Supplementary Bidder's Statement
Released
Released
Announcement PDF
FIRST SUPPLEMENTARY
BIDDER’S STATEMENT
in respect of the offer for shares in
Far East Gold Limited
by
Xingye Gold (Hong Kong) Mining Company Ltd
a wholly owned subsidiary of
Inner Mongolia Xingye Silver & Tin Mining Co., Ltd
Important notices
This document is the first supplementary bidder’s statement (First Supplementary Bidder’s
Statement) given by Xingye Gold (Hong Kong) Mining Company Limited (Bidder) in connection
with its off-market takeover bid for Far East Gold Limited (ACN 639 887 219) (FEG).
A copy of this First Supplementary Bidder’s Statement was lodged with the Australian Securities
and Investments Commission (ASIC) and the Australian Securities Exchange (ASX) on 30 June
2026. Neither ASIC, ASX nor any of their officers takes any responsibility for the contents of this
First Supplementary Bidder’s Statement, including the notices contained within.
This First Supplementary Bidder’s Statement supplements, and must be read together with, the
Bidder’s Statement dated 27 May 2026 (Original Bidder’s Statement).
Unless the context otherwise requires, capitalised terms used in this First Supplementary Bidder’s
Statement have the same meaning as given to them in the Original Bidder’s Statement.
This First Supplementary Bidder’s Statement will prevail to the extent of any inconsistency with
the Original Bidder’s Statement.
The Bidder strongly urges you to carefully consider all information contained in the
Original Bidder’s Statement and this document, and to then ACCEPT the Offer.
First Supplementary Bidder's Statement
2
1 The Bidder’s concerns with the Target’s Statement and FEG
The Bidder refers to FEG’s target’s statement dated 25 June 2026 (Target’s Statement) which
includes an Independent Expert’s Report (IER) prepared by Lonergan Edwards & Associates
Limited (LEA).
The Bidder has material concerns with several disclosures made in the Target’s Statement
and with the conduct of FEG, including:
1 LEA has attributed almost half the value of FEG to the Wonogiri
Copper Gold Project even though the licence for that project was
revoked more than four years ago and has not been reinstated
despite multiple attempts at reinstatement by FEG.
Refer to
Sections 1.1
and 2 below
2 Even if the licence for the Wonogiri Copper Gold Project were to be
reinstated, the project is not economically viable.
Refer to
Section 2.3
below
3 LEA has not applied any discount to its valuation of the Woyla Copper
Gold Project, even though there is material uncertainty about whether
the Indonesian Government recognises PT Woyla Aceh Minerals’
rights under the Woyla CoW.
Refer to
Section 3.1
below
4 Despite FEG claiming that it has attracted substantial interest from
potential investors, the likelihood of a competing control proposal
emerging for FEG is very low.
Refer to
Section 1.2
below
5 After the revocation of the Wonogiri Mining Licence and the expiry of
the Woyla CSPA, the Chair of FEG, Justin Werner procured the
disposal of FEG Shares.
Refer to
Section 4.3
below
6 FEG has failed to disclose to FEG Shareholders that the Wonogiri
Mining Licence was revoked only 8 days after FEG:
(a) listed on ASX; and
(b) issued approximately A$7.7 million worth of FEG Shares to
the vendors of the Wonogiri Copper Gold Project to pay for its
100% acquisition of that project.
The Chair of FEG, Justin Werner, was a shareholder and director
of one of the vendors of the Wonogiri Copper Gold Project.
Refer to
Section
4.1(a)(i)
below
7 Despite indicating that the results of the revised scoping study for the
Wonogiri Copper Gold Project would be released in late July 2022,
FEG has never released the results of the revised scoping study
for the project on ASX.
Refer to
Section
4.1(a)(ii)
below
8 Despite FEG’s rapidly declining cash balance and FEG disclosing in
its report for the half-financial year ended 31 December 2025 (which
was reviewed by its auditors, KPMG) that it intends to raise A$10
million net of costs through share placements, there have been no
further announcements by FEG about any capital raising.
Refer to
Section
4.1(c) below
First Supplementary Bidder's Statement
3
LEA’s conclusion that the Offer is not fair is based on material errors
LEA has assessed the value of FEG Shares to be in the range of A$0.324 to A$0.444 per FEG
Share on a 100% controlling interest basis and has concluded that the Offer is neither fair nor
reasonable to FEG Shareholders not associated with Xingye (FEG Non-Associated
Shareholders).
For the following reasons, LEA’s conclusion that the Offer is not fair is erroneous and
misleading to FEG Shareholders:
(a) Almost half the value of FEG is attributed to the Wonogiri Copper Gold Project
even though:
(i) the licence for that project was revoked more than four years ago and
has not been reinstated despite multiple attempts by FEG at
reinstatement; and
(ii) the project is not economically viable.1
(b) LEA has not applied any discount to the valuations of:
(i) the Woyla Copper Gold Project to reflect the uncertainty about whether
the Indonesian Government recognises PT Woyla Aceh Minerals’
(PTWAM) rights under the Woyla CoW;
(ii) the Trenggalek Copper Gold Project to reflect the uncertainty about
whether PTSMN will be able to extend the Trenggalek IUP beyond June
2029; or
(iii) the Blue Hill Creek Gold Project to reflect the uncertainty about whether
FEG legally holds a 90% interest in the mining licence for that project
EPM 28601.
Contained in:
(c) Section 2 of this First Supplementary Bidder's Statement are the detailed reasons
why LEA’s valuation of the Wonogiri Copper Gold Project is erroneous and why the
Bidder considers that no value should be attributed to the Wonogiri Copper Gold
Project; and
(d) Section 3 of this First Supplementary Bidder’s Statement are detailed reasons why
LEA should have applied discounts to its valuations of the Woyla Copper Gold
Project, the Trenggalek Copper Gold Project and the Blue Hill Creek Gold Project.
If LEA attributed no value to the Wonogiri Copper Gold Project and applied
appropriate discounts to its valuations of the Woyla Copper Gold Project, the
Trenggalek Copper Gold Project and the Blue Hill Creek Gold Project (for the
reasons discussed in Sections 2 and 3 below), then the valuation range for FEG
Shares determined by LEA would be significantly lower.
LEA’s errors and failure to adequately consider various factors relevant to the Offer
have led to the erroneous conclusion that the Offer is not reasonable
LEA’s conclusion that the Offer is not reasonable is primarily based on its observations that:
1
Representing approximately 49.4%, 47.2% and 45.6% of the total value of FEG Shares at the low, mid and high
points of LEA’s valuation range respectively.
First Supplementary Bidder's Statement
4
• the Offer Price is lower than the assessed valuation range; and
• the Offer Price premium is low relative to the market price for FEG Shares before the
announcement of the Offer.
However:
(a) if no value was attributed to the Wonogiri Copper Gold Project and appropriate
discounts were applied to the valuations of the Woyla Copper Gold Project, the
Trenggalek Copper Gold Project and the Blue Hill Creek Gold Project, then the
difference between the Offer Price and the assessed valuation range of FEG
Shares would reduce very significantly; and
(b) the chronic and ongoing failure by FEG’s management and certain FEG directors
to properly inform the market of the revocation of the Wonogiri Mining Licence and
the issues with its other Projects (as discussed in Section 4.1 below) have meant
that there was a misinformed and false market for FEG Shares before the
announcement of the Offer.
Additionally, LEA has also relied on FEG’s assertion that:
“Since the announcement of the Offer, Far East Gold has attracted substantial
interest from a range of international mining companies, strategic investors and
financial groups. Multiple parties have entered into confidentiality agreements with
the Company and are actively progressing technical, commercial and site-based
due diligence initiatives.”
However, for the following reasons, this statement is misleading and should not have been
relied upon by LEA:
(c) FEG has not disclosed whether the parties that have entered into confidentiality
agreements with FEG are interested in acquiring FEG Shares or FEG’s Projects;
and
(d) at the date of this First Supplementary Bidder’s Statement, the Bidder’s voting
power in FEG is 17.61%. Consequently, the likelihood of a competing proposal
emerging for FEG is very low because without the support of the Bidder a counter-
bidder:
(i) will not be able to compulsorily acquire remaining FEG Shares following a
takeover bid; and
(ii) is highly unlikely to be able to acquire FEG by scheme of arrangement.
Further to this, LEA has failed to adequately consider the following factors in its assessment
of the reasonableness of the Offer:
(e) (FEG’s near-term capital requirements) FEG’s cash and cash equivalents
balances have continued to decline. Despite raising approximately $32.12 million
since its ASX listing, FEG's cash and cash equivalents had declined to $3,556,000
by 31 March 2026 and are expected to be fully depleted by 23 July 2026. Despite
FEG's rapidly declining cash balance and FEG disclosing in its report for the half-
financial year ended 31 December 2025 (which was reviewed by its auditors,
KPMG) that it intends to raise A$10 million net of costs through share placements,
there have been no announcements about any capital raising.
(f) (FEG’s stalled and stagnant Projects) Despite listing on the ASX in March 2022,
FEG has not been able to advance any of its Projects past exploration and into the
development phase.
First Supplementary Bidder's Statement
5
Considering the above, LEA’s conclusion that the Offer is not reasonable is erroneous and
misleading to FEG Shareholders.
The Bidder has concerns about FEG’s management and certain FEG Directors
As set out in section 4 of this First Supplementary Bidder’s Statement, the Bidder has concerns
about FEG’s management and certain FEG Directors. In particular:
(a) FEG’s management and certain FEG Directors have presided over various
management and compliance failures, including a failure to disclose to FEG
Shareholders that the Wonogiri Mining Licence was revoked only 8 days after
FEG listed on ASX and issued approximately A$7.7 million worth of FEG Shares
to the vendors of the Wonogiri Copper Gold Project to pay for its 100% acquisition
of that project;
(b) the market price for FEG Shares was rapidly declining prior to the announcement
of the Offer; and
(c) after the revocation of the Wonogiri Mining Licence and the expiry of the Woyla
CSPA, the Chair of FEG, Justin Werner procured the disposal of FEG Shares.
2 LEA’s valuation of the Wonogiri Copper Gold Project is erroneous
LEA has attributed almost half the value of FEG to the Wonogiri Copper Gold
Project even though:
(a) the licence for that project was revoked more than four years ago and has
not been reinstated despite multiple attempts at reinstatement by FEG; and
(b) the project is not economically viable.
The Wonogiri Mining Licence was revoked and has not been reinstated for more than
four years despite multiple attempts by FEG
FEG asserts in its Target’s Statement that:
“Based on both legal advice (from multiple law firms) and a letter from Indonesia’s
Director General of Mineral and Coal, the revocation was made in error, and the
licence is currently subject to an ongoing administrative reinstatement process”
However, FEG has concealed the fact that the letter from Indonesia’s Director General of
Mineral and Coal (DGMC) was issued on 12 June 2023, which is before FEG’s various failed
attempts to reinstate the Wonogiri Mining Licence, including two unsuccessful petitions to the
Jakarta Administrative Court on 11 November 2024 and 24 November 2025.
In addition, the statement referred to above is materially incomplete because the Target’s
Statement does not:
(a) identify the law firms providing the legal advice referred to above or disclose a copy
of the legal advice provided;
(b) disclose any details of the alleged letter from the DGMC;
(c) explain the administrative action taken by the Indonesian Government and the
reasons why it was undertaken; or
First Supplementary Bidder's Statement
6
(d) explain the alleged procedural or legal defect in the administrative action taken by
the Indonesian Government.
Further to this:
(e) if the Wonogiri Mining Licence was not revoked on 5 April 2022 and a further
suspension or extension of the Wonogiri Mining Licence was not granted, the
licence would have expired on 9 January 2023. It is therefore unclear precisely
what FEG has been attempting to reinstate;
(f) the company that held the Wonogiri Mining Licence before it was revoked, PTAPM,
is not currently recorded in Indonesian mining licence registers as holding the
Wonogiri Mining Licence; and
(g) PTAPM does not hold a valid environmental approval or forestry licence for the
Wonogiri Copper Gold Project.
It follows that there is a very high degree of uncertainty as to whether the Wonogiri Mining
Licence will ever be reinstated, and it appears that PTAPM’s rights to the Wonogiri Mining
Licence have been permanently lost.
Reasons why LEA’s 25% discount to the value of the Wonogiri Copper Gold Project is
erroneous
Despite the very high degree of uncertainty regarding the Wonogiri Mining Licence, LEA
has applied only a 25% discount to the Wonogiri Copper Gold Project in its IER to reflect the
uncertainty and valued the Wonogiri Mining Licence at approximately A$70.7 million to A$88.4
million.
LEA has not explained why this modest 25% discount adequately reflects the uncertainty about
the licence. This is a remarkable and unjustifiable approach by LEA, given that LEA attributes
nearly half of the value of FEG to the Wonogiri Copper Gold Project.
If the value of the Wonogiri Copper Gold Project is entirely discounted, then:
(a) the aggregate value of the Projects as determined by LEA will be in the range of
A$50.3m to A$78.7m with a midpoint at A$64.5m; and
(b) LEA’s valuation of 100% FEG Shares would then be in the range A$0.164 to
A$0.241 with a midpoint at A$0.203.2
In addition, if appropriate discounts are applied to the valuations of the Woyla Copper Gold
Project, the Trenggalek Copper Gold Project and the Blue Hill Creek Gold Project, then the
valuation range for FEG Shares will be significantly lower again.
Even if the Wonogiri Mining Licence were to be reinstated, the Wonogiri Copper Gold
Project is not economically viable
Even if the Wonogiri Mining Licence were to be reinstated, for the following reasons, the Bidder
considers that the Wonogiri Copper Gold Project is not economically viable:
(a) (small-scale deposit) The IER discloses that the Wonogiri Copper Gold Project
contains only approximately 81.6 million metric tonnes of mineralised materials
2
Assuming one million FEG Options with an exercise price of A$0.40 per share are not exercised and tax losses
have nil value.
First Supplementary Bidder's Statement
7
bearing copper and gold.3 By global standards, this is a very small deposit with
limited economic value.
(b) (high cost of mining) Based on the Bidder’s own technical analysis, the shape of
the mineral deposit at the Wonogiri Copper Gold Project means that for every
tonne of valuable minerals extracted, nearly three tonnes of waste rock must first
be removed, making the cost of any open-pit mining very high.
(c) (low grade of recoverable metals) The grades of gold and copper at the Wonogiri
Copper Gold Project are low (approximately 0.38 g/t for gold and 0.11% for
copper).4 Given the costs of developing comparable deposits in Indonesia, the
Bidder considers that even at current historically elevated gold and copper prices
the Wonogiri Copper Gold Project would at best break even.
(d) (severe social and land access issues) The area in which the Wonogiri Copper
Gold Project is situated is overlaid by local villages, farmlands, dwellings and
families that have lived on or around the mineral deposit for generations, making
any open-pit mining approach almost impossible to implement. Relocation of these
communities would be a protracted, difficult and extremely costly process, requiring
engagement with local government, village stakeholders and affected families. In
addition, illegal miners have been operating at the Wonogiri Copper Gold Project
for several years and they would also be very difficult to displace.
These factors may also explain why FEG has never publicly disclosed the results of its
revised scoping study for the Wonogiri Copper Gold Project undertaken in 2022 (as discussed
further in Section 4 below).
FEG is contradicting itself by claiming the Wonogiri Copper Gold Project as its most
valuable asset
FEG has stated in its Target's Statement that:
• “the Idenburg Gold Project is FEG’s "flagship asset”"; and
• “FEG’s decision to not commit further capital to the Wonogiri Copper Gold Project
at this time reflects its current prioritisation of capital and technical resources
toward the Idenburg Gold Project and other near-term activities”.
However, the reality is that FEG has never given any meaningful priority to the Wonogiri
Copper Gold Project because:
(a) the licence for the project was revoked more than four years ago; and
(b) the project is not economically viable.
Despite these matters, FEG is now, in the context of the takeover bid by the Bidder,
contradicting itself by seeking to characterise the Wonogiri Copper Gold Project as its most
valuable asset.
3 Refer to table 3.5 on page 64 of the Independent Specialist Report prepared by SKR Consulting (Australia) Pty
Ltd (ISR) contained within the IER.
4
Refer to page 63 of the ISR.
First Supplementary Bidder's Statement
8
3 LEA should have applied a discount to its valuations of certain other
Projects
Material uncertainty about whether the Indonesian Government recognises PTWAM’s
rights under the Woyla CoW
The Target’s Statement asserts that:
• “the expiry of the exploration period [under the Woyla CoW] does not affect the
validity of the Woyla CoW”; and
• “before the expiry of the exploration period [under the Woyla CoW], PTWAM lodged
a valid application to extend the exploration period under the Woyla CoW which
remains under consideration”.
However, FEG has omitted material information in its Target’s Statement about the expiry of
the exploration period under the Woyla CoW, including:
(a) the exploration period under the Woyla CoW expired on 14 October 2024 and has
not been extended by any formal decree from the DGMC. (LEA has erroneously
stated in the IER that the exploration period under the Woyla CoW is valid until
September 2026);5
(b) PTWAM has made at least two applications to the DGMC to extend the exploration
period, neither of which have been approved;
(c) following a direction from the DGMC to place an exploration commitment
guarantee by way of bank guarantee, PTWAM placed two bank guarantees,
However, both bank guarantees expired on 12 March 2026;
(d) the Woyla CoW is not currently recorded in Indonesia’s mining licence database;
and
(e) the forestry licence that PTWAM previously held in respect of the Woyla CoW
expired on 14 October 2024. Without a valid forestry licence, PTWAM cannot
lawfully conduct mining activities within the designated forest area in which the
Woyla Copper Gold Project is located.
Considering the above information, there is material uncertainty about whether the
Indonesian Government recognises PTWAM’s rights under the Woyla CoW, and LEA should
have applied an appropriate discount to the value of the Woyla Copper Gold Project.
Uncertainty about whether the Trenggalek IUP may be extended
The Target’s Statement omits material information about the status of the Trenggalek Copper
Gold Project, including that:
(a) despite holding a production licence over Trenggalek since June 2019
(Trenggalek IUP), PT Sumber Mineral Nusantara (PTSMN) has not commenced
any actual production in Trenggalek Copper Gold Project; and
(b) the Trenggalek Copper Gold Project is located within a designated forestry area,
and the previous Forestry Area Lease Licence held by PTSMN expired on 2
November 2018.
5
Refer to page 30 of the ISR.
First Supplementary Bidder's Statement
9
The information above is material because the Trenggalek IUP expires on 24 June 2029 and
one of the key assessment criteria for the DGMC in determining whether to grant an extension
of the production licence will be the extent of PTSMN’s progress during the term of the
production licence.
It follows that there is uncertainty about whether PTSMN will be able to extend the Trenggalek
IUP beyond June 2029, and LEA should have applied an appropriate discount to the value of
the Trenggalek Copper Gold Project to reflect this.
Uncertainty about the ownership interest in EPM 28601
The Target’s Statement omits material information about FEG’s title to the Exploration Permit
for Minerals with permit number 28601 (EPM 28601) that is held in connection with the Blue
Hill Creek Gold Project.
Searches of the Queensland Resource Authority Public Reports indicate that Ellenkay Gold
Pty Ltd (Ellenkay) holds a 100% interest in EPM 28601 and that FEG does not hold any
interest in that EPM.
Additionally:
(a) under section 17 of the Mineral and Energy Resources (Common Provisions) Act
2014 (Qld), any transfer of the 90% interest in EPM 28601 from Ellenkay to FEG
will not be effective until it has been approved by the relevant Minister and has
been registered with the Queensland Department of Resources;
(b) FEG appears to have either failed to lodge the instruments of transfer with the
Department of Resources or commenced but not completed the transfer process;
and
(c) it could take three to six months to process a transfer of EPM 28601 from Ellenkay
to FEG, and there is no certainty that the transfer will be approved by the relevant
Minister.
It follows that there is uncertainty as to whether FEG legally holds a 90% interest in EPM
28601, and consequently LEA should have applied an appropriate discount to the value of
the Blue Hill Creek Gold Project.
4 The Bidder has concerns about FEG’s management and certain FEG
Directors
FEG’s management and certain FEG Directors have presided over various
management and compliance failures
The track record of FEG’s management and certain FEG Directors raises significant concerns
regarding their ability and willingness to prudently manage and progress FEG’s Projects and
to otherwise effectively govern FEG in compliance with law.
A selection of these failures is as follows:
(a) (Failures in continuous disclosure) FEG has failed to make adequate
disclosures to ASX about its Projects. In particular:
(i) (Wonogiri Mining Licence) FEG issued approximately A$7.7 million
worth of FEG Shares to the vendors of the Wonogiri Copper Gold Project
upon its listing on ASX on 28 March 2022 (as payment for the acquisition
First Supplementary Bidder's Statement
10
of the project). 6 One of those vendors, Alpha HPA Limited (Alpha), held
a 45% interest in the Wonogiri Copper Gold Project. The current Chair of
FEG, Mr Werner was at the time both a director and shareholder of
Alpha.7 However, the Wonogiri Mining Licence was revoked just 8
days after FEG was listed on ASX and has not been reinstated.
Despite this, FEG has stated in all of its quarterly activities reports since
2025 that it is engaging with the Indonesian mining department to
"extend" the licence. These quarterly activities report statements fail to
acknowledge the reality that the Wonogiri Mining Licence had in fact
been revoked and was not able to be extended.
(ii) (Scoping study for the Wonogiri Copper Gold Project) In May 2022,
FEG engaged Mining One Consultants to update a previously completed
internal scoping study for the Wonogiri Copper Gold Project and
announced to ASX that it expected to release the results of the update in
late July 2022.8 However, FEG has never disclosed on ASX the results of
the revised scoping study for the Wonogiri Copper Gold Project.
(iii) (Woyla CSPA) Although FEG announced on 7 April 2026 that it no
longer had the right to increase its effective interest in the Woyla Copper
Gold Project from 51% to 80%, FEG did not disclose in that
announcement (or any previous announcements) that the pre-conditions
under the Woyla CSPA for FEG to increase its effective interest to 80%
had not been satisfied by 31 December 2024 and that the Woyla CSPA
consequently terminated on that date.
The above issues raise serious concerns about the commitment of FEG’s
management and certain of its directors to transparency and legal compliance, and
therefore to the interests of FEG Shareholders.
(b) (Failures to manage Project Approvals) As discussed in Sections 2 and 3 above,
there is a high degree of uncertainty as to whether the FEG Group holds, or can
continue to retain, the key Project Approvals necessary to undertake exploration
(including drilling) activities at the Wonogiri Copper Gold Project, Woyla Copper
Gold Project, Trenggalek Copper Gold Project and Blue Hill Creek Gold Project.
This uncertainty raises concerns regarding FEG management’s ability to preserve
and realise value from FEG’s Projects.
(c) (Failures in managing cash runway) FEG's rapidly declining cash balance raises
further concerns about the management of its capital resources. Despite raising
approximately $32.12 million since its ASX listing, FEG's cash and cash
equivalents had declined to $3,556,000 by 31 March 2026 and are expected to be
fully depleted by 23 July 2026.
Despite FEG's rapidly declining cash balance and FEG disclosing in its report for the
half-financial year ended 31 December 2025 (which was reviewed by its auditors,
KPMG) that it intends to raise A$10 million net of costs through share placements,
there have been no further announcements by FEG about any capital raising.
6
Refer to page 53 of FEG's Replacement Prospectus dated 1 December 2021.
7
Refer to page 44 of FEG's Replacement Prospectus dated 1 December 2021.
8
Refer to page 2 of FEG’s announcement on ASX dated 10 May 2022.
First Supplementary Bidder's Statement
11
Consequently, the Bidder considers that FEG's management has not taken timely
and adequate steps to secure the funding required for FEG's ongoing operations.
(d) (Failures in basic takeovers law compliance) The Target’s Statement has
numerous technical compliance failures. These failures demonstrate a pattern of
inadequate attention to legal compliance and raise concerns about FEG
management's commitment to protecting the interests of FEG Shareholders. The
failures include:
(i) in relation to the intention statements of the so-called ‘Rejecting
Shareholders’, failing to satisfy any of the criteria noted by the Takeovers
Panel as being relevant to ensuring intention statements do not constitute
unacceptable circumstances;9 and
(ii) contravening section 638(3) of the Corporations Act by not including
statements from FEG Directors Justin Hastings or Monique Tang
providing their recommendation about the Offer or reasons for not
providing a recommendation.
The market price for FEG Shares was rapidly declining prior to the announcement of
the Offer
The market price of FEG Shares was rapidly declining prior to the announcement of the
Offer, notably:
(a) the Last Closing Price of $0.097 per FEG Share was:
(i) 30.71% below the closing price of $0.14 per FEG Share on 15 July 2024,
being the date on which Justin Werner was appointed as the Chair of
FEG;
(ii) 51.50% below the price of $0.20 per FEG Share at which Xingye
acquired FEG Shares in 2024 and 2025 under the Placement Agreement;
and
(iii) 41.21% below the highest price for FEG Shares in the three months
before the date of the Bidder’s Statement of $0.165 per FEG Share; and
(b) during the week before the date of the Bidder’s Statement, FEG Shares traded at
their lowest level since FEG’s initial public offering in 2022, at a VWAP of $0.094
per share.
After the revocation of the Wonogiri Mining Licence and the expiry of the Woyla
CSPA, Justin Werner procured the disposal of FEG Shares
Justin Werner is the Chair of FEG. Mr Werner is also the managing director of Nickel Industries
Limited (ASX: NIC) and a non-executive director of FMR Resources Ltd (ASX: FMR) and EV
Resources Ltd (ASX: EVR).
Bellambi Enterprises Limited (Bellambi), an entity associated with Mr Werner, has previously
sold the following shares in FEG:
(a) on 22 August 2024, following the revocation of the Wonogiri Mining Licence,
Bellambi, sold 147,058 FEG Shares for A$0.136 per share; and10
9
Refer to paragraph 11 of the Takeovers Panel’s Guidance Note 23: Shareholder intention statements.
10
Refer to the Change of Directors Interest Notice lodged by FEG on ASX on 28 August 2024.
First Supplementary Bidder's Statement
12
(b) on 10 April 2025, following the:
(i) revocation of the Wonogiri Mining Licence; and
(ii) expiry of the Woyla CSPA,
Bellambi sold 148,300 FEG Shares for A$0.131572 per share.11
In light of the issues and failures outlined above:
(c) the Bidder considers that FEG’s management team and certain FEG Directors
cannot be trusted to adequately safeguard and promote the interests of FEG
Shareholders; and
(d) FEG Shareholders who share the Bidder's concerns about the governance of their
investment can ACCEPT the Offer now to receive all-cash certainty for their FEG
Shares.
5 Issuance of FEG Shares under the Idenburg CSPA
Issuance of FEG Shares
In connection with Stage One Completion under the Idenburg CSPA, on 21 June 2026, FEG
issued 50,000,000 FEG Shares to Eloquent Enterprises Limited (Stage One Idenburg
Shares), representing approximately 11.99% of FEG Shares on issue.
ASIC modifications
On 26 June 2026, ASIC issued ASIC Instrument 26-0490, which modifies sections 617, 650A
and 650D of the Corporations Act and introduces a new section 650BA, under which the Bid