Quarterly Activities/Appendix 5B Cash Flow Report
Released
Released
Announcement PDF
ASX ANNOUNCEMENT
26 April 2024
REPORT ON ACTIVITIES FOR
THE QUARTER ENDED
31 MARCH 2024
(ASX: FEG)
FAR EAST GOLD LTD ACN 639 887 219
WWW.FAREAST.GOLD
ASX ANNOUNCEMENT MARCH 2024 QUARTERLY EXPLORATION UPDATE 26 APRIL 2024
Far East Gold Ltd (‘FEG’ or ‘the Company’) is pleased to provide an update of exploration and work activities completed across the
quarter ending 31 March 2024 on its highly prospective portfolio of Indonesian and Australian projects.
WOYLA PROJECT HIGHLIGHTS
FEG continued to test epithermal quartz vein targets within the Woyla Copper Gold Project’s 24,260ha Contract of Work (COW)
tenement. Diamond drilling was completed within the Rek Rinti and Aloe Rek vein systems with detailed geological mapping
focused within the defined structural corridor extending from the Aloe Eumpeuk prospect to the Aloe Rek prospect.
- To the end of the Q1 2024, 127 holes totaling 19,492.75m had been completed within the Woyla COW area with assays
returned for 123 holes.
- The Company completed 10 drillholes for a total of 2,127.2m as part of the extended Phase 2 drill program at Rek Rinti (6
holes) and Aloe Rek (4 holes) prospect areas (see Table 2). The Rek Rinti drilling extended the ‘sweet spot’ zone of highgrade gold and silver mineralization intersected in the Pertama vein within drillholes RRD027 and RRD028, which were
originally reported in the Company’s ASX announcements dated November 23, 2023.
- Assay results were received for drillholes RRD034 and a partial redrill 034R. These holes intersected the Pertama vein zone
approximately 75m southwest of and at an approximate 50m additional vertical depth from drillholes RRD027 and 028
(Figure 2). Drillhole RRD034 intersected a 0.9m high grade zone of 32.65 g/t Au, 117 g/t Ag (34.06 g/t AuEq) from
87.2m as part of a 27.8m wide mineralised quartz vein/breccia zone that assayed at 2.49 g/t Au Eq. Drillhole RRD034R
also intercepted a significant 25.8m wide zone of quartz vein and breccia that assayed at 3.28 g/t Au, 50.59g/t Ag
(3.89 g/t AuEq) from 66.5m. Refer to the Company’s ASX announcements of January 23, 2024, and February 5, 2024 for
further details.
The Company also commenced initial drilling at the Aloe Rek vein system with focus on the Victory vein zone which was originally
Barrick’s top priority prospect within the Woyla COW. The Aloe Rek prospect is situated within a 6km long structural corridor
extending from Rek Rinti to Aloe Rek prospect areas including the Aloe Eumpeuk prospect. The completed UAV magnetic and
Lidar survey continues to provide important details of the structures that controlled development of the quartz vein zones and
also the occurrence of high grade gold-silver mineralisation within the veins. Refer to Company ASX report of January 31, 2024.
During the March 2024 quarter the Company did not acquire or dispose of any mining tenements or change its beneficial interest
in the Indonesian tenements. The Company negotiated Deeds of Amendment for all three Australian projects upon notice that it
satisfied the earn-in expenditure obligations to retain its 90% interest in the projects. Additionally, the Company entered into a
new Earn-in Agreement and fully acquired a 90% interest in the Reedy Creek project. The Reedy Creek tenement directly adjoins
the Company’s Hill 212 and Bluegrass Creek tenements and covers an area of approximately 3,600 ha. Refer to the Company’s
announcement dated 28 February 2024
FAR EAST GOLD ASX ANNOUNCEMENT
2
ASX ANNOUNCEMENT MARCH 2024 QUARTERLY EXPLORATION UPDATE 26 APRIL 2024
WOYLA
INDO
TRENGGALEK
WONOGIRI
BLUE GRASS CREEK
REEDY CREEK
MT CLARK WEST
HILL 212
LD
Figure 1: Map shows location of FEG projects in Indonesia and Australia.
INDONESIAN PROJECT ACTIVITIES
WOYLA PROJECT – ACEH PROVINCE, INDONESIA
The Company’s Woyla Copper Gold Project is a 24,260 ha 6th generation Contract of Work (COW) located in the Aceh region
of North Sumatra, Indonesia (Figure 1). In the Company’s opinion this project was one of the most highly prospective undrilled
copper gold projects in South-East Asia with the potential to host high grade epithermal and porphyry deposits. FEG holds a
51% interest in the project that will increase to 80% upon the Company’s completion of a feasibility study and definition of a
maiden JORC resource estimate for the project. The Company continues to drill test vein targets within the Rek Rinti prospect
area at the Agam zone and define drill targets within the 6km structural corridor extending south to the Aloe Rek prospect
(Fig.2).
FAR EAST GOLD ASX ANNOUNCEMENT
3
ASX ANNOUNCEMENT MARCH 2024 QUARTERLY EXPLORATION UPDATE 26 APRIL 2024
Figure 2: Map shows the Woyla project area and COW property boundary. The locations of defined epithermal quartz vein systems and the
Beurieung porphyry prospect are indicated. The interpreted extent of the Sumatra Fault Zone (SFZ) is indicated. Map coordinates are in UTM WGS
84 – Zone 47N format.
FAR EAST GOLD ASX ANNOUNCEMENT
4
ASX ANNOUNCEMENT MARCH 2024 QUARTERLY EXPLORATION UPDATE 26 APRIL 2024
Rek Rinti Drill Program
The Rek Rinti vein system is comprised of 8 individual quartz veins ranging from 0.7m to 20m in width. The veins are structurallycontrolled with a dominant northeast orientation and can be traced at surface for up to 250m in length. The quartz veins are
mostly chalcedonic with distinct colloform-crustiform banded textures including sulphide-rich ginguro bands. The veins also
contain intergrowths of adularia and are intercalated with massive black manganese near surface. The Phase 2 drill program at
Rek Rinti focused on detailed drilling at the Agam zone, and continued testing of the Susi and Pertama veins.
During the Q1 2024 report period 6 holes for a total of 1,344.7m were completed (Figure 2). Table 2 below lists details for the
completed drill holes. Holes RRD035 to 040 were completed to test lateral and depth extension of the Pertama and Susi vein
zones. The veins were intersected as targeted and assays are pending. Assays were also reported for an additional 4 holes
(RRD032 to 34R ) completed Q4 2023 that also tested the Susi and Pertama veins. Refer to Company ASX release of January 23,
2024. Significant intersections for these holes included:
-
RRD033 - 18m at 1.96 g/t Au, 24.85 g/t Ag (2.25 g/t AuEq) from 69-87m, including:
- 0.7m at 5 g/t Au, 39.7 g/t Ag (5.49 g/t AuEq) from 72.2-72.9m; and
- 1m at 15.76 g/t Au, 99 g/t Ag (16.95 g/t AuEq) from 77.6 -78.6m.
- RRD034 - 27.8m at 1.32 g/t Au, 27.13 g.t Ag (2.49 g/t AuEq) from 68.7 – 96.5, including:
- 5.9m at 5.9 g/t Au, 37.63 g/t Ag (6.35 g/t AuEq) from 87.2-93.1m; and
-
0.9m at 32.65 g/t Au, 117 g/t Ag (34.06 g/t AuEq) from 87.2 - 88.1m.
RRD034R - 25.8m at 3.28 g/t Au, 50.59g/t Ag (3.89 g/t AuEq) from 66.5 – 92.3m, including:
-
5.2m of 6.97g/t Au, 58.06 g/t Ag (7.67 g/t AuEq) from 81.2 – 86.4m; and
-
0.9m at 8.4 g/t Au, 579 g/t Ag (15.35 g/t AuEq) from 88.9 – 89.8m.
Figures 3 and 4 show hole locations and Figure 5 shows an interpreted cross section of the drillholes. Compiled significant assay
intersections are listed in Appendix 1.
Table 2: Details of completed Woyla drillholes completed during Q1 2024. A total of 10 holes for 2,013.4 meters were completed. Refer to Figures and
6 for hole locations. Coordinates reflect datum reference UTM WGS 84 – Zone 47N.
FAR EAST GOLD ASX ANNOUNCEMENT
5
ASX ANNOUNCEMENT MARCH 2024 QUARTERLY EXPLORATION UPDATE 26 APRIL 2024
Figure 3: Plan map showing the surface extent of defined quartz vein zones in the central part of the Rek Rinti prospect. The location of drillholes
RRD032-RRD040 in the southwestern prospect area are indicated. The holes were targeting lateral and depth extensions of the Pertama and Susi
veins. Refer to Figures 3 for a vein map and Figure 4 showing a schematic cross-section of the Pertama vein intersected in holes RRD033-34R.
Only 3 of the 8 known vein systems within the Rek Rinti systems have been effectively drill tested. The results to date confirm
that high-grade Au-Ag mineralisation has developed within several veins at multiple sites and over significant width. The
Company will continue to drill test priority vein targets.
Recent detailed mapping within the interpreted structural corridor between Aloe Eumpeuk and Beurieung prospect
has identified new epithermal type quartz vein occurrences. This work has increased the total strike length of
quartz veins identified at Woyla an additional 5.5km to a total length of 18.5km. Collectively just 3.2km of the total
extent of defined veins has been drill tested as part of the Phase 1 and 2 drill programs. Refer to the Company’s
announcement of 8 April 2024.
FAR EAST GOLD ASX ANNOUNCEMENT
6
ASX ANNOUNCEMENT MARCH 2024 QUARTERLY EXPLORATION UPDATE 26 APRIL 2024
Figure 4: Interpreted 3D vein map of the Rek Rinti prospect area showing the location of the Pertama, Susi and Agam zone veins. Drillholes completed
and those for which assays were received during the Q1 period are indicated (yellow highlight). Refer to Appendix 1 for the compiled significant
assays for these holes.
Holes RRD033-34R were drilled to southwest along vein strike of holes RRD027, 028 to further test the lateral extension of the
Pertama vein. Hole 34R was drilled to improve core recovery through a zone of very broken and fractured core. The occurrence
of ginguro banded quartz within these holes indicates the potential for additional high-grade mineralisation within the Pertama
vein along strike and to depth. The Company will continue to test this zone at depth and along strike in future drilling.
FAR EAST GOLD ASX ANNOUNCEMENT
7
ASX ANNOUNCEMENT MARCH 2024 QUARTERLY EXPLORATION UPDATE 26 APRIL 2024
Figure 5: Interpreted cross section through the Pertama vein for holes RRD033,034 and the partial redrill hole 034R. Section looking North. Significant
historical artisanal mining of the vein resulted in no core recovered where artisanal shafts were intersected. See Appendix 1 for compiled significant
intersections for these holes.
Figure 6: Photos of core specimens from Pertama vein drill holes RRD033 and 034R. The specimens show well developed ginguro textures and finely
banded opaline quartz textures (above left) with corresponding assay results for the sampled interval. Left: RRD033 interval assayed 1m at 15.76 g/t Au,
99 g/t Ag (16.95 g/t AuEq) from 77.6 -78.6m. Right: RRD034R 0.9m at 8.4 g/t Au, 579 g/t Ag (15.35 g/t AuEq) from 88.9 – 89.8m.
FAR EAST GOLD ASX ANNOUNCEMENT
8
ASX ANNOUNCEMENT MARCH 2024 QUARTERLY EXPLORATION UPDATE 26 APRIL 2024
Aloe Rek Drill Program
Initial drilling commenced to test the Aloe Rek vein system on March 2, 2024. The primary drill target at the Aloe Rek prospect
area is the Victory vein systems, first defined by Barrick during their exploration at the Woyla project during 1997. Aloe Rek was
originally Barrick’s top priority prospect within the Woyla project. Further exploration by Newcrest (1998) indicated the Victory
vein zone to comprise a complex series of north-south trending quartz lenses and veinlets that can be traced over a strike
distance of more than 1km in a broad zone of argillic altered andesite. Individual veins exhibit well defined bladed quartz replacing
calcite and colloform quartz-adularia banding. Refer to ASX release of 7 March 2024 for additional historical details of the Victory
vein systems. The drill program will test the Victory vein zone with 100m spaced drill holes over a strike length of 500m and to a
vertical depth of approximately 200m.
Four holes (ARD01-04) were completed during the report period for a total of 668.7m (Figure 7). The Victory vein zone was
intersected in each of the holes and assays are pending.
No substantive mining production or development activities were carried out by the Company on the Woyla project during the quarter
Woyla Tenement total expenditure for Q1 2024 = $1.428m
Figure 7: Satellite image of the Aloe Rek prospect area showing the location of completed holes ARD-001 to 004. See Table 2 for hole coordinates/ Au
g/t assays from vein samples collected at surface are also indicated. Refer to ASX release of 7 March 2024 for additional vein and sample details.
FAR EAST GOLD ASX ANNOUNCEMENT
9
ASX ANNOUNCEMENT MARCH 2024 QUARTERLY EXPLORATION UPDATE 26 APRIL 2024
TRENGGALEK PROJECT – EAST JAVA, INDONESIA
During the Q1 reporting period the Company has continued to evaluate priority areas selected for the planned scout drilling
program. Refer to the ASX releases of December 5, 2023 and January 31, 2024.
A program of detailed field mapping at planned porphyry drill targets at the Sumber Bening, Buluroto Singgahan and Jerambah
porphyry prospect areas continued and was completed in the first quarter of 2024 to define the extents of porphyry-related
alteration and mineralisation. This work is aided by detailed structural and magnetic anomaly assessments completed by ERG
(Figure 8). Results from this mapping are pending.
No substantial exploration field activities, mining production or development activities were carried out by the Company on the
Trenggalek project during the quarter.
Figure 8: Image for the southern part of the Trenggalek IUP showing a compilation of exploration targeting criteria data for the Singgahan, Sentul,
Buluroto and Jerambah prospect areas, The ERG work identified a number of Priority 1 and 2 targets areas for further detailed mapping. The current
drill programs planned for Singgahan, Buluroto and Jerambah prospect areas will test defined porphyry targets within the Priority 1 target areas.
FAR EAST GOLD ASX ANNOUNCEMENT
10
ASX ANNOUNCEMENT MARCH 2024 QUARTERLY EXPLORATION UPDATE 26 APRIL 2024
WONOGIRI PROJECT – CENTRAL JAVA, INDONESIA
In the Wonogiri project the Company engaged an independent external consultant to prepare an updated feasibility study as
part of securing the IUP operation and production permit to allow development and operation of a mine on the site.
No substantial exploration field activities, mining production or development activities were carried out by the Company on the
Wonogiri project during the quarter.
FAR EAST GOLD ASX ANNOUNCEMENT
11
ASX ANNOUNCEMENT MARCH 2024 QUARTERLY EXPLORATION UPDATE 26 APRIL 2024
WONOGIRI
BLUE GRASS CREEK
U
REEDY CREEK
MT CLARK WEST
HILL 212
LD
N
0
10 0
200
KM
BLUE GRASS CREEK
MT CLARK WEST
Mackay
Hay Point Port
REEDY CREEK
HILL212
DRUMMOND
BASIN
Figure 9: Location of FEG project areas in Queensland, Australia.
AUSTRALIA PROJECT ACTIVITIES
The Company has entered into Deeds of Amendment for all three Australian projects upon notice that it satisfied the earnin expenditure obligations to retain its 90% interest in the projects. Additionally, the Company entered into a new Earn-in
Agreement and fully acquired a 90% interest in the Reedy Creek project. The Reedy Creek tenement directly adjoins the
Company’s Hill 212 and Bluegrass Creek tenements and covers an area of approximately 3,600 ha that includes the
interpreted structural corridor linking these projects.
HIGHLIGHTS:
- FEG holds 90% interests in its three Australian projects located in Queensland Province. Hill 212 Gold Project, Bluegrass
Creek Gold Project and Mount Clark West Copper Gold Project are held under three separate up-front Earn-in Agreements
all dated 1 November 2021. Under the terms of the original Earn-in Agreements, FEG would retain its 90% interest in
these three tenements by meeting specified staged earn-in expenditure obligations that total $4,688,000 on or before 1
November 2024 and committing to fund a Pre-Feasibility Study (PFS) for each project (See: Section 12 of the Company’s
Prospectus released to the ASX on 25 March 2022).
FAR EAST GOLD ASX ANNOUNCEMENT
12
ASX ANNOUNCEMENT MARCH 2024 QUARTERLY EXPLORATION UPDATE 26 APRIL 2024
The expenditure commitments were as follows:
STAGE 1
STAGE 2
STAGE 3
COMMITMENT
COMMITMENT
COMMITMENT
TOTAL
TENEMENT
(BY 1 NOV 2022)
(BY 1 NOV 2023)
(BY 1 NOV 2024)
(TO RETAIN 90%)
Hill 212
$250,000
$250,000
$2,200,000
$2,700,000
plus commit to fund PFS
Bluegrass Creek
$26,000
$62,000
$900,000
$988,000
plus commit to fund PFS
Mount Clark West
$185,000
$225,000
$590,000
$1,000,000
plus commit to fund PFS
- On 21 February 2024, the Company entered into Deeds of Amendment for the up-front Earn-in Agreements with the vendors
of the Hill 212 Gold Project, Bluegrass Creek Gold Project and Mount Clark West Copper Gold Project. Under the terms of
these Deeds of Amendment, the Company will now retain its 90% interest in the projects without any further specified
expenditure obligations and the vendors will retain their free-carry to completion of the Feasibility Study at which point the
vendors may elect to take a 2% Net Smelter Royalty and the Company’s interest in the projects will increase to 100%.
REEDY CREEK PROJECT – EARN-IN AGREEMENT
On 5 February 2024, Exploration Permit for Mineral (EPM) 28601 (Environmental Authority number P-EA-100301916) for the
Reedy Creek project was granted to Ellenkay Gold Pty Ltd (‘Ellenkay’) for a period of 5 years.
On 26 February 2024 the Company entered into an Earn-in Agreement with Ellenkay for the Company to acquire a 90% interest in
the Reedy Creek project. Ellenkay are also the vendors for the Company’s other three Australian projects.
Under the terms of this new Earn-in Agreement the parties agreed that the Company is fully responsible for the management of
the project, has fully acquired a 90% interest in the project without any specified annual or staged expenditure obligations and
the vendor has a free-carry to completion of the Feasibility Study at which point the vendor may elect to take a 2% Net Smelter
Royalty and the Company’s interest in the Reedy Creek project will increase to 100%.
HILL 212, BLUEGRASS CREEK & REEDY CREEK - ‘EXPLORATION PROJECT’ STATUS
Upon registration of the Company’s 90% interest in the Reedy Creek project’s tenement, the Company plans to make application
to the Queensland Government under the Mineral Resources Act 1989 to have the Company’s three contiguous EPMs (Hill 212,
Bluegrass Creek and Reedy Creek) designated with ‘Exploration Project’ status.
‘Exploration Project’ status is given by the Queensland Government to projects involving two or more EPMs that have a unifying
exploration purpose. Having the Company’s three contiguous EPMs designated as an ‘Exploration Project’ would provide greater
flexibility to the Company in managing these tenements. The status applies in the Queensland Government’s consideration of
variations to work programs, relinquishments, renewals and would potentially allow the Company to nominate off-sets through a
variation of permit conditions where required to comply with conditions of individual permits.
FAR EAST GOLD ASX ANNOUNCEMENT
13
ASX ANNOUNCEMENT MARCH 2024 QUARTERLY EXPLORATION UPDATE 26 APRIL 2024
REEDY CREEK PROJECT – OVERVIEW
The Reedy Creek project’s tenement (EMP 28601) adjoins the Hill 212 project’s tenement (EMP 26217) to the west and the
Bluegrass Creek project’s tenement (EMP 27794) to the north. Together the combined project area for the Company’s three
directly adjoining tenements covers a total of approximately 7,760 ha within the very prospective Drummond Basin region in
Central Queensland.
The Reedy Creek project is situated approximately 30km east of the Mount Coolon Project which is currently being explored
by Newmont (NYSE:NEM) under a farm-in agreement with GBM Resources Ltd (ASX:GBZ). Newmont can acquire up to 75%
interest in the Mount Coolon Project by spending A$25 million and completing a series of exploration milestones in a 3 stage
farm-in over six years. Newmont has spent approximately A$7.4 million under the farm-in agreement (See: ASX:GBZ release
dated 31 January 2024).
The Hill 212 project area is situated along strike of several interpreted structural corridors that appear to control defined alteration
and mineralisation within the adjacent Mount Coolon Project’s tenement areas. Recent spectral mapping has identified a zone of
alteration similar to those associated with the Mount Coolon Project’s reported gold deposit areas.
The Mount Coolon Project’s epithermal gold mineralisation at the Glen Eva, Eugenia, Sullivans and Verbena prospects and the
historic Koala Mine appear to be controlled by several interpreted northwest-southeast trending structural corridors. Mineralised
zones are reflected by zones of intense silicic and argillic alteration. Such areas are clearly discernable by detailed remote
sensing techniques.
Using the distinctive alteration signatures for the Mount Coolon Project’s prospect areas, FEG commissioned an Aster and
Landsat satellite imagery evaluation of the Hill 212, Bluegrass Creek and Reedy Creek project areas. The work was completed
by Earthscan Pty. Ltd.
Refer to the Company’s ASX release of February 28, 2024 for details of the spectral study completed over the
Reedy Creek tenement.
Using the Mount Coolon Project’s Verbena prospect area as a type section to calibrate their remote sensing algorithms, Earthscan
was able to define similar alteration signatures within the Hill 212 project area including the newly acquired Reedy Creek
tenement. The survey identified 18 spectral anomalies with signatures similar to those marking the Mount Coolon Project’s gold
deposit areas. The remote sensing interpretation is corroborated by regional airborne magnetic data which infers continuation of
interpreted structural corridors into the Hill 212 project area.
FAR EAST GOLD ASX ANNOUNCEMENT
14
ASX ANNOUNCEMENT MARCH 2024 QUARTERLY EXPLORATION UPDATE 26 APRIL 2024
Figure 10: General geology map for the Hill 212 project tenements. Geology is dominated by rhyolite and dacitic volcanics over most of the project area
with the Bluegrass granite in the northeast portion of the project area. The datum is MGA Zone 55 (GDA 94).
The location of the Company’s Hill 212 project area relative to defined areas of epithermal gold mineralisation and interpreted
structural features in the Mount Coolon Project is shown in Figure 2. Based on this interpretation, the northwest-southeast
trending structural corridors identified within the Mount Coolon Project extend into the Hill 212 project area. Furthermore, the
defined northeast trending structural corridor that hosts and controls epithermal quartz veins within the Hill 212 tenements is also
consistent with the regional structural framework interpreted for the Mount Coolon Project.
HILL 212 PROJECT – QUEENSLAND
No substantial exploration activities, mining production or development activities were carried out by the Company on the Hill 212
project during the quarter.
BLUEGRASS CREEK PROJECT – QUEENSLAND
No substantial exploration activities, mining production or development activities were carried out by the Company on the Blue Grass
Creek project during the quarter.
MOUNT CLARK WEST PROJECT – QUEENSLAND
No substantial exploration activities, mining production or development activities were carried out by the Company on the Mount Clark
West project during the quarter.
REEDY CREEK - QUEENSLAND
No substantial exploration activities, mining production or development activities were carried out by the Company on the Reedy Creek
project during the quarter.
FAR EAST GOLD ASX ANNOUNCEMENT
15
ASX ANNOUNCEMENT MARCH 2024 QUARTERLY EXPLORATION UPDATE 26 APRIL 2024
TENEMENT SUMMARY
TENEMENT
MINEROLOGY
CURRENT PERCENTAGE
PROJECT
LOCATION
MINING LICENCE TYPE
AREA
TYPE
BENEFICIAL OWNERSHIP
Woyla Copper
Gold Project
Aceh, Indonesia
6th Generation
Contract of Work
24,260 ha
Porphyry and
Epithermal
51% - will increase to
80% upon completion
of maiden JORC
resource estimate
and Indonesian
Govt feasibility study
Trenggalek Copper
Gold Project
East Java,
Indonesia
IUP – Operation a
nd Production
12,813 ha
Porphyry and
Epithermal
100%
Wonogiri Copper
Gold Project
Central Java,
Indonesia
IUP – Exploration
3,928 ha
Porphyry and
Epithermal
100%
Mount Clark West
Copper Gold Project
Connors Arc
Queensland,
Australia
Exploration Permit
Minerals (EPM)
1,912 ha
Porphyry
90%
Hill 212 Gold Project
Drummond Basin
Queensland,
Australia
Exploration
Permit Minerals
(EPM)
1,920 ha
Epithermal
90%
Blue Grass Creek
Gold Project
Drummond Basin
Queensland, Australia
Exploration Permit
Minerals (EPM)
2,240 ha
Epithermal
90%
Reedy Creek
Drummond Basin
Queensland, Australia
Exploration Permit
Minerals (EPM)
3,840 ha
Epithermal
90%
Table 1: List of FEG projects and current status as at end Q1 2024.
FAR EAST GOLD ASX ANNOUNCEMENT
16
APPENDICES
ASX ANNOUNCEMENT MARCH 2024 QUARTERLY EXPLORATION UPDATE 26 APRIL 2024
APPENDIX 1: WOYLA COMPILED SIGNIFICANT INTERSECTIONS
The tables below list compiled significant intersections for drillhole assays received during the March report period. The results
include drillhole assays from the Pertama, Susi vein systems at Rek Rinti and. Refer to Figures 2 and 3 for Rek Rinti drill hole.
Compiled significant assay results received for drillholes from the Susi and Pertama vein zones during the reporting Quarter.
Intervals where no core was recovered due to previous artisanal mining are indicated. Intersection intervals are reported in
meters and zone widths are reported as intersected downhole (not true width).Significant intersections were compiled using
0.2g/t Au cut-off with no more than 1m of consecutive internal dilution (below-cut off) included. No top cut of gold assays has
been applied. Au Equivalent (AuEq) is based on USD$1,800/oz gold and USD$22/oz silver (Au g/t +(Ag g/t * 0.012)).
FAR EAST GOLD ASX ANNOUNCEMENT
18
ASX ANNOUNCEMENT MARCH 2024 QUARTERLY EXPLORATION UPDATE 26 APRIL 2024
DISCLOSURE UNDER ASX LR 5.3.4 USE OF FUNDS SINCE LISTING
In addition to the Appendix 5B disclosure below the Company has included the following use of funds table that was included in
the Company’s IPO disclosure documents for minimum subscription of $8 million and maximum subscription of $12 million. In
Addition, in December 2022 the company raised $6.5 million in a placement and under a Share Purchase Plan (SPP).
Table 7 below has been updated to include the additional $6.5 million raised under the placement and SPP in December 2022, the
additional $6,889,500 raised under the placement in August 2023 and to show the actual spend for the period from the Company’s
IPO on 28 March 2022.
MINIMUM
MAXIMUM
SUBSCRIPTION
SUBSCRIPTION
FUNDS
AVAILABLE
ACTUALS SINCE
LISTING ON 28 MARCH
% OF
$8 MILLION
% OF
FUNDS
$12 MILLION
% OF
FUNDS
2022
FUNDS
SOURCE OF FUNDS
Existing cash reserves
167,000
0.7%
166,000
0.6%
204,845
0.8%
Funds raised from the Offer
8,000,000
35.5%
12,000,000
45.2%
11,754,000
46.4%
Refund of
reclamation guarantee
1,008,000
4.5%
1,008,000
3.8%
-
0.0%
Funds raised from
Placement and Share
Purchase Plan (SPP) in
December 2022
6,500,000
28.8%
6,500,000
24.5%
6,500,000
25.6%
Funds raised from
Placement in August 2023
6,889,500
30.5%
6,889,500
25.9%
6,889,500
27.2%
Total
22,564,500
100.0%
26,563,500
100.0%
25,348,345
100.0%
Cost of initial public
offering, placements a
nd SPP
589,000
6.4%
834,000
6.3%
1,814,736
8.0%
General
administration expenses
833,000
9.1%
1,305,000
9.9%
4,599,652
20.3%
Acquisition
1,672,000
18.2%
1,894,000
14.4%
1,567,857
6.9%
Permitting
640,000
7.0%
640,000
4.9%
1,171,024
5.2%
Site & Permit Management
652,000
7.1%
652,000
4.9%
544,982
2.4%
Exploration and Evaluation
3,791,000
41.3%
6,284,000
47.7%
11,670,344
51.5%
Site & Permit Management
60,000
0.7%
60,000
0.5%
61,878
0.3%
Exploration and Evaluation
938,000
10.2%
1,505,000
11.4%
1,244,639
5.5%
9,175,000
100.0%
13,174,000
100.0%
22,675,113
100.0%
FUNDS ALLOCATION
INDONESIAN PROJECTS
AUSTRALIAN PROJECTS
Total
FAR EAST GOLD ASX ANNOUNCEMENT
19
ASX ANNOUNCEMENT MARCH 2024 QUARTERLY EXPLORATION UPDATE 26 APRIL 2024
CAPITAL STRUCTURE
The following table 8 provides a summary of the Company’s securities on issue as at 31 March 2024.
SECURITY DESCRIPTION
NO.
Ordinary fully paid shares
257,628,835
Unlisted options @ $0.25, expiry 31 December 2024
12,000,000
Unlisted options @ $0.40, expiry 21 August 2026
1,000,000
2024 Performance rights, measurement date 31 December 2023
400,000
024 Performance rights, measurement date 31 December 2024
400,000
2022 – 2024 Performance rights, measured throughout period to the expiry date 31 December 2024
2,000,000
Table 8: Far East Gold Ltd’s capital structure as at 31 March 2024
PAYMENTS TO RELATED PARTIES AND THEIR ASSOCIATES
Payments of $144K reported in Item 6.1 of the attached Appendix 5B relate to salaries and fees paid to Directors.
Competent Person’s Statement
The information in this report that relates to Exploration Results and Mineral Resources is based on information compiled by FEG
staff and approved by Michael C Corey, who is a Member of the Association of Professional Geoscientists of Ontario, Canada.
Michael Corey is employed by the Company and has sufficient experience which is relevant to the style of mineralisation and type
of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012
Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Michael Corey has
consented to the inclusion in this report of the matters based on his information in the form and context in which they appear.
About Far East Gold
Far East Gold Limited (ASX: FEG) is an ASX listed copper/gold exploration company with seven advanced projects
in Australia and Indonesia.
FAR EAST GOLD ASX ANNOUNCEMENT
20
Rule 5.5
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
Far East Gold Limited
ABN
Quarter ended (“current quarter”)
68 63
Share your feedback
Discover