Quarterly Activities/Appendix 5B Cash Flow Report
Released
Released
Announcement PDF
ASX ANNOUNCEMENT
30 OCTOBER 2025
REPORT ON ACTIVITIES FOR THE
QUARTER REPORT ENDED 30
SEPTEMBER 2025
(ASX: FEG)
FAR EAST GOLD LTD ACN 639 887 219
WWW.FAREAST.GOLD
2
FAREASTGOLDASX ANNOUNCEMENT
ASX ANNOUNCEMENT-
SEPTEMBER2025 QUARTERLY EXPLORATION UPDATE
Far East Gold Ltd (‘FEG’ or ‘the ‘’Company’) is pleased to report a high-intensity quarter of exploration activity
across its Indonesian portfolio. Extensive drilling, surface sampling, structural targeting and mapping have
delivered multiple new discoveries and important expansions to known mineralised systems at the Idenburg
Project for the quarter ending 30 September 2025.
HIGHLIGHTS:
▪ Drilling Program at Bermol Confirms Depth Extensions
• 10 drillholes (BRD008–017) were completed for a total of 1,169.6 m, testing the Bermol fault/shear
zone over ~650 m of strike1.
• Results confirm the presence of gold-mineralised shear zones and quartz veins at depth beneath
previously reported zones, indicating strongpotential toexpand mineralised structures tothe southofthe
current Bermol system.
Significant intercepts include:
➢ BRD011: 4.7 m @ 2.26 g/t Au from 92.4 m, including 1.7 m @ 3.97 g/t Au; and 4.0 m @ 2.75
g/t Au from 160 m, including 1.5 m @ 6.05 g/t Au and 0.5 m @ 11.02 g/t Au.
➢ BRD008: 5.2 m @ 1.67 g/t Au, including 0.5 m @ 8.72 g/t Au and 0.5 m @ 5.41 g/t Au.
➢ BRD010: 2.0 m @ 3.17 g/t Au from 46.9 m, including 0.9 m @ 6.58 g/t Au.
These results underpin the scale and continuity of Bermol and provide a strong platform for further
resource definition.
▪ New Discovery – North Bermol Prospect
As a result of the exploration activities conducted during thequarter, the Company announced a New Discovery
at the North Bermol Prospect within the Idenburg Project – see the ASX announcement dated 28 October 20252,
the Company announced a New Discovery at the North Bermol Prospect within the Idenburg project.
• The new high-grade North Bermol prospect is located approximately 1.5 km northwest of Bermol.
• Surface sampling confirmed previously unrecognised deformation zones with quartz-sulphide veins
assaying up to 53 g/t Au, opening up a new structural feature for drilling.
• A 17-hole scout drilling program has commenced, with assays received for 5 of 12 holes drilled to date.
High Grade results from North Bermol include:
➢ BND003: 2.6m at 3.9 g/t Au from 11.3m, including 0.5m at 15 g/t Au from 12.4m.
➢ BND004: 5m at 4.9g/t Au from 23.5m, including 1.6m at 12.8 g/t Au from 24.8m.
➢ BND005: 2.8m at 8.4 g/t Au from 32m, including 1.6m at 12.3 g/t Au from 33.2m
These results confirm the high-grade tenor of mineralisation and the potential for a second significant
discovery hub at Idenburg. Refer to ASX announcement of October 28, 20252.
▪ Expanded Target Pipeline – Idenburg Project – 14 Priority Structural Targets Identified
• A comprehensive structural interpretation conducted by Murphy Geological Services identified 14 new
high-priority targets across the Idenburg3.
• These targets significantly expand the Company’s discovery pipeline, with multiple new zones already
identified through field verification.
▪ Idenburg – PIPPIB Approval – Forestry Downgrade - Regulatory Milestone Secured
• 8,950.28 Ha of PIPPIB forestry reclassification approved, de-risking the project and providing regulatory
certainty.
3
FAREASTGOLDASX ANNOUNCEMENT
ASX ANNOUNCEMENT-
SEPTEMBER2025 QUARTERLY EXPLORATION UPDATE
Managing Director & CEO Shane Menere said:
“This has beenoneof themost productiveand strategicallyimportantquarters forFar East Gold sinceour inception.
Our team has worked relentlessly across multiple fronts advancing mapping, sampling, permitting, and drilling
programs, to unlock the significant potential within our Indonesian gold portfolio.
At Idenburg, we have been deeply engaged in drilling across three key prospect areas, with work confirming the
scale and continuity of gold-bearing structures at Bermoland exciting new high-grade results emerging fromNorth
Bermol. Preparations are also well advanced to commence drilling at the Kwaplu high-grade zone, while assays
remain pending from the known high-grade Sua prospect, both of which have the potential to deliver further
material growth for the Company.
The granting of the 9,000-hectare PIPPIB reclassification was another major milestone, providing regulatory
certaintyand allowing us toaccelerate explorationand development activities across our broader Idenburgtenure.
In parallel, we are advancing toward drilling commencement at Mount Clark West in Queensland and finalising
preparations for near-term drilling at the Trenggalek Copper-Gold Project in East Java.
We continue to engage with several Indonesian and multinational groups who have expressed strong interest in
partnering with Far East Gold as we move toward the next phase of growth. These discussions underscore the
quality of our assets and the credibility of the exploration foundation we’ve built.
Withmultipledrillprogramsnowactiveorimminent, and asteadystreamofassayresults expected overthecoming
months, we are entering a period of consistent news flow and value creation. The groundwork has been laid — and
we are now delivering tangible results for our shareholders as we advance toward a new era of discovery and
development.”
Figure 1: Map showing location of FEG projects in Indonesia and Australia
4
FAREASTGOLDASX ANNOUNCEMENT
ASX ANNOUNCEMENT-
SEPTEMBER2025 QUARTERLY EXPLORATION UPDATE
INDONESIAN PROJECT ACTIVITIES
IDENBURG GOLD PROJECT - WEST PAPUA PROVINCE, INDONESIA
Idenburg is a95,280 Ha 6th generation CoW located inthe same province hostingworld class multi-million-ounce
gold and copper deposits including Grasberg (+70 Moz Au), Porgera (+20 Moz Au), Frieda River (20 Moz Au) and
Ok Tedi (20 Moz Au). It is an advanced project with over US$25M in historical exploration including over 5,531
meters of diamond drilling. Of the 14 prospect areas identified only 5 prospects have been drill tested, with most
of the previous work (5,042m) focused within 3 main prospects which currently host a JORC inferred mineral
resource of 540,000 0z Au at 4.1 g/t Au. The mineralized zones intersected at each of the three prospects remain
open along strike and to depth. Only 30% of the CoW has been explored in detail. SMG Consulting (SMGC)
reported Exploration Targets for all 14 prospects identified within the Idenburg CoW area.
The JORC compliant resource estimates reported in the JORC Resource Report, PT Iriana Mutiara Idenburg,
November 2024’ Company ASX announcement of 16 December 20244 are consistent with the initial exploration
targets determined by SMGC in the June 2024 Exploration Target Report released by the Company on August 21,
20245.
Bermol Drilling Update:
Tenholes havebeencompleted across theBermol prospectfor atotalof 1,169.6m,testingtheBermolfault/shear
zoneover approximately650mof strike(Figure2).Assays havenow beenreturned for allholes BRD008toBRD017.
Compiled significant intersections from drill hole assays are shown in Table 2 and include:
• BRD011: 4.7m @ 2.26 g/t Au from 92.4m; including 1.70m @ 3.97 g/t Au from 94.4m and a further 4.0m @
2.75 g/t Au from 160m; including 1.5m @ 6.05 g/t Au from 160m and 0.5m @ 11.02 g/t Au from 161m
• BRD008: 5.2m @ 1.67 g/t Au including 0.5m @ 8.72 g/t Au from 38m and 0.5m @ 5.41 g/t Au from 41.7m
• BRD010: 2m @ 3.17 g/t Au from 46.9m; including 0.9m @ 6.58 g/t Au from 47.4m.
The results confirmed the continuity of the Bermol shear zone and the presence of gold-bearing structures
consistent with historical PT Iriana Mutiara Idenburg (IMI) drilling and, importantly, identified new areas of
mineralisation not currently included inthe existing JORC(2012) inferred resource (referred toASX Announcement
25 August 2025)1.
Table 1:Below: Collar details for completed FEGdrill holes at Bermol Holenumbering for the FEG program was continued from the last hole
number from historical drilling (BRD007. Hole coordinates are in meters and conform to the WGS 84 /UTM Zone 54S reference system.
Hole ID Easting Northing RL Azimuth Inclination Total Depth
BRD008 461724 9587047 867 55 60 70.50
BRD009 461724 9587047 867 300 60 128.80
BRD010 461743 9587325 743 0 90 100,00
BRD011 461743 9587325 743 270 56 171.50
BRD012 461732 9587412 725 0 90 141.50
BRD013 461814 9587886 578 0 90 110.60
BRD014 461826 9588002 551 90 60 133.80
BRD015 461870 9588304 494 0 90 57.50
BRD016 461694 9586953 873 0 90 105.30
BRD017 461739 9587287 752 210 45 150.10
Total Meters 1,169.60
5
FAREASTGOLDASX ANNOUNCEMENT
ASX ANNOUNCEMENT-
SEPTEMBER2025 QUARTERLY EXPLORATION UPDATE
Figure 2: 3D plan map showing locations of completed (yellow), planned (white) and historical (black) drill holes. Refer to Table 1 for
completed hole coordinates. The interpreted trace of the Bermol shear zone and quartz vein system is shown in orange.
The initial results demonstrate the potential to expand the mineralised system at Bermol to the south beyond the
current resource boundary.
6
FAREASTGOLDASX ANNOUNCEMENT
ASX ANNOUNCEMENT-
SEPTEMBER2025 QUARTERLY EXPLORATION UPDATE
Figure 3: Bermol plan map showing the surface extent of the Bermol JORC 2012 inferred resource as determined by SMGC relative to the
locations of completed FEG holes BRD008 to 017 and historical IMI drill holes BRD001 to 007. The current drill program is focused on
expanding andupgrading the SMGCinferredresource extent.RefertoFigure 2showing cross-sectionof drillholes BRD009,008,001. Map
coordinates are in meters and conform to the WGS 84 / UTM Zone 56S reference system.
Refer to Table 2 for compiled significant intersections from the Bermol drill hole assays. There were no significant
intersections reported from drill holes BRD014 to BRD017.
7
FAREASTGOLDASX ANNOUNCEMENT
ASX ANNOUNCEMENT-
SEPTEMBER2025 QUARTERLY EXPLORATION UPDATE
Table 2:Below: Compiledsignificant intersections from FEGdrillholes BRD008 to BRD011. Intersections were compiled using a 0.2g/tAu
cut-off withnograde topcut.Amaximumof 3meterof internaldilutionwas included.RefertoTable 1forhole collardetails. Hole numbering
for the FEG program was continued from the last hole number of historical drilling at Bermol (BRD007). There were no significant
intersections reported from drill holes BRD014 to BRD017.
Hole From To Interval Au g/t
BRD008 37 42.2 5.20 1.67
Bermol incl 37.5 39.25 1.75 3.30
and incl 37.5 38 0.50 8.72
and 41.7 42.2 0.50 5.41
Hole From To Interval Au g/t
BRD009 113.3 117.3 4.00 0.49
Bermol incl 113.3 114.3 1.00 1.36
Hole From To Interval Au g/t
BRD010 46.9 48.9 2.00 3.17
Bermol incl 47.4 48.3 0.90 6.58
Hole From To Interval Au g/t
BRD011 92.4 97.1 4.70 2.26
Bermol incl 94.4 96.1 1.70 3.97
Bermol 145.5 146.5 1.00 0.46
Bermol 160 164 4.00 2.75
incl 160 161.5 1.50 6.05
incl 161 161.5 0.50 11.02
Hole From To Interval Au g/t
BRD012 58.8 64.7 5.90 0.90
Bermol incl 61.7 62.2 0.50 4.17
Hole From To Interval Au g/t
BRD013 101.7 103.2 1.50 0.76
Bermol incl 101.7 102.2 0.50 1.70
102.7 103.2 0.50 0.54
New Gold Bearing Zones Identified at North Bermol
DuringthequartertheCompanyreportedthediscoveryof newgold mineralised zones at theNorthBermol prospect,
located approximately 1.5km northwest of current drilling activities at the Bermol prospect.
Detailed geologicalmappingoutlined mineralised quartz veins and boudins up to1mthickwithintheNorthBermol
area. Assay results from grab samples returned grades of up to 25.9 g/t Au and 7.8 g/t Ag from sulphide-bearing
(arsenopyrite/pyrite) quartz veins over a 15m exposed outcrop. The mineralisation dips shallowly at ~20 degrees
and exhibits a style consistent with that already identified at Bermol, supporting the interpretation that both areas
are linked within a broader 4km-long, northeast-trending structural corridor.
8
FAREASTGOLDASX ANNOUNCEMENT
ASX ANNOUNCEMENT-
SEPTEMBER2025 QUARTERLY EXPLORATION UPDATE
Figure 4: Mapshowing the Bermoldistrictprospectareas andthe location of recentsurface rocksamples (inyellow) withgoldassay results.
Samples and assay in white are from reporting of mapping results in the Company ASX announcement 9 April 2025. The new discovery of
high-grade gold in quartz veins at North Bermol is shown. See Figures 3 and 4. Refer to Table 1 for sample location and assay details of
samples shown. A review and discussion of historical exploration and assessment of resource potential can be found in the Company ASX
announcement of announcement 21 August 2024.
Discovery of High-Grade Gold at the North Bermol Prospect
Subsequent to the end of Quarter 3 assay results were received for the first 5 drill holes from the North Bermol
prospect. Refer to ASX announcement of October 28, 20252.
Significant drilled intersections include:
• BND003: 2.6m at 3.9 g/t Au from 11.3m, including 0.5m at 15 g/t Au from 12.4m.
• BND004: 5m at 4.9g/t Au from 23.5m, including 1.6m at 12.8 g/t Au from 24.8m
• BND005: 2.8m at 8.4 g/t Au from 32m, including 1.6m at 12.3 g/t Au from 33.2m
9
FAREASTGOLDASX ANNOUNCEMENT
ASX ANNOUNCEMENT-
SEPTEMBER2025 QUARTERLY EXPLORATION UPDATE
Figure 5: Cross section (looking North) showing the trace of the North Bermol shear zone and significant intersections within holes
BND004/005. Mineralisation remains open laterally and down-dip within the shear plane. Refer to Figure 6 for hole locations.
10
FAREASTGOLDASX ANNOUNCEMENT
ASX ANNOUNCEMENT-
SEPTEMBER2025 QUARTERLY EXPLORATION UPDATE
Figure 6:Imageshowing the NorthBermolprospectareas andthe locationof completedNorthBermoldrillholes.Assays have beenreported
for drill holes BND 001 to 005. Refer to Table 3 for hole collar details and Table 4 for compiled significant intersections. Refer to ASX
announcement of October 28, 2024. Coordinates are referenced to datum WGS84, zone 54 south.
11
FAREASTGOLDASX ANNOUNCEMENT
ASX ANNOUNCEMENT-
SEPTEMBER2025 QUARTERLY EXPLORATION UPDATE
Figure 7:Above:3Dmodelshowing the assumedextentof the NorthBermol shearzone.The shearzone is interpretedtooccuras alowangle
plane, that ranges from 2-6m in thickness and dips to the northeast. Below: interpreted long section (looking west) showing the extent of
the shear plane from south (left) to north (right). Holes BND011/012 intersectedthe interpreted shear plane with sulphides and assays are
pending.
Based on the drill results the North Bermol shear zone is a broad, shallow dipping (15°) plane that strikes to the
northwest and dips to the northeast. The shear zone has been intersected to a depth of about 30m and has an
apparent true thickness of 2-6 meters. 3D modelling of current drill results suggest that the shear plane has a
minimum strike extent (to NW) of 300m and a dip extent (to NE) of about 400m. The latter is based on visual
confirmation of intense shear deformation within holes BND011 and 012. Assays are pending for these holes.
12
FAREASTGOLDASX ANNOUNCEMENT
ASX ANNOUNCEMENT-
SEPTEMBER2025 QUARTERLY EXPLORATION UPDATE
Table 3: Below: Collar details for completed drill holes within the North Bermol prospect area as of Oct. 27. Coordinates are referenced to
datum WGS84, zone 54 south. Refer to Figure 4 for drill hole locations
Hole ID Easting Northing RL Azimuth Inclination
Total
Depth
BND001 462350 9588835 533.921 180 45 59.90
BND002 462350 9588835 534.349 0 90 50.2
BND003 462697 9589860 364 290 45 100.8
BND004 462523 9589735 494.41 225 73 50
BND005 462520 9589740 494.41 55 58 49.1
BND006 462570 9589717 418 225 79 30.1
BND007 462570 9589717 418 57 45 40.2
BND008 462429 9589820 465 225 70 150.2
BND009 462468 9589773 430 225 90 54
BND010 462653 9589639 396 280 60 60.3
BND011 462641 9590032 358 225 50 31.4
BND012 462645 9590037 358 45 68 40.5
Total Meters 716.70
Table 4: Below: Compiledsignificantintersections from FEGdrillholes BND001to BND005.Intersections were compiledusing a0.2 g/tAu
cut-off with no grade top cut. A maximum of 3 meters of internal dilution was included. Refer to Table 1 for hole collar details. Assays are
pending for North Bermol drill holes BND006 to 012.
Hole Prospect From To Interval Au g/t
BND001 North Bermol No Significant Assays
Hole Prospect From To Interval Au g/t
BND002 North Bermol No Significant Assays
Hole Prospect From To Interval Au g/t
BND003 North Bermol 0 1.1 1.10 0.32
North Bermol 11.3 13.9 2.60 3.99
incl 12.4 12.9 0.50 15.01
Hole Prospect From To Interval Au g/t
BND004 North Bermol 23.5 28.5 5.00 4.90
incl 24.8 26.4 1.60 12.85
28.1 28.5 0.40 1.09
Hole Prospect From To Interval Au g/t
BND005 North Bermol 32 34.8 2.80 8.44
incl 33.2 34.8 1.60 12.30
and 33.2 34 0.80 16.59
13
FAREASTGOLDASX ANNOUNCEMENT
ASX ANNOUNCEMENT-
SEPTEMBER2025 QUARTERLY EXPLORATION UPDATE
Fourteen High-Priority Structural Targets Identified
A detailed structural assessment completed by Murphy Geological Services (MGS) using high-resolution Sentinel-
2 satellite defined a number of structuraltargets for ground follow-up. The structural interpretation was combined
with the results of historical exploration to identify 14 high property structural targets. Refer to company ASX
announcement of 2 September 20253. Figure 4 displays the distribution of priority structural targets defined by
MGS. Both Bermol and the North Bermol prospect areas were identified as `Priority 1’ targets and are included
as part of the 11 Priority 1, 8 Priority 2, and 10 Priority 3 structural target ranking defined by MGS.
Figure 8: Image of the Idenburg CoW showing priority structural targets identified by a comprehensive interpretation of available satellite
data.TheworkidentifiedanumberofPriority1and2structuraltargetsforfollow-updetailedmappinganddrilltargetdefinition.The location
of the Bermolprospectareais indicatedas is the extentof the interpretedstructuralcorridorwhichextends fromBermoltothe NorthBermol
prospect area. Coordinates are referenced to WGS84 UTM Zone 54 South.
WOYLA PROJECT – ACEH PROVINCE, INDONESIA
The Company’s Woyla Copper Gold Project is a 24,260-ha 6th generation Contract of Work (COW) located in the
Aceh region of North Sumatra, Indonesia (Figure 1). FEG holds a 51% interest in the project that will increase to
80% upon the Company completing a feasibility study approved by the Indonesian mines department (ESDM). The
Company continues to assess and define quartz vein targets within the extensive (26,000m) structural systemthat
hosts gold mineralisation. Refer to Company ASX announcement of 8 April 20247.
The Company has prepared a long-term project plan for Woyla as requested by ESDM which will enable the
Company to extend the COW. There was no exploration activities completed during the September 2025 quarter.
14
FAREASTGOLDASX ANNOUNCEMENT
ASX ANNOUNCEMENT-
SEPTEMBER2025 QUARTERLY EXPLORATION UPDATE
TRENGGALEK COPPER-GOLD PROJECT – CENTRAL JAVA, INDONESIA
The Company is in advanced preparation for the planned drill program that will test defined porphyry targets.
Additional mapping and surface rock sampling over targets areas were also completed. The Company continues
to engage with local communities to begin Phase 1 drilling during the 4th quarter of 2025.
Drilling is anticipated to begin in Q4 2025.
WONOGIRI COPPER-GOLD PROJECT – CENTRAL JAVA, INDONESIA
During the quarter the Company engaged with the Mining Department (ESDM) to extend the IUP Exploration to a
further 12 months. There was no exploration activities completed during the September 2025 quarter.
AUSTRALIA PROJECT ACTIVITIES
BLUE HILL CREEK PROJECT – QUEENSLAND
The Company is preparing field mapping activities.
There was no exploration activities completed during the September 2025 quarter.
15
FAREASTGOLDASX ANNOUNCEMENT
ASX ANNOUNCEMENT-
SEPTEMBER2025 QUARTERLY EXPLORATION UPDATE
MOUNT CLARK WEST PROJECT – QUEENSLAND
A landowners CCA (compensation agreement) has been signed allowing drilling to commence. Drilling contract
has been signed, and drilling will progress in Q4 2025.
There was no exploration activities completed during the September 2025 quarter.
TENEMENT SUMMARY
Table 5: List of FEG projects and current status at the end Q3 2025. The Company did not acquire or dispose of any mining tenements or
change its beneficial interest in the Company’s Indonesian and Australian projects during the Quarter under review.
PROJECT LOCATION
MINING LICENCE
TYPE
TENEMENT
AREA
MINERALOGY TYPE
CURRENT PERCENTAGE BENEFICIAL
OWNERSHIP
Woyla
Copper Gold
Project
Aceh,
Indonesia
6th Generation
Contract of Work
24,260 ha Porphyry and Epithermal 51% - will increase to 80% upon completion
of Indonesian Govt feasibility study
Trenggalek
Copper Gold
Project
East Java,
Indonesia
IUP – Operation
and Production
12,813 ha Porphyry and Epithermal 100%
Wonogiri
Copper Gold
Project
Central Java,
Indonesia
IUP – Exploration 3,928 ha Porphyry and Epithermal 100%
Idenburg
Gold
Project
Papua & Papua
Pegunungan,
Indonesia
IUP-Exploration 95,280 Orogenic Gold 51% upon issuing the final consideration
shares to the vendor that will increase to
80% upon completion of Indonesian Govt
feasibility study.
Mount Clark
West Copper
Gold Project
Connors Arc
Queensland,
Australia
EPM 26008 1,912 ha Porphyry 90%
Blue Hill
Creek Gold
Project
Drummond
Basin
Queensland,
Australia
EPM’s 26217,
27794 & 28601
8,000 ha Epithermal 90%
SUMMARY OF EXPENDITURE
During the quarter, the Company recorded total exploration-related expenditure of $235,000, which included
$103,000 allocated to supporting exploration activities and employee salaries. Additionally, $1.1 million was
spent on drilling operations and associated support at the Idenburg Project. Further details are available in the
attached Cashflow Report (Appendix 5B).
No expenditure was incurred on mining, production, or development activities during the reporting period.
PAYMENTS TO RELATED PARTIES AND THEIR ASSOCIATES
Payments totaling $201,000, as reported in Item 6 of Appendix 5B, include $154,000 in salaries and fees paid
to Directors, and $47,000 in employee benefits provided to the Managing Director.
16
FAREASTGOLDASX ANNOUNCEMENT
ASX ANNOUNCEMENT-
SEPTEMBER2025 QUARTERLY EXPLORATION UPDATE
ASX Announcements referenced to directly, or in commentary of, this quarterly activities release
1ASX: FEG 25 August 2025 “Depth Extensions Confirmed at Idenburg by Initial Drilling Results”
2ASX: FEG 28 October 2025 “Gold Discovery at North Bermol Confirms Idenburg’ s District-Scale Potential”
3ASX: FEG 2 September 2025 “Idenburg Project – Major Expansion of Exploration Targets 14 New High Priority
Targets Identified”
4ASX: FEG 16 December 2024 “Amended Idenburg Announcement and Independent JORC Resource Report”
5ASX: FEG 21 August 2024 “Addendum to Announcement”
6ASX: FEG 16 December 2024 “Amended Idenburg Announcement and Independent JORC Resource Report”
7ASX: FEG 8 April 2024 “Woyla’s Victory Vein delivers High-Grade Gold Epithermal Vein Strike Length Extended to
18.5KM ”
Competent Person and Compliance Statement
The information in this announcement that relates to exploration results (Including JORC Tables) is based on and
fairly represents information and supporting documentation prepared, reviewed and approved by Mr Michael C
Corey, a competent person who is a member of the Association of Professional Geoscientists of Ontario (APGO),
Canada. Mr Michael C Corey is employed on a consulting basis by Far East Gold Limited as the General Manager
of Exploration. Mr Michael C Corey has sufficient experience which is relevant to the style of mineralisation and
type of deposits under consideration and to the activity being undertaken to qualify as a Competent Person as
defined in the 2012 edition of the JORC Code. Mr Michael C Corey has provided his prior written consent as to the
form and context in which the exploration results and the supporting information are presented in this
announcement.
All information compiled and footnoted above 1 - 7 in this Quarterly review has been previously announced on the
ASX and the statements included fairly represent a summary of the supporting information and documentation.
The Company confirms that it is not aware of any information or data that materially affects the information
included in the announcements and that all material assumptions and technical parameters underpinning the
announcements continue to apply. The Company confirms that the form and context in which the Competent
Person’s findings are presented have not been materially modified from the original market announcements.
Idenburg Mineral Resource Estimate
The Company confirms that it is not aware of any new information or data that materially affects the information
included in the Idenburg Mineral Resource estimate and all material assumptions and technical parameters
underpinning the estimate continue to apply and have not materially changed when referring to its resource
announcement made on16 December 2024 ‘AmendedIdenburg Announcement andIndependent JORCResource
Report”.TheCompanyconfirmsthat theCompetent Persons’sfindingsarepresentedandhavenot beenmaterially
modified from the original market announcement.
Table 4: MineralResource table as estimatedby SMGCbasedonhistoricalexplorationdatausing acut-off grade of 0.1g/tAuwithnograde
capping applied to the IMI historical assays.3
17
FAREASTGOLDASX ANNOUNCEMENT
ASX ANNOUNCEMENT-
SEPTEMBER2025 QUARTERLY EXPLORATION UPDATE
Idenburg Exploration Target
The information referenced in the announcement that relates to the Exploration Target has previously been
released on the ASX. The Company confirms that it is not aware of any new information or data that materially
affectstheinformationincludedinthereport `IdenburgPTIrianaMutiaraIdenburgExplorationTarget Report,June
2024’ prepared by SMG Consultants and released by the Company on 15 August 2024 and 21 August 2024. All
material assumptions and technical parameters underpinning the determinations as stated by SMG Consultants
in the report continue to apply and have not materially changed. The Company confirms that the form and context
in which the Competent Person’s findings are presented have not been materially modified from those stated in
the original market announcements.
APPENDICES
ASX ANNOUNCEMENT-
SEPTEMBER2025 QUARTERLY EXPLORATION UPDATE
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 ofthe ASXListing Rules for defined terms.
Page 1
Appendix 5B
Mining explorationentity or oil and gas exploration entity quarterly cash flow report
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
Far East Gold Limited
ABN Quarter ended (“current quarter”)
68 639 887 219 30 September 2025
Consolidated statement of cash flows Current quarter
$A’000
Year to date (3
months)
$A’000
1. Cash flows from operating activities
- -
1.1 Receipts from customers
1.2 Payments for
(1,120) (1,120)
(a) exploration & evaluation
(b) development - -
(c) production - -
(d) staff costs (227) (227)
(e) administration and corporate costs (411) (411)
1.3 Dividends received (see note 3) - -
1.4 Interest received 178 178
1.5 Interest and other costs of finance paid
1.6 Income taxes paid
1.7 Government grants and tax incentives - -
1.8 Other (transaction cost) - -
1.9 Net cash from / (used in) operating
activities - -
2. Cash flows from investing activities
- -
2.1 Payments to acquire or for:
(a) entities
(b) tenements - -
(c) property, plant and equipment (1) (11)
(d) exploration & evaluation (235) (235)
(e) investments - -
(f) other non-current assets - -
2.2 Proceeds from the disposal of:
- -
(a) entities
(b) tenements - -
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 ofthe ASXListing Rules for defined terms.
Page 2
Appendix 5B
Mining explorationentity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows Current quarter
$A’000
Year to date (3
months)
$A’000
(c) property, plant and equipment - -
(d) investments - -
(e) other non-current assets - -
2.3 Cash flows from loans to other entities - -
2.4 Dividends received (see note 3) - -
2.5 Other (provide details if material) - -
2.6 Net cash from / (used in) investing
activities
(236) (236)
3. Cash flows from financing activities
- -
3.1 Proceeds from issues of equity securities
(excluding convertible debt securities)
3.2 Proceeds from issue of convertible debt
securities
- -
3.3 Proceeds from exercise of options - -
3.4 Transaction costs related to issues of equity
securities or convertible debt securities
- -
3.5 Proceeds from borrowings - -
3.6 Repayment of borrowings - -
3.7 Transaction costs related to loans and
borrowings
- -
3.8 Dividends paid - -
3.9 Other – lease payments (18) (18)
3.10 Net cash from / (used in) financing
activities
(18) (18)
4. Net increase / (decrease) in cash and
cash equivalents for the period
4.1 Cash and cash equivalents at beginning of
period
10,945 10,945
4.2 Net cash from / (used in) operating
activities (item 1.9 above)
(1,580) (1,580)
4.3 Net cash from / (used in) investing activities
(item 2.6 above)
(236) (236)
4.4 Net cash from / (used in) financing activities
(item 3.10 above)
(18) (18)
4.5 Effect of movement in exchange rates on
cash held
(4) (4)
4.6 Cash and cash equivalents at end of
period
9,107 9,107
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 ofthe ASXListing Rules for defined terms.
Page 3
Appendix 5B
Mining explorationentity or oil and gas exploration entity quarterly cash flow report
5. Reconciliation of cash and cash
equivalents
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
Current quarter
$A’000
Previous quarter
$A’000
5.1 Bank balances 278 628
5.2 Call deposits 8,829 10,317
5.3 Bank overdrafts - -
5.4 Other (provide details) - -
5.5 Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
9,107 10,945
6. Payments to related parties of the entity and their
associates
Current quarter
$A'000
6.1 Aggregate amount of payments to related parties and their
associates included in item 1 125
6.2 Aggregate amount of payments to related parties and their
associates included in item 2 76
6.1 Non exploration relat
Share your feedback
Discover