of the Ministry of Energy and Mineral Resources. The CoW provides
for a 30-year operation period from the start of production, extendable by two further 10-year
periods, subject to approval.
Barrick explored the CoW between 1995 and 1997 using regional geochemistry, airborne
geophysics, mapping and trenching, and identified the Aloe Rek, Aloe Eumpeuk, Anak Perak and
Rek Rinti vein systems, but did not drill. Newcrest held an earn-in between 1999 and 2002 but
completed no additional fieldwork, and the CoW was suspended during the Aceh conflict before
being reactivated on 14 October 2022. FEG commenced detailed geological mapping, vein
sampling and geophysical surveys in 2021 and began diamond drilling at Anak Perak in September
2022. Nine prospects are now known within the CoW, including FEG’s Kareung Reuboh discovery.
No historical Mineral Resource has been reported for any Woyla prospect.
WOYLA UPDATE: MAIDEN JORC MINERAL RESOURCE ESTIMATE
FAR EAST GOLD ASX ANNOUNCEMENT 5
SUMMARY OF MATERIAL INFORMATION (ASX LISTING RULE 5.8.1)
Geology and geological interpretation
The CoW straddles the dextral Sumatran Fault System. Basement is the Triassic to Early
Cretaceous Woyla Group arc assemblage, overlain by Tertiary sediments and Quaternary
volcanics and intruded by Late Cretaceous–Palaeocene and Miocene intrusions (Figure 3). Gold–
silver mineralisation is of low-sulphidation epithermal type, hosted in banded quartz–adularia veins,
stockworks and breccias with ginguro banding, electrum and acanthite within andesitic volcanic
rocks. At Rek Rinti–Agam, drilling has delineated ten quartz veins, including the Agam, Pertama,
Susi and Bohay veins, which strike north-east to east and dip about 60° south-east. At Aloe Rek
(Victory Vein), Aloe Eumpeuk (Meuh and Awai veins) and Anak Perak, veins strike north–south and
dip 70–80° east. Aloe Eumpeuk mineralisation is silver-rich (Ag:Au about 39:1). Mineralisation was
interpreted as 13 structurally controlled domains from logged quartz veining, brecciation and
assays, supported by surface mapping.
Figure 3: Summary regional geology of the Woyla Project showing the Sumatran Fault System and prospect locations
(PT Barrick Mutiara Woyla, July 1997).
Drilling techniques
The MRE is supported by 133 diamond drill holes for 20,585 m completed by FEG between
September 2022 and July 2024 (Table 2), of which 111 intersected gold-bearing veins and were
used to define the mineralised domains; the remaining holes did not intersect veins (Figure 4). All
drilling was by Omega Drilling using man-portable rigs with triple-tube PQ core from surface
(median 45 m) and HQ thereafter, with core oriented by Reflex and Axis tools. Average core
recovery is 92.7%. Collars were surveyed by RTK GNSS, except for eight holes located by tape
and compass, and downhole surveys were taken at 10 m and then every 40–50 m.
WOYLA UPDATE: MAIDEN JORC MINERAL RESOURCE ESTIMATE
FAR EAST GOLD ASX ANNOUNCEMENT 6
Deposit Holes Metres Period Selected significant intercepts (down-hole)
Rek Rinti–
Agam
63 11,618 Oct 2022 – Mar 2024
RRD004: 30.0 m @ 2.83 g/t Au from 98.0 m, incl. 8.1
m @ 7.69 g/t Au; RRD034R: 25.8 m @ 3.28 g/t Au
from 66.5 m
Aloe Rek 12 1,884 Mar – Jul 2024
ARD009: 20.0 m @ 7.57 g/t Au from 67.5 m, incl.
11.0 m @ 13.45 g/t Au; ARD001: 12.4 m @ 5.59 g/t
Au from 82.3 m
Aloe Eumpeuk 30 3,647 Apr – Aug 2023
AED018: 6.8 m @ 3.50 g/t Au from 65.2 m; AED002:
2.6 m @ 7.31 g/t Au from 74.4 m, incl. 1.0 m @
18.46 g/t Au
Anak Perak 28 3,436
Sep 2022 – Mar
2023
APD011: 11.8 m @ 2.91 g/t Au from 48.6 m, incl. 2.5
m @ 10.51 g/t Au
Total 133 20,585 Sep 2022 – Jul 2024
Table 2: Summary of FEG diamond drilling by deposit, with selected significant intercepts calculated at a 0.2 g/t Au lower
cut-off with a maximum of 2 m internal waste and no top cut. Intercepts are down-hole lengths; true widths are not known.
These results have been previously reported (see ASX announcements dated 13 December 2022, 2 February 2023, 22
July 2024 and FEG’s 2023 Financial Report - 29 Sep 2023). Totals may not add due to rounding.
Figure 4: Drill collar locations by deposit and topographic survey coverage (UTM Zone 47N, WGS84).
WOYLA UPDATE: MAIDEN JORC MINERAL RESOURCE ESTIMATE
FAR EAST GOLD ASX ANNOUNCEMENT 7
Sampling and sub-sampling techniques
Core was logged, photographed and marked up by geologists, and half core was sampled on
geological boundaries at 0.17–1.83 m intervals (median 1.0 m), for 9,715 samples over 8,293 m,
and dispatched under chain-of-custody protocols. Samples were crushed to 95% passing 3 mm
and pulverised to 95% passing 75 µm.
Sample analysis method
Samples were analysed by PT Geoservices, Cikarang (ISO 17025). Gold was determined by 30 g
fire assay with AAS finish to January 2023 and 50 g fire assay with AAS finish thereafter, with a
gravimetric finish above 50 ppm. Silver and multi-elements were determined by aqua regia digest
with ICP-OES finish and ore-grade AAS above 100 ppm Ag. CRMs, blanks and field duplicates
were inserted at a combined rate of 13.3%, with 70 umpire pulps checked by Intertek. Accuracy
and contamination are acceptable; field-duplicate precision is moderate to poor, consistent with the
variable distribution of gold in epithermal veins. Screen fire assays of five high-grade pulps by
Intertek confirmed coarse gold in two samples, which led FEG to adopt the larger 50 g fire assay
charge. The QA/QC results are considered adequate to support the Mineral Resource
classification.
Estimation methodology
Geological modelling and resource estimation were undertaken by independent consultant Mr
Pratama Abimanyu using Leapfrog Geo. Block models use parent blocks of 10 m × 10 m × 5 m,
sub-blocked to 2.5 m × 2.5 m × 1.25 m. Assays were composited to 1 m within domains and top-
cut at the 94th to 99th percentile. Gold and silver were estimated independently by ordinary kriging
using pairwise-relative variograms, with inverse distance weighting used for three minor domains
(RR_02, NRA_01 and NRA_02) that have insufficient data for variography. Bulk densities from
2,080 wax-coated immersion measurements were applied at 2.46 t/m³ (Rek Rinti–Agam and Aloe
Rek), 2.40 t/m³ (Aloe Eumpeuk) and 2.42 t/m³ (Anak Perak). The model was validated using global
statistics, swath plots and cross-sections, and block volumes agree with wireframe volumes to
within 1% for all but two minor domains. No depletion has been applied for artisanal workings, which
in the Competent Person’s opinion have had no material impact on the Mineral Resource.
Cut-off grade
Pit optimisation and resource reporting are based on AuEq grade. The 0.15 g/t AuEq cut-off is a
break-even grade calculated using a mining cost of US$2.00/t, processing cost of US$10.00/t, G&A
cost of US$3.00/t, 90% gold recovery, 80% silver recovery, a silver price of US$59.06/oz (applied
through the AuEq factor) and a gold price of US$3,500/oz, which is approximately 15% below the
spot price at the time of reporting (about US$4,100/oz, September 2026). At current prices the
break-even cut-off is approximately 0.13 g/t AuEq. Costs are based on typical open-pit gold
operations in Indonesia. Royalty, refining charges and mining dilution are not included in the
optimisation, with the discount to the spot price considered sufficient to accommodate them.
Classification criteria
Mineral Resources are classified as Indicated and Inferred using three-dimensional solids digitised
around areas of consistent drill spacing and geological confidence. Indicated Resources are areas
drilled at a nominal spacing of approximately 40 m with demonstrated geological and grade
continuity, estimated by ordinary kriging in the first or second search pass and predominantly
informed by two or more drill holes. Inferred Resources are estimated blocks outside the Indicated
areas within domains supported by at least two drill holes, including all blocks estimated by inverse
distance weighting. Indicated blocks have a median average sample distance of 41 m and Inferred
blocks 109 m. Indicated Resources account for 26% of tonnes and 27% of contained AuEq, with
86% of Indicated tonnes at Rek Rinti–Agam. No Measured Resources have been estimated. The
WOYLA UPDATE: MAIDEN JORC MINERAL RESOURCE ESTIMATE
FAR EAST GOLD ASX ANNOUNCEMENT 8
Competent Person believes that the classification criteria are appropriate and the resulting resource
classifications are an accurate reflection of mineral distribution.
Mining and metallurgical methods and parameters, and other modifying factors
Conventional open-pit truck-and-shovel mining is assumed. To demonstrate reasonable prospects
for eventual economic extraction (RPEEE), FEG generated optimised pit shells for each deposit at
a gold price of US$3,500/oz with 45° overall slopes and 90% recovery, and the Mineral Resource
is reported within these shells above 0.15 g/t AuEq (Figure 5). The pit shells extend to
approximately 100 m below surface at Anak Perak and 150 m at Rek Rinti–Agam, Aloe Eumpeuk
and Aloe Rek, while the block models extend to about 250 m. A sensitivity run at US$3,600/oz
changed the contained AuEq within the shells by less than 1%, with no significant change in pit
depth.
Figure 5: Rek Rinti–Agam block model (Au g/t) with the RPEEE optimised pit shell (left), and a representative cross-
section showing block grades, drill holes and the pit shell outline (right).
Metallurgical testwork was carried out by PT Geoservices, Cikarang, in three programmes designed
and supervised by FEG metallurgical consultant Dr Mark Steemson (Table 3). The Rek Rinti
samples tested are amenable to conventional gravity and cyanide leach processing, with 92–93%
gold and 79–81% silver extraction at a grind of P80 75 µm and 45–47% gravity-recoverable gold.
Gravity concentration followed by leaching of the gravity tailings gave a similar overall gold recovery
(91.4–94.5%). Cyanide consumption is high (4.7–4.9 kg/t NaCN) owing to the high silver content
and cyanide-soluble copper, and cyanide recovery may be required; coarse-crush (heap leach)
recoveries are low. Recoveries of 90% for gold and 80% for silver are assumed. No testwork has
yet been carried out on Aloe Rek or Anak Perak material or on oxidised material, and recoveries
there are assumed to be similar to Rek Rinti and Aloe Eumpeuk.
WOYLA UPDATE: MAIDEN JORC MINERAL RESOURCE ESTIMATE
FAR EAST GOLD ASX ANNOUNCEMENT 9
Test
Head grade
(Au / Ag g/t)
Grind Au recovery Ag recovery
Diagnostic leach (01726)
1.24–2.58 /
91–134
P95 75 µm 90.6% avg 86.3% avg
Whole-ore cyanide leach, 72 h (01995)
HG01 3.83 /
66; LG01 0.99
/ 17
P80 75 µm 93% / 92% 81% / 79%
Gravity-recoverable gold (01995) HG01 / LG01 to P50 75 µm 47% / 45% 13% / 11%
Gravity + leach of tails (01995) HG01 / LG01 P80 75 µm
94.5% /
91.4%
≈83% / ≈72%
Coarse bottle roll (02061)
1.52–2.00 /
71–111
P100 12.5
mm
24.5–50.1% 18.0–51.3%
Table 3: Summary of metallurgical testwork on Woyla drill core composites from Rek Rinti and Aloe Eumpeuk (PT
Geoservices, 2023–2024).
Environmental, forestry and permitting factors
All four deposits lie within Protected Forest (Hutan Lindung, HL), which covers approximately 88%
of the CoW, with the remaining 12% being non-forest area (APL). Open-pit mining within Protected
Forest is not permitted without a change of forest function to Production Forest. A desktop study by
Bogor Agricultural University concluded, as confirmed by the Ministry of Forestry, that 15,425 ha
(63.75%) of the CoW area previously classified as Protected Forest may be proposed for
reclassification as Production Forest. The forest-function status is considered a material risk to the
open-pit RPEEE. Mining will also require a Forest Area Use Approval (PPKH), an AMDAL
environmental approval and completion of the exploration stage of the CoW. No waste rock
characterisation or tailings storage studies have been undertaken, and artisanal mining is present
at Rek Rinti.
WOYLA GRADE-TONNAGE DISTRIBUTION
Table 4 and Figure 6 show the sensitivity of the Mineral Resource within the optimised pit shells to
AuEq cut-off grade. The Resource contains a coherent higher-grade component, with
approximately 5.2 Mt at 1.75 g/t AuEq for 293,000 oz AuEq (235,000 oz Au and 3.9 Moz Ag) above
a 1.0 g/t AuEq cut-off. Figures at cut-offs other than 0.15 g/t AuEq are a grade-tonnage presentation
of the MRE, are provided for information only and do not represent a separate Mineral Resource,
a mineable inventory or a production target.
Cut-off (g/t
AuEq)
Tonnes
(Mt)
Au (g/t) Ag (g/t)
AuEq
(g/t)
Au (koz) Ag (Moz)
AuEq
(koz)
Indicated
AuEq
(koz)
Inferred
AuEq
(koz)
0.10 20.1 0.70 11.2 0.85 443 7.23 552 152 400
0.15
(reported)
19.4 0.71 11.6 0.88 441 7.20 549 151 398
0.20 18.6 0.73 12.0 0.91 437 7.15 544 149 395
0.30 16.8 0.79 13.0 0.98 425 7.01 530 143 387
0.40 14.7 0.86 14.3 1.07 405 6.76 506 137 370
0.50 12.9 0.92 15.6 1.16 383 6.49 481 128 353
0.60 11.3 0.99 17.0 1.24 360 6.17 453 121 332
0.70 10.1 1.04 18.0 1.31 340 5.87 428 114 314
0.80 9.0 1.10 19.0 1.39 318 5.50 400 107 294
0.90 6.5 1.26 22.2 1.59 263 4.64 332 101 231
1.00 5.2 1.40 23.3 1.75 235 3.89 293 96 197
Table 4: Grade-tonnage sensitivity of the Woyla MRE within the optimised pit shells (Indicated + Inferred). The reported
Mineral Resource is at the 0.15 g/t AuEq cut-off.
WOYLA UPDATE: MAIDEN JORC MINERAL RESOURCE ESTIMATE
FAR EAST GOLD ASX ANNOUNCEMENT 10
Figure 6: Grade-tonnage curves by deposit and classification within the optimised pit shells. The dashed line marks the
0.15 g/t AuEq reporting cut-off.
FEG PORTFOLIO JORC GOLD MINERAL RESOURCES
With the maiden Woyla Mineral Resource, FEG's combined JORC (2012) compliant gold Mineral
Resources across its portfolio total approximately 2.2 million ounces of gold (Table 5). The Idenburg
and Wonogiri estimates have been previously reported, were prepared by different Competent
Persons at different dates and using different parameters, and are not directly comparable with the
Woyla estimate.
Project
FEG
interest
Classification
Tonnes
(Mt)
Au
(g/t)
Au (koz)
100%
Source
Woyla
51%
(indirect)
Indicated +
Inferred
19.4 0.71 441
This announcement, using a 0.15 g/t
AuEq cut-off grade.
Idenburg 51% Inferred 7.8 3.1 780 ASX announcement 5 May 2026
Wonogiri
(Randu
Kuning)
100%
Measured +
Indicated +
Inferred
81.6 0.38 996
Replacement Prospectus (released
25 Mar 2022); ASX announcement 11
Jul 2022; Au-only resource first
reported by Augur Resources Ltd (30
Aug & 9 Sep 2016)
Total 2,217
Table 5: FEG JORC (2012) gold Mineral Resources by project. See Previously reported information.
NEXT STEPS
The JORC Report identifies the following potential future activities to advance the Woyla Project:
• infill drilling to convert Inferred Mineral Resources to Indicated, with priority on Rek Rinti–
Agam and the Aloe Rek high-grade Indicated core;
• extension drilling along strike and down-dip of the modelled veins, including below the
current pit shells, and first-pass drilling of the five undrilled prospects within the CoW;
• advanced metallurgical testwork, including on Aloe Rek, Anak Perak and oxidised material,
together with geotechnical studies; and
• progressing the extension of the CoW exploration stage and the change of forest function
required for open-pit mining.
WOYLA UPDATE: MAIDEN JORC MINERAL RESOURCE ESTIMATE
FAR EAST GOLD ASX ANNOUNCEMENT 11
FORWARD-LOOKING STATEMENTS
This announcement contains forward-looking statements concerning FEG’s plans, intentions and
expectations. Forward-looking statements are subject to known and unknown risks, uncertainties
and assumptions, many of which are beyond the Company’s control. Actual outcomes may differ
materially from those expressed or implied. Mineral Resources are not Ore Reserves and do not
have demonstrated economic viability. Inferred Mineral Resources have a lower level of confidence
than Indicated Mineral Resources and there is no certainty that further exploration will result in their
conversion to Indicated Mineral Resources. The Company gives no assurance that the activities or
outcomes described will be achieved and, except as required by law or the ASX Listing Rules,
undertakes no obligation to update these statements.
WOYLA UPDATE: MAIDEN JORC MINERAL RESOURCE ESTIMATE
FAR EAST GOLD ASX ANNOUNCEMENT 12
COMPETENT PERSON’S STATEMENT
The information in this announcement that relates to Mineral Resources is based on, and fairly
represents, information and supporting documentation reviewed by Mr Michael C Corey, a
Competent Person who is a Member of Professional Geoscientists Ontario (PGO), Canada. Mr
Corey is a consultant to Far East Gold Ltd, providing technical services for which he receives
compensation that is not contingent on the findings of the Mineral Resource estimate. Mr Corey
has over 35 years’ experience in international mineral exploration, including 20 years in Southeast
Asia focused on epithermal gold–silver and porphyry copper deposits, and has sufficient experience
relevant to the style of mineralisation and type of deposit under consideration, and to the activity
being undertaken, to qualify as a Competent Person as defined in the 2012 Edition of the JORC
Code. Mr Corey consents to the inclusion in this announcement of the matters based on his
information in the form and context in which it appears.
The full JORC Mineral Resource Report for the Woyla Project (November 2026), including JORC
Table 1 and drill hole collar details, accompanies this announcement.
Information in this announcement relating to previously reported exploration results at Woyla,
including the drill intercepts in Table 2, is extracted from the Company’s ASX announcements dated
(13 December 2022, 2 February 2023, 22 July 2024 and FEG’s 2023 Financial Report - 29 Sep
2023). The Company confirms that it is not aware of any new information or data that materially
affects the information included in the previous announcements and the Competent Person
confirms that the form and context of information presented in this announcement has not been
materially modified from the original announcements.
ABOUT FAR EAST GOLD
Far East Gold Ltd (ASX: FEG) is an ASX listed copper/gold exploration company with six advanced
projects in Australia and Indonesia. This announcement has been authorised for release by the
Board of Far East Gold Ltd.
FURTHER INFORMATION:
Sign up to the Far East Gold investor hub to receive important news and updates directly to your
inbox, and to engage directly with our leadership team: https://investorhub.fareast.gold/auth/signup
COMPANY ENQUIRIES
Justin Werner
Chairman
e: justin.werner@fareast.gold
Shane Menere
Chief Executive Officer
e: shane.menere@fareast.gold
m: + 61 406 189 672
+ 62 811 860 8378
Tim Young
Investor Relations & Capital
Markets
e: tim.young@fareast.gold
m: + 61 484 247 771
JORC MINERAL RESOURCE REPORT
Woyla Gold - Silver Project
Pidie and West Aceh Regencies, Aceh Province, Indonesia
Prepared for: Far East Gold Ltd
November 2026
Woyla Project – JORC Mineral Resource Report
Far East Gold Ltd – November 2026 Page 2 of 101
CONTENTS
DISCLAIMER................................................................................................................................................. 7
ABBREVIATIONS.......................................................................................................................................... 7
RELEVANT REPORTS AND DOCUMENTS ................................................................................................ 8
EXECUTIVE SUMMARY............................................................................................................................... 9
Summary of Licence and Ownership ..................................................................................................... 9
Location of Project.................................................................................................................................. 9
Description of Scope .............................................................................................................................. 9
Summary of Exploration....................................................................................................................... 10
Summary of Mineral Resource Estimate.................
Share your feedback
Discover