Far East Gold Ltd (‘FEG’ or ‘the Company’) is pleased to report results from a productive quarter of exploration
activity. Work focused on the Idenburg Gold Project located in the Papua & Papua Pegunungan Provinces,
Indonesia where the Company released an updated JORC 2012 inferred resource estimate for the project
and formally increased its ownership interest in the Idenburg Gold Project to 51%. The Company also
received assays from two drill holes completed at the Mount Clark West tenement in Queensland indicating
broad anomalous copper.
During the June 2026 Quarter, the Company received an unsolicited off-market takeover bid from Xingye
Gold (Hong Kong) Mining Company Limited to acquire all outstanding Company shares. FEG established an
Independent Board Committee (IBC) in relation to the unsolicited takeover bid and the IBC received
independent expert advice which indicates that the offer undervalues the Company and the Company’s
assets.
INDONESIAN PROJECT HIGHLIGHTS:
• Gained 51% ownership interest in the Idenburg Gold Project – Stage One acquisition completed
under the Conditional Share Purchase Agreement (CSPA), with A$6.5 million of consideration
shares issued to the Vendor’s nominee at A$0.13 per share. Refer to ASX announcements dated 9
October 202416 and 22 June 20262.
o Pathway triggered to increase FEG’s ownership interest to 80%, upon completion and
delivery to the Vendors of an Indonesian Feasibility Study by 31 December 2027.
• Governor’s Recommendation Received – In addition to the UKL-UPL environmental approval
secured for the Idenburg Gold Project, the Company received the Governor’s Recommendation for
the project – a key permitting milestone on the pathway to development. Refer to ASX
announcements dated 17 March 202612 and 19 June 202610.
• Indonesian Feasibility Study commenced – the key component of the pathway to increase FEG’s
ownership interest to 80%. Refer to ASX announcement dated 19 June 202610.
o Workstreams underway include, LiDAR survey, geotechnical and hydrological
investigations, environmental and permitting, civil and infrastructure engineering,
metallurgical and mine design optimisation.
• Idenburg Scoping Study well advanced – being completed by Mining One Consultants to assess
mine development options and underpin the Indonesian Feasibility Study workstreams. Refer to ASX
announcement dated 15 May 202611.
o Development focused drilling completed at the Sua prospect to support resource growth and
mine planning.
• Expanded JORC 2012 Inferred Resource – updated independent Mineral Resource Estimate (MRE)
of 7.8 million tonnes at 3.1 g/t gold for 780,000 ounces at Idenburg – an increase of 240,000 ounces
(~44%) on the initial MRE. Refer to ASX announcement dated 5 May 20263.
• Strike extension potential confirmed atthe Sua vein system, that lies within the 5km Sua–Afley shear
zone, by mapping at the Kwaplu and Sikrima prospects. Refer to ASX announcement dated 19 June
202610.
o Sikrima Prospect: surface grab samples of 16.07 g/t, 11.65 g/t and 7.39 g/t Au, consistent
with historical surface assays; considered to have low potential for supergene enrichment.
o Kwaplu Prospect: surface grab samples including 45.63 g/t Au (52 g/t Ag), 23.6 g/t Au (10.8
g/t Ag) and 21.45 g/t Au (2.5 g/t Ag); intense alteration suggests possible supergene
enrichment.
• High gold recoveries confirmed at Sua – preliminary metallurgical test work on Sua drill core
composites achieved total gold recoveries of approximately 95% using conventional gravity and
carbon-in-leach (CIL) processing. Refer to ASX announcement dated 21 April 202613.
o Three composites tested – with 94–96% of gold readily amenable to cyanidation and gravity
recoverable gold exceeding 50%.
ASX ANNOUNCEMENT -
JUNE2026QUARTERLY EXPLORATIONUPDATE
FAR EAST GOLDASX ANNOUNCEMENT 3
AUSTRALIAN PROJECT HIGHLIGHTS:
• Mount Clark West drilling – first assays received – drilling commenced in late 2025; assays for holes
MCDD06 and MCDD07 (Appendix 1) are consistent with intersecting the upper and peripheral zones
of a potentially copper mineralised porphyry system. Refer to ASX announcements dated 7 Nov
20255 and 10 February 20266. Observed features include:
o Widespread alteration including propylitic and phyllic alteration.
o Quartz veining and brecciation.
o Disseminated sulphides (pyrite, chalcopyrite).
o Results under evaluation to determine the focus of any future work.
TAKEOVER OFFER — XINGYE
On 27 May 2026, the Company received an unsolicited, off-market takeover offer from Xingye Gold (Hong
Kong) Mining Company Limited (“Xingye”), a wholly owned subsidiary of Inner Mongolia Xingye Silver & Tin
Mining Co., Ltd, to acquire all of the fully paid ordinary shares in FEG that Xingye does not already own, at
A$0.13 cash per share (the “Offer”).
On 25 June 2026, the Company lodged its Target’s Statement with ASIC and the ASX and dispatched it to
shareholders. The IBC unanimously recommended that shareholders REJECT the Offer, which the IBC
considers opportunistic and one that significantly undervalues the Company and its assets, including the
development upside at the Idenburg Gold Project.
The Independent Expert, Lonergan Edwards & Associates Limited, engaged by the Company in connection
with preparation of the Target’s Statement, assessed the value of 100% of the ordinary shares in FEG on a
100% controlling interest basis at A$0.324 to A$0.444 per share (mid-point A$0.385) and concluded the
Offer is neither fair nor reasonable.
FEG’s Managing Director & CEO Shane Menere said:
“I am pleased to report a transformational quarter for Far East Gold, marked by significant
operational and corporate milestones that have materially enhanced the Company's value
proposition. Most notably, the completion of Stage One of the Idenburg acquisition has
established Far East Gold as the 51% majority owner and operator of what we believe is one
of Indonesia's most exciting emerging high-grade gold projects.
With an Inferred Mineral Resource of approximately 780,000 ounces at 3.1 g/t gold, extensive
district-scale exploration upside and initial activities for the Indonesian Feasibility Study now
underway as the pathway to increasing our interest to 80%, Idenburg is rapidly evolving into a
cornerstone development asset for the Company.
The progress achieved during the quarter also reinforces the Independent Board Committee's
view that the current unsolicited takeover offer from Xingye Gold materially undervalues Far
East Gold and its portfolio of assets. The Independent Expert has concluded that the Offer
from Xingye is neither fair nor reasonable, and the IBC remains committed to carefully
managing this process with a clear focus on protecting shareholder interests and ensuring that
any change of control or strategic transaction appropriately reflects the underlying value of the
Company.
Our responsibility is to maximise value for all shareholders, and we will continue to pursue that
objective while advancing our projects and maintaining disciplined stewardship of the
business.”
ASX ANNOUNCEMENT -
JUNE2026QUARTERLY EXPLORATIONUPDATE
FAR EAST GOLDASX ANNOUNCEMENT 4
Figure 1: Map showing location of FEG projects in Indonesia and Australia
INDONESIAN PROJECT ACTIVITIES
IDENBURG GOLD PROJECT - PAPUA & PAPUA PEGUNUNGAN PROVINCES, INDONESIA
Idenburg is a 95,280 ha 6th generation Contract of Work (CoW) located in the same region hosting world
class multi-million-ounce gold and copper deposits including Grasberg (+70 Moz Au), Porgera (+20 Moz
Au), Frieda River (20 Moz Au) and Ok Tedi (20 Moz Au). It is an advanced project with over US$25M in
historical exploration. Only 30% of the CoW has been explored in detail.
To date there has been approximately 12,958m of diamond drilling completed at the Idenburg Gold Project,
which comprises 6,065m of historical drilling and 6,893m completed by FEG.
Of the 15 main prospect areas identified only 6 prospects have been drill tested, with 4 main prospects
currently being host to a JORC inferred Mineral Resource Estimate of 780,000 ounces at 3.1 g/t Au (see
Figure 2 and Table 4). The mineralised zones intersected at each of the prospects remain open along strike
and to depth.
SMG Consulting (SMGC) reported Exploration Targets for the 14 prospects identified (at the time) within the
Idenburg CoW area with an upper target of approximately 7.259 Moz at 6.1 g/t Au. A lower range exploration
target of 189 thousand ounces at 1 g/t Au was also determined. The potential quantity and grade of the
Exploration Targets are conceptual in nature there has been insufficient exploration to estimate a Mineral
Resource under the 2012 JORC Code and it is uncertain if further exploration will result in the estimation of
a Mineral Resource. Refer to ASX announcement dated 21 August 20244.
Detailed structural analyses completed by FEG have identified 29 conceptual target areas and the Company
continues to develop exploration and mapping plans across these 29 priority targets.
ASX ANNOUNCEMENT -
JUNE2026QUARTERLY EXPLORATIONUPDATE
FAR EAST GOLDASX ANNOUNCEMENT 5
Figure 2: Map showing prospect and resource areas within the Idenburg COW tenement. The areas of announced PIPPIB forest
reclassificationisalsoindicated.RefertoASXannouncementdatedNovember5,202515. Recentmappingwascompletedin theSikrima
and Kwapluprospectarea. Rock samples representgrab samples fromboulders collected inthefield. See Figures 3and 4. SeeTable
4 fordetails oftheJORC 2012inferred mineralresource estimate forIdenburg. Refer toASX announcement dated May 5, 20263.
MineralResource EstimateExpansion
During the June 2026 Quarter, FEG received an updated independent JORC Mineral Resource Estimate
(MRE) for the Company's Idenburg Gold Project of 7.8 million tonnes at an average grade of 3.1 g/t gold,
representing 780,000 ounces of gold (see Table 4 below). The updated inferred MRE represents an increase
of 240,000 ounces of gold, or approximately 44%, from the Company's initial JORC inferred Mineral
Resource Estimate of 4.1 million tonnes at an average grade of 4.1 g/t gold, representing 540,000 ounces
of gold. Both estimates have been independently determined by SMG Consulting in accordance with the
JORC Code (2012 Edition). Refer to ASX announcement dated 5 May 20263.
Results from detailed geological mapping confirmed the potential to extend the Sua vein system along strike
at the Kwaplu and Sikrima prospects. This work found additional gold-bearing rock boulders returning high-
grade gold assays (Refer to ASX announcement dated June 19, 202610). Significantly, FEG geologists
mapped the same distinctive geology and style of gold mineralisation previously observed during mapping
of the Company’s high-grade Sua prospect — the same geological setting that hosts the growing Sua gold
resource. The style and type of mineralisation logged at Kwaplu and Sikrima is consistent with that
intersected in drilling at the Sua prospect, reinforcing the prospectivity of the broader corridor. These results
add to FEG’s growing confidence that the high-grade gold-bearing shear / vein system recognised at Sua
has potential of extending along the approximate 3km structural corridor that may link the Sikrima and Sua
prospects (See: Figure 3).
ASX ANNOUNCEMENT -
JUNE2026QUARTERLY EXPLORATIONUPDATE
FAR EAST GOLDASX ANNOUNCEMENT 6
Sikrima Prospect: Three grab samples from surface boulders returned gold (Au) assays of: 16.07 g/t,
11.65 g/t and 7.39 g/t. The samples are consistent in rock type and reported gold assays with historical
assay results reported from surface rock assays in the Sikrima prospect area. Low potential of supergene
enrichment.
Kwaplu Prospect: Several grab samples from surface rock boulders returned assays including: 45.63 g/t
Au with 52 g/t Ag, 23.6 g/t Au with 10.8 g/t Ag, and 21.45 g/t Au with 2.5 g/t Ag. Intense alteration suggests
some degree of supergene enrichment may have occurred.
The samples were collected from within zones of interpreted shear and thrust faults inferred by high-grade
gold assays reported from historical exploration. These results validate the historical exploration results and
infer that gold-mineralised fault/shear structures occur over an extended distance, underscoring the strong
potential for additional gold discoveries through continued drill testing of defined targets.
Figure 3: Map showing the Sikrima to Kwaplu prospect areas and the location of recent surface rock samples with gold (Au) assay
results. See samplephotos inFigure 4. RefertoASX announcement dated June 19, 202610. Athoroughreviewand discussionof historical
explorationandassessmentofresource potentialcanbefoundintheCompanyASXannouncementof21 August20244.
The Company has maintained a program of detailed geological mapping and surface rock sampling over
select areas within the Idenburg CoW area. This work builds on the review and assessment of historical
exploration at Idenburg prepared by SMGC and discussed in their Independent Exploration Target Report for
the Idenburg CoW released by the Company in ASX announcement of August 21, 20244.
The Sua prospect has been the primary focus of recent exploration efforts and has resulted in a significant
expansion of the JORC 2012 inferred mineral resource estimate at Sua from 296,000 ounces of gold
estimated in 2024 to 514,000 ounces as reported in the ASX announcement 5 May, 20263 (See: Table 4).
The interpreted structural corridor from Sua trending west to Sikrima has been lightly explored and the new
surface rock assay results indicate that further exploration is warranted. Refer to ASX announcement dated
June 19, 202610.
ASX ANNOUNCEMENT -
JUNE2026QUARTERLY EXPLORATIONUPDATE
FAR EAST GOLDASX ANNOUNCEMENT 7
Figure4: PhotosofrocksamplescollectedandassayedfromtheSikrima prospectarea(above)andtheKwaplu
prospectarea (below). RefertoTable1forassay detailsandFigure3for samplelocations.
ASX ANNOUNCEMENT -
JUNE2026QUARTERLY EXPLORATIONUPDATE
FAR EAST GOLDASX ANNOUNCEMENT 8
Table1 : Samplelocationsandassay resultsfor samplesshownin Figures3and4.Coordinatesarereferencedto WGS84
UTM Zone 54 South.
Idenburg Permitting andProject Development
In addition to the UKL-UPL environmental approval secured for the Idenburg Gold Project (Refer to ASX
announcement dated 17 March 202612), the Company received the Governor’s Recommendation approval
for the Project during the June 2026 Quarter, in respect of its application lodged on 15 December 2025. The
Governor’s Recommendation is a mandatory prerequisite to formally apply for the Persetujuan Penggunaan
Kawasan Hutan (PPKH), or “Borrow-Use” approval, for the approved area contained in the UKL-UPL with the
Indonesian Ministry of Environment and Forestry. Securing this regional endorsement is the final step
required to lodge the PPKH application and represents an important permitting milestone that allows the
Company to continue its pathway to development of the Idenburg Gold Project. Refer to ASX announcement
dated 19 June 202610.
In parallel with its exploration activities, the Company has commenced work associated with the Indonesian
Feasibility Study for the Idenburg Gold Project, which forms the key component of the pathway to increasing
FEG’s ownership interest in PT Iriana Mutiara Idenburg from 51% to 80%. Multiple workstreams are already
underway, including the LiDAR survey to support geological modelling and mine planning, geotechnical and
hydrological investigations, environmental and permitting activities, civil and infrastructure engineering
studies, together with ongoing metallurgical optimisation and mine design work. The LiDAR survey is also
expected to assist in refining structural interpretations across the broader Contract of Work, supporting future
exploration targeting and the potential foran expanded resource. Refer to ASX announcement dated 19 June
202610.
During the quarter, the Company received preliminary metallurgical test results from composite samples of
drill core prepared from FEG drill holes completed at the Sua prospect. The test work was completed at PT
Geoservices’ metallurgical testing facilities in Bekasi, West Java, under the supervision of Mining One
Consultants. Three composite samples were tested – a low-grade sample (1.1 g/t Au), an average-grade
sample (3.7 g/t Au, representing the approximate average grade of the Sua inferred resource) and a high-
grade sample (39.8 g/t Au) – with total gold recovery of approximately 95% achieved using conventional
gravity and carbon-in-leach (CIL) processing.
ASX ANNOUNCEMENT -
JUNE2026QUARTERLY EXPLORATIONUPDATE
FAR EAST GOLDASX ANNOUNCEMENT 9
Diagnostic leach testing indicated that 94–96% of the gold is readily amenable to cyanidation, and bench-
scale gravity recoverable gold exceeded 50% for the high-grade and low-grade samples, supporting
consideration of a gravity circuit in the process flowsheet. The results confirm gold recoveries reported from
preliminary test work completed in 2007 and indicate low grades of silver, copper, arsenic and other
deleterious elements. The results are preliminary in nature and are based on limited composite samples;
further metallurgical test work will be conducted as the resource is further defined to confirm processing
routes, recoveries and reagent consumption assumptions. Refer to ASX announcement dated 21 April
202613.
The Company confirms that it is not aware of any new information or data that materially affects the results
included in that announcement and that all material assumptions and technical parameters underpinning the
results continue to apply and have not materially changed.
The Idenburg Scoping Study, being completed by Mining One Consultants, is well advanced and is
assessing potential mine development options for the Project. The forthcoming Scoping Study will provide
the foundation for a number of ongoing and further Indonesian Feasibility Study workstreams. The Company
believes these programs will assist in increasing geological confidence within portions of the current Mineral
Resource Estimate, support future conversion of Inferred Resources into higher confidence categories, and
provide key technical inputs required for completion of the Indonesian Feasibility Study. Refer to ASX
announcements dated 15 May 202611 and 19 June 202610.
During the June 2026 Quarter, the Company completed the Stage One acquisition under the Conditional
Share Purchase Agreement (CSPA), increasing its interest in the Idenburg Gold Project to 51%. In
accordance with the CSPA, the Company issued A$6.5 million of consideration shares to the Vendors’
nominee at an issue price of A$0.13 per share. Refer to ASX announcement dated 22 June 20262.
FEG’s objective remains to continue advancing these workstreams to satisfy the requirements associated
with increasing its ownership interest in the Idenburg Gold Project to 80% being the completion and delivery
of the Indonesian Feasibility Study to the Vendors by 31 December 2027.
WOYLA PROJECT – ACEH PROVINCE, INDONESIA
The Company’s Woyla Copper Gold Project is a 24,260-ha 6th generation Contract of Work (COW) located
in the Aceh region of North Sumatra, Indonesia (See: Figure 1). FEG holds a 51% interest in the project.
Refer to ASX announcement dated 7 April 202614.
The Company has prepared a long-term project plan for Woyla as requested by ESDM which will enable the
Company to extend the exploration permit forthe COW. There were no exploration activities completed during
the June 2026 Quarter.
TRENGGALEK COPPER-GOLD PROJECT – EAST JAVA PROVINCE, INDONESIA
The Company continues to engage with local communities about the timing of the planned Phase 1 drill
program. There were no exploration activities completed during the June 2026 Quarter.
WONOGIRI COPPER-GOLD PROJECT – CENTRAL JAVA PROVINCE, INDONESIA
During the quarter, the Company continued its regular engagement with the Mining Department (ESDM) to
address administrative and regulatory matters relating to the IUP Exploration permit, with the objective of
progressing the permit’s status in accordance with the prevailing regulatory framework. There were no
exploration activities completed during the June 2026 Quarter.
ASX ANNOUNCEMENT -
JUNE2026QUARTERLY EXPLORATIONUPDATE
FAR EAST GOLDASX ANNOUNCEMENT 10
Figure 5: Map showing location of FEG projects in Queensland,Australia
AUSTRALIAN PROJECT ACTIVITIES
BLUE HILL CREEK PROJECT – QUEENSLAND
The Company is preparing field mapping activities. There were no exploration activities completed during
the June 2026 Quarter.
MOUNT CLARK WEST PROJECT – QUEENSLAND
FEG undertook 3 drill holes for a total of 1,229.3m (See: Figure 6). The holes were located to test defined
geophysical targets suggesting potential for a buried porphyry body. One hole was abandoned due to poor
ground conditions. The two completed holes were drilled using reverse-circulation (RC) and diamond drilling
methods (Table 2). Drilling supervision and rock chip and drill core sampling was conducted by Hughes
Consulting.
Hole MCDD05 was drilled using RC to a depth of 142m and was terminated with no core samples collected
due to poor ground conditions downhole. Hole MCDD05 intersected weakly altered andesite volcanics to
end of the hole.
Hole MCDD06 was drilled by RC to a depth of 151m and then to 516.2m using HQ diamond drilling.
Composite samples were collected at 3m intervals through the RC section with 1m half core samples
collected through the diamond drilled section. The hole encountered altered hydrothermally andesitic
volcanics and tuff including propylitic and phyllic altered volcanics with intermittent narrow quartz veins with
pyrite and rare, minor chalcopyrite. Variable magnetite enrichment was noted associated with propylitic and
weakly developed potassic alteration.
Hole MCDD07 was RC drilled to a depth of 233m and to a total depth of 571.1m using HQ diamond drilling.
Half core samples were collected at 1m intervals through the diamond drilled section. No samples were
collected from the RC drilled portion of the drill hole. The hole intersected a well-developed hydrothermal
system characterized by propylitic altered volcanic rocks near surface in contact with intensely propylitic and
silicified and phyllic altered felsic intrusive containing pyrite and very minor chalcopyrite. See Figure 7 and
refer to ASX announcement dated 10 February 20266.
ASX ANNOUNCEMENT -
JUNE2026QUARTERLY EXPLORATIONUPDATE
FAR EAST GOLDASX ANNOUNCEMENT 11
Cautionary Statement: Visual estimates of mineral abundance should never be considered a proxy or
substitute for laboratory analyses where mineral concentrations or grades are the factor of principal economic
interest. Visual estimates also provide no information of deleterious physical or chemical properties that may
negatively affect the project’s economic viability and valuation.
Received assay results, rock types and alteration types and styles from each hole do support the conceptual
exploration model the Company has used. The results are consistent with being situated proximal to one or
more porphyry bodies. The Company will evaluate the results to determine where to focus any further work
at the Mount Clark West project.
Figure 6 Above: Interpreted RTP magnetic image base with SGC interpreted MIMDAS zones of high chargeability (green) The image shows the
occurrence of 3 and possibly 4 low magnetic zones which represent high priority drill targets as potential mineralised porphyry bodies.
Surveycoordinatesconform totheGDA94, MGA55surveydatum.
Table 2: Below. Completed MCDD Drill Hole Locations
HOLE_ID HOLE_TYPE LOCATION EASTING NORTHING DIP AZM DEPTH
MCDD07 RC/DD MCW 663301.272 7616887.519 -60 268 571.1m
MCDD06 RC/DD MCW 662362.881 7617743.665 -60 180 516.2m
ASX ANNOUNCEMENT -
JUNE2026QUARTERLY EXPLORATIONUPDATE
FAR EAST GOLDASX ANNOUNCEMENT 12
Figure7:InterpretedcrosssectionofholeMCDD07.RefertoLegendfordetails.Theholewasterminatedat571.1minmoderatelymagnetic, silicified
basalt. Basedonmodelingtheholedidtesttheinterpretedzoneofhighermagnetics.
Initial assay results from drill holes MCDD06 and MCDD07 did not define an economic copper intersection;
however, the geological logging, alteration, sulphide assemblages and broad anomalous copper values are
considered consistent with the upper and peripheral portions of a potentially mineralised porphyry system.
The results will be integrated with geophysical and geological data to refine the exploration model and
determine the next phase of exploration.
Assay results for individual RC and half-core samples collected from holes MCDD06 and MCDD07 are
provided in Appendix 1. All samples were prepared and analysed at the ALS Laboratory in Townsville
Queensland. Appropriate QA/QC protocols including certified reference standards, duplicate and blanks
samples were implemented.
ASX ANNOUNCEMENT -
JUNE2026QUARTERLY EXPLORATIONUPDATE
FAR EAST GOLDASX ANNOUNCEMENT 13
TENEMENT SUMMARY
Table 3: Below:List ofFEGProjects and status at theend ofJune 2026Quarter.
Other than the increase in the Company’s beneficial interest in the Idenburg Gold Project to 51%
following completion of Stage One acquisition under the Conditional Share Purchase Agreement (Refer to
ASX announcement dated 22 June 20262), the Company did not acquire or dispose of any mining
tenements nor otherwise change its beneficial interest in the Company’s Indonesian and Australian
projects during the Quarter under review.
PROJECT LOCATION
MININGLICENCE
TYPE
TENEMENT
AREA
MINERALOGY TYPE
CURRENTPERCENTAGE BENEFICIAL
OWNERSHIP
Woyla
CopperGold
Project
Aceh,
Indonesia
6thGeneration
Contractof Work
24,260ha Porphyry and Epithermal 51%
Trenggalek
CopperGold
Project
EastJava,
Indonesia
IUP–Operation
and Production
12,813ha Porphyry and Epithermal 100%
Wonogiri
CopperGold
Project
CentralJava,
Indonesia
IUP – Exploration 3,928 ha Porphyry and Epithermal 100%
Idenburg
Gold
Project
Papua&
Papua
Pegunungan,
Indonesia
6thGeneration
ContractofWork
95,280 ha Orogenic Gold 51%
Abilitytoincrease to80% upon completion
and delivery of anIndonesian Feasibility
Study to the Vendors by 31 December 2027
Mount Clark
West Copper
GoldProject
Connors Arc
Queensland,
Australia
EPM 26008 1,912 ha Porphyry 90%
BlueHill
CreekGold
Project
Drummond
Basin
Queensland,
Australia
EPM26217,
EPM 27794&
EPM 28601
8,000 ha Epithermal 90%
ASX ANNOUNCEMENT -
JUNE2026QUARTERLY EXPLORATIONUPDATE
FAR EAST GOLDASX ANNOUNCEMENT 14
SUMMARY OF EXPENDITURE
During the June 2026 Quarter, the Company capitalised total exploration and evaluation expenditure of
$284,000, reflecting costs directly attributable to exploration activities undertaken in Australia and
Indonesia.
Capitalised exploration expenditure1 comprised:
• $86,000 relating to exploration support activities and employee costs in Indonesia, and
• $198,000 incurred on exploration activities associated with the Mount Clark West Project, Australia
including drilling-related costs.
In addition, the Company incurred $847,000 in drilling and associated support costs at the Idenburg Gold
Project, which were expensed through operating cash flows. Expenditure was principally related to drilling
services and drilling-related activities, personnel, fuel and logistical support, permitting and government-
related requirements, and technical services. These costs supported the exploration in the Indonesian
Project Activities section and are detailed in Appendix 5B – Cashflow Report.
Further details of cash movements, including capitalised and expensed exploration costs, are provided in
Appendix 5B. No expenditure was incurred on mining, production, or development activities during the
reporting period.
PAYMENTS TO RELATED PARTIES AND THEIR ASSOCIATES
Payments to related parties and their associates during the quarter totaled $175,000, as disclosed in Item
6 of Appendix 5B. All related party payments were made on normal commercial terms and in
accordance with remuneration arrangements.
1 The capitalisation of exploration costs is consistent with the Company’s accounting policy, whereby expenditure is
capitalised when it is considered likely that the costs will be recouped through successful exploration and future
development, or where exploration activities are ongoing.
ASX ANNOUNCEMENT -
JUNE2026QUARTERLY EXPLORATIONUPDATE
FAR EAST GOLDASX ANNOUNCEMENT 15
ASX Announcements referenced directly or in commentary of the June 2026 Quarterly release:
2 ASX: FEG 22 June 2026 “FEG Moves to 51% Ownership of Idenburg, Clear Pathway to 80%”
3 ASX: FEG 5 May 2026 “Idenburg JORC MRE Increases From 540,000 Ounces To 780,000 Ounces of Gold”
4 ASX: FEG 21 August 2024 “Idenburg PT Iriana Mutiara Idenburg Exploration Target Report, June 2024”
5 ASX: FEG 7 November 2025 “Drilling Commenced at Mount Clark West Copper-Gold Project”
6 ASX: FEG 10 February 2026 “Mount Clark West: Positive DrillingObservations, Tenement ExtensionGranted”
7 ASX: FEG 30 April 2026 “REPORT ON ACTIVITIES FOR THE QUARTER ENDED 31 MARCH 2026”
8 ASX: FEG 12 January 2026 “Idenburg Project Fifth Consecutive High-Grade GoldIntercept”
9 ASX: FEG 10 March 2026 “High-Grade Gold Intersections Extend Mineralisation at Sua – Resource Update
Pending”
10 ASX: FEG 19 June 2026 “High-GradeGold Mineralisation Found Along Trend of the Sua Prospect & Project
Update”
11 ASX: FEG 15 May 2026 “Idenburg Scoping Study Advances, Drillingto Commence”
12 ASX: FEG 17 March 2026 “Idenburg Project - UKL-UPL Environmental Approval”
13 ASX: FEG 21 April 2026 “Idenburg Update: Metallurgical Testwork Demonstrates High Gold Recoveries at Sua”
14 ASX: FEG 7 April 2026 “Woyla Project Update”
15 ASX: FEG 5 November 2025 “PIPPIB Approval – Major Regulatory Milestone Secured at Idenburg Gold Project”
16 ASX: FEG 9 October 2024 “CSPA Signed to Acquire
Share your feedback
Discover