New Gold Discovery at North Bermol
Released
Released
Announcement PDF
FAR EAST GOLD ASX ANNOUNCEMENT 1
Gold Discovery at North Bermol Confirms
Idenburg’s District-Scale Potential
Far East Gold Limited (ASX: FEG) (“FEG” or “the Company”) is pleased to announce a
significant new gold discovery following the Company’s first-ever scout drilling program at
the North Bermol prospect, located within the Idenburg Contract of Work in Papua Province,
Indonesia.
The discovery of a new, high-grade shear zone confirms the strong potential for multiple
mineralised systems across the Idenburg project, underscoring the Company’s view that
Idenburg is emerging as a district-scale opportunity.
HIGHLIGHTS:
• New discovery of high-grade gold mineralisation hosted in a newly identified
northwest-trending shear zone at North Bermol. Mineralisation is associated with
shallow zones of intense deformation containing quartz veins and coarse sulphide
minerals similar in type and style to that intersected at the main Bermol prospect.
• Strategic target confirmed - Historical exploration highlighted anomalous gold in
surface rocks and soils at North Bermol. Follow-up mapping and rock sampling by FEG
defined structural targets that have now delivered strong gold intercepts from the first
drill program.
Significant drilled intersections include:
o BND003: 2.6m at 3.9 g/t Au from 11.3m, including 0.5m at 15 g/t Au from
12.4m.
o BND004: 5m at 4.9g/t Au from 23.5m, including 1.6m at 12.8 g/t Au from
24.8m
o BND005: 2.8m at 8.4 g/t Au from 32m, including 1.6m at 12.3 g/t Au from
33.2m
• Expanding the gold footprint - The discovery of the North Bermol shear zone opens
up a new resource area within the Idenburg COW and generates additional high
priority structural targets to continue to drill test.
• Assay results have been received for holes BND001 to BND005, with further assays
pending from additional holes completed at North Bermol that tested for sources of
high-grade gold in surface rock samples including a peak sample assay of 53 g/t Au
(see ASX announcement 9 April 2025).
• GM of Exploration, Mike Corey has released a video discussing this announcement.
Watch the video on our investor hub here: https://fareast.gold/link/yaGjpr
ASX ANNOUNCEMENT
28 October 2025
FAR EAST GOLD ASX ANNOUNCEMENT 2
Commenting on the discovery of high-grade gold at the North Bermol Prospect,
Far East Gold CEO Shane Menere said:
“These results, when viewed in the context of Bermol, are extremely significant.
At Bermol, just seven mineralised drill holes out of nine delivered a JORC Inferred Resource
of 228,000 oz Au across a 600 m strike and 300 m width, with a best intercept of 5m at 5 g/t
Au. At North Bermol, we are already seeing a similar best intercept of 5m at 4.9 g/t Au, and
importantly the characteristic shearing and sulphide mineralisation has been confirmed
visually for over 300m of strike and over a dip extent of 400m. Additional assays are pending
from seven more holes, and follow-up drilling is planned to confirm an extension of the shear
zone a further 350m to the south.
This discovery fundamentally strengthens our view of Idenburg as a genuine district-scale gold
system. North Bermol and Bermol both occur within shallow-dipping shear zones that have
potential large extent and would be very amenable to open pit development.
And this is just the beginning, with Sua drilling underway where 18 of the 22 historical holes
drilled intercepted high grade mineralisation such as KSD008 which returned 5m at 21.8 g/t
Au, in many instances high grade mineralization was returned over multiple intercepts, the
Sua prospect currently hosts a JORC inferred resource of 296,000oz at 3.7 g/t Au.
Preparations are also well advanced at the Kwaplu prospect where the geology is similar to
the Sua prospect and historical soil sampling defined an anomaly larger in size than the Sua
prospect with peak soil samples assaying up to 3.5ppm Au.
With a strong balance sheet and over $9 million in cash at the end of the September quarter,
we’re well positioned to continue advancing the Idenburg project.
The broader Idenburg story is rapidly unfolding into one of the most compelling gold exploration
opportunities in the region.”
NORTH BERMOL – NEW DISCOVERY
NORTH BERMOL – NEW DISCOVERY
3
FAR EAST GOLD ASX ANNOUNCEMENT
Figure 1: Map showing prospect and resource areas within the Idenburg COW tenement.
Areas of recent PIPPIP reclassification are shown (green). The North Bermol prospect is
indicated. Coordinates are referenced to datum WGS84, zone 54 south.
Historical exploration and recent detailed mapping and surface rock sampling by the Company
within the North Bermol prospect area found numerous boulders of highly deformed and
sulphide-rich quartz rock. The mapping also identified potential host structures of the boulders
and defined specific drill targets. Refer to ASX Announcements 27 August 2025.
Drilling commenced in North Bermol on 21 September 2025 and to date 12 holes have been
completed (Figure 2 and Table 1). Assays of drill core have been reported for the drill holes
BND001-005 and significant compiled intersections for these holes are provided in Table 2.
Select core photographs from the intersections are provided in Figure 6. The type and style of
gold mineralisation is similar to that intersected within the main Bermol prospect area.
The North Bermol prospect was ranked as a Priority 1 structural target by an independent
structural evaluation of the Idenburg COW. Refer to ASX announcements of 2 and 17
September 2025. The study identified 14 Priority 1 structural targets.
NORTH BERMOL – NEW DISCOVERY
4
FAR EAST GOLD ASX ANNOUNCEMENT
Figure 2: North Bermol plan map showing locations of completed drill holes BND001-005. The
interpreted extent of the North Bermol shear zone is indicated in orange, Refer to Table 1.
Coordinates are referenced to datum WGS84, zone 54 south.
Table 2 presents compiled significant assay intersections for drillholes BND-003 to 005. Holes
BND-001 and 002 did not intersect the shear zone and have no significant intersections. Current
3D interpretation suggests that the North Bermol shear zone in the area drilled has already been
eroded and may occur further to the west. This premise will be tested as part of the current drill
program.
NORTH BERMOL – NEW DISCOVERY
5
FAR EAST GOLD ASX ANNOUNCEMENT
Table 1: Collar details for completed drill holes within the North Bermol prospect area. Coordinates
are referenced to datum WGS84, zone 54 south. Refer to Figure 2 for drill hole locations.
Based on the drill results the North Bermol shear zone is a broad, shallow dipping (15°) plane that
strikes to the northwest and dips to the northeast. The shear zone has been intersected to a depth
of about 30m and has an apparent true thickness of 2-6 meters. 3D modeling of current drill results
suggest that the shear plane has a minimum strike extent (to NW) of 300m and a dip extent (to
NE) of about 400m. The latter is based on visual confirmation of intense shear deformation within
holes BND011 and 012. Assays are pending for these holes.
Refer to Figures 3 and 4 that show a cross section across holes BND004/005 and show select
core photos of the high grade gold mineralisation.
NORTH BERMOL – NEW DISCOVERY
6
FAR EAST GOLD ASX ANNOUNCEMENT
Table 2: Compiled significant intersections from FEG drillholes BND001 to BND005. Intersections
were compiled using a 0.2 g/t Au cut-off with no grade top cut. A maximum of 3 meters of internal
dilution was included. Refer to Table 1 for hole collar details. Assays are pending for North Bermol
drill holes BND006 to 012.
Cross sections for drill holes BND004 and 005 are shown in Figure 3 with select core photos shown
in Figure 4. Rock and mineral textures suggest that the high-grade gold-sulphide mineralisation
occurred late in the deformation history. Further detailed study is required to determine specific
controls and relative timing of the gold mineralisation.
The drill results clearly demonstrate that the Idenburg COW warrants considerable further
exploration. The Company will expand the new discovery exploration strategy of low-cost detailed
mapping and sampling over priority structural targets to define drill targets.
NORTH BERMOL – NEW DISCOVERY
7
FAR EAST GOLD ASX ANNOUNCEMENT
Figure 3: Cross section (looking North) showing the trace of the North Bermol shear zone and
significant intersections within holes BND004/005. Mineralisation remains open laterally and
down-dip within the shear plane
NORTH BERMOL – NEW DISCOVERY
8
FAR EAST GOLD ASX ANNOUNCEMENT
Figure 4: Photos of drill core from holes BND004 (A) and BND005 (B) showing highly fractured
quartz within coarse blebs of sulphide in the matrix. The coarse sulphide and massive quartz
within a intensely deformed shear zone suggests that the sulphides (and associated gold
mineralization) occurred late in the deformation history. A) from hole BND004 (24.8m),
assayed 15.4 g/t Au over 0.5m from 24.8-25.3m. B) from hole BND005 (34.3m), assayed 12.7
g/t Au over 0.5m from 34.3-34.8m.
Figures 5 and 6 show the extent of the modelled North Bermol shear plane and a long section along dip.
Mineralisation occurs in a near surface, shallow-dipping plane that remains open laterally and down dip
and considerable drilling is required to fully assess the resource potential of the modeled shear plane.
NORTH BERMOL – NEW DISCOVERY
9
FAR EAST GOLD ASX ANNOUNCEMENT
Figure 5: Above- 3D model showing the assumed extent of the North Bermol shear zone.
The shear zone is interpreted to occur as a low angle plane, that ranges from 2-6m in thickness
and dips to the northeast. Below- interpreted long section (looking west) showing the extent
of the shear plane from south (left) to north (right). Holes BND011/012 intersected the
interpreted shear plane with sulphides and assays are pending
NORTH BERMOL – NEW DISCOVERY
10
FAR EAST GOLD ASX ANNOUNCEMENT
COMPETENT PERSON’S STATEMENT
The information in this announcement that relates to exploration results (Including JORC Tables) is
based on and fairly represents information and supporting documentation prepared, reviewed and
approved by Mr Michael C Corey, a competent person who is a member of the Association of
Professional Geoscientists of Ontario (APGO), Canada. Mr Michael C Corey is employed on a
consulting basis by Far East Gold Limited as the General Manager of Exploration. Mr Michael C Corey
has sufficient experience which is relevant to the style of mineralisation and type of deposits under
consideration and to the activity being undertaken to qualify as a Competent Person as defined in the
2012 edition of the JORC Code. Mr Michael C Corey has provided his prior written consent as to the
form and context in which the exploration results and the supporting information are presented in this
announcement.
The information referenced in this announcement that is based on the results and interpretation of
historical exploration within the Idenburg COW was compiled and reported by SMG Consultants in the
reports entitled: PT Iriana Mutiara Idenburg Exploration Target Report June 2024’ and ‘JORC
Resource Report, PT Iriana Mutiara Idenburg, November 2024’. The Company confirms that it is not
aware of any information or data that materially affects the information included in the market
announcements, and that all material assumptions and technical parameters underpinning the
announcements continue to apply. The Company confirms that the form and context in which the
Competent Person’s findings are presented have not been materially modified from the original market
announcements
ABOUT FAR EAST GOLD
Far East Gold Limited (ASX: FEG) is an ASX listed copper/gold exploration company with six
advanced projects in Australia and Indonesia. This Release has been approved by the FEG Board of
Directors.
FURTHER INFORMATION:
Sign up to the Far East Gold investor hub to receive important news and updates directly to your
inbox, and to engage directly with our leadership team: https://investorhub.fareast.gold/auth/signup
Justin Werner
Chairman
Shane Menere
Chief Executive Officer
Tim Young
Investor Relations &
Capital Markets
e:
justin.wernere@fareast.gold
e: shane.menere@fareast.gold e: tim.young@fareast.gold
m: + 61 406 189 672
+ 62 811 860 8378
m: + 61 484 247 771
1
JORC Code, 2012 Edition – Table 1
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria JORC Code explanation Commentary
Sampling
techniques
• Nature and quality of sampling (eg cut
channels, random chips, or specific
specialised industry standard measurement
tools appropriate to the minerals under
investigation, such as down-hole gamma
sondes, or handheld XRF instruments, etc).
These examples should not be taken as
limiting the broad meaning of sampling.
• Include reference to measures taken to
ensure sample representivity and the
appropriate calibration of any measurement
tools or systems used.
• Aspects of the determination of
mineralisation that are Material to the Public
Report.
• In cases where ‘industry standard’ work has
been completed this would be relatively
simple (eg ‘reverse circulation drilling was
used to obtain 1 m samples from which 3 kg
was pulverised to produce a 30 g charge for
fire assay’). In other cases more explanation
may be required, such as where there is
coarse gold that has inherent sampling
problems. Unusual commodities or
mineralisation types (eg submarine nodules)
may warrant disclosure of detailed
information.
• All Idenburg drill core was digitally
photographed and logged by FEG project
geologists. Core with any potential for
mineralisation was marked up for sampling
and despatched to an analytical laboratory
for geochemical analysis. Only visually
obvious non-mineralised core was not
sampled.
• Cut, half core was selected for geochemical
analysis.
• The drill core sample intervals range from
0.5 to 1.50 m in length.
• All half core samples were jaw-crushed and
split onsite in the Company operated core
facility. Sample packets of 500g were put
into woven polysacks by site personnel and
air freighted to Pt.Geoservices in Bekasi,
West Java, Indonesia.
• Additional sample preparation and assays
were undertaken by the independent Pt.
Geoservices laboratory in Bekasi, Indonesia.
• Gold analyses of all drill core samples were
by fire assay with atomic absorption
spectrometry (AAS) finish of a 50g sample,
with a detection limit of 0.01 g/t Au (method
FAA50).
• For the determination of base metal AAS
analytes the GAI02_ICP analytical methos –
with detection limits of Ag (0.5 ppm) and Cu,
Pb, Zn (each 5 ppm) and 1 ppm detection
limit for As.
Drilling
techniques
• Drill type (eg core, reverse circulation, open-
hole hammer, rotary air blast, auger,
Bangka, sonic, etc) and details (eg core
diameter, triple or standard tube, depth of
diamond tails, face-sampling bit or other
type, whether core is oriented and if so, by
what method, etc).
• Triple tube diamond core drilling – fully
drilled with diamond bit with PQ collar.
• Core diameter was mostly HQ, reducing to
NQ at depth.
• Down-hole surveying was routinely
conducted at 30 m intervals.
• Core orientation was measured using a
MagCruiser MM105 from Stockholm
Precision Tools.
• Core was fitted together and marked up for
sampling by a geologist, and where loose
fragments were seen core was wrapped in
masking tape prior to the core sawn in half.
Drill
sample
recovery
• Method of recording and assessing core and
chip sample recoveries and results
assessed.
• Measures taken to maximise sample
recovery and ensure representative nature
of the samples.
• Whether a relationship exists between
sample recovery and grade and whether
sample bias may have occurred due to
preferential loss/gain of fine/coarse material.
• All core sample recovery recorded in both
hard copy and digital logging sheets and
recovery results assessed by project
geologists.
• No significant drilling problems encountered
resulted in very good core recoveries.
• Statistical analyses indicate no relationship
between grade and recovery.
2
Criteria JORC Code explanation Commentary
Logging
• Whether core and chip samples have been
geologically and geotechnically logged to a
level of detail to support appropriate Mineral
Resource estimation, mining studies and
metallurgical studies.
• Whether logging is qualitative or quantitative
in nature. Core (or costean, channel, etc)
photography.
• The total length and percentage of the
relevant intersections logged.
• All drill holes were logged by geologists.
• All logging data recorded intervals from and
to, including lithology, mineralisation,
alteration, sulphides seen, detailed structure
and geotechnical characteristics.
• All core was photographed both dry and wet.
• All samples that were identified as having
any potential mineralisation were assayed.
Sub-
sampling
techniques
and
sample
preparation
• If core, whether cut or sawn and whether
quarter, half or all core taken.
• If non-core, whether riffled, tube sampled,
rotary split, etc and whether sampled wet or
dry.
• For all sample types, the nature, quality and
appropriateness of the sample preparation
technique.
• Quality control procedures adopted for all
sub-sampling stages to maximise
representivity of samples.
• Measures taken to ensure that the sampling
is representative of the in-situ material
collected, including for instance results for
field duplicate/second-half sampling.
• Whether sample sizes are appropriate to the
grain size of the material being sampled.
• Core samples were logged and all intervals
for analysis were marked up by FEG
geologists, at 0.5 and 1 metre intervals.
• Core samples for analyses were cut into half
and collected by experienced FEG
personnel.
• drill core sample intervals range from 0.5 to
1.5 m in core length.
• Selected quarter core samples were
assayed for quality assurance and quality
control analysis as field duplicates.
Quality of
assay data
and
laboratory
tests
• The nature, quality and appropriateness of
the assaying and laboratory procedures
used and whether the technique is
considered partial or total.
• For geophysical tools, spectrometers,
handheld XRF instruments, etc, the
parameters used in determining the analysis
including instrument make and model,
reading times, calibrations factors applied
and their derivation, etc.
• Nature of quality control procedures adopted
(eg standards, blanks, duplicates, external
laboratory checks) and whether acceptable
levels of accuracy (ie lack of bias) and
precision have been established.
• All samples were despatched to the
independent laboratory Pt.Geoservices in
Bekasi
• Certified reference samples and blank and
field duplicate samples were submitted at a
rate of one each per 20 samples.
Verification
of
sampling
and
assaying
• The verification of significant intersections by
either independent or alternative company
personnel.
• The use of twinned holes.
• Documentation of primary data, data entry
procedures, data verification, data storage
(physical and electronic) protocols.
• Discuss any adjustment to assay data.
• Data entry involves constructing Excel and
Access spreadsheets directly from final
laboratory assay reports delivered
electronically in PDF and Excel format.
• Database verified by FEG exploration
manager, including all significant drill
intersections.
• Data stored in company server located in
Jakarta, Indonesia.
Location of
data points
• Accuracy and quality of surveys used to
locate drill holes (collar and down-hole
surveys), trenches, mine workings and other
locations used in Mineral Resource
estimation.
• Specification of the grid system used.
• Quality and adequacy of topographic control.
• Drilling and surface rock sampling grid
(Northing, Easting and elevation) was
established with handheld GPS control and
tape and compass surveyed in the rugged
terrain.
• Drill hole collars and all sample points will be
picked up by contract surveyor at completion
of drilling program.
3
Criteria JORC Code explanation Commentary
• The existing topographic survey is
considered adequate for the current DTM.
Minor local discrepancies are evident and
further survey work will be required should
further Resource definition ensue.
• Grid system used is Universal Transverse
Mercator (WGS 84) UTM Zone 54, Southern
Hemisphere.
Data
spacing
and
distribution
• Data spacing for reporting of Exploration
Results.
• Whether the data spacing and distribution is
sufficient to establish the degree of
geological and grade continuity appropriate
for the Mineral Resource and Ore Reserve
estimation procedure(s) and classifications
applied.
• Whether sample compositing has been
applied.
• Drill hole spacing and drill section spacing
was as close to 100 m as the rugged ground
conditions allowed.
• Drilling has verified the historical mapping
and trenching that identified intense shear
and fault related deformation.
• Samples are not composited for analysis.
Orientation
of data in
relation to
geological
structure
• Whether the orientation of sampling
achieves unbiased sampling of possible
structures and the extent to which this is
known, considering the deposit type.
• If the relationship between the drilling
orientation and the orientation of key
mineralised structures is considered to have
introduced a sampling bias, this should be
assessed and reported if material.
• Drill sections are oriented perpendicular to
main strike of shallow dipping vein
structures.
• Most holes were drilled on section.
• Vertical and mostly inclined holes were
drilled, depending on the interpreted
orientation of the shear/fault zone hosting
the mineralisation.
• The orientation of the drilling is considered
adequate for an unbiased assessment with
respect to interpreted structural controls of
mineralisation.
Sample
security
• The measures taken to ensure sample
security.
• All drill core samples were packed on site
into polysacks by experienced FEG
personnel before being delivered to a logistic
depot near Jayapura airport and air-freighted
to Jakarta, Indonesia.
• Initial coarse crushing and sample split was
undertaken by trained FEG technicians at
Senggi core facility. Additional sample
preparation and assaying was completed at
the Pt. Geoservices laboratory in Bekasi,
Indonesia.
• Pulps and coarse rejects will be stored at the
Pt. Geoservices
Audits or
reviews
• The results of any audits or reviews of
sampling techniques and data.
• Sampling procedures and data collection are
frequently reviewed by FEG exploration
staff. No independent audit of sampling
methodologies has been done.
4
Section 2 Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section.)
Criteria JORC Code explanation Commentary
Mineral
tenement and
land tenure
status
• Type, reference name/number, location and
ownership including agreements or material issues
with third parties such as joint ventures, partnerships,
overriding royalties, native title interests, historical
sites, wilderness or national park and environmental
settings.
• The security of the tenure held at the time of reporting
along with any known impediments to obtaining a
license to operate in the area.
• A 6th generation Contract of Work (COW)
between PT. Iriana Mutiara Idenburg (IMI)
and the Government of the Republic of
Indonesia signed on 28 April 1997
• Project Area covers 95,280 hectares.
• No further partial relinquishments required.
• COW currently in Exploration Period.
• 30 year production period with possible 2 x
10 year extensions.
• Obligations and commitments governed by
COW amended to conform to 2009 Mining
Law.
Exploration
done by other
parties
• Acknowledgment and appraisal of exploration by
other parties.
• Known historical mineral prospects and
Resources were located and documented
located by previous IMI tenure holders.
• Acknowledgment and appraisal of
exploration by other parties include Barrick
Gold Corporation and Avocet Mining under
Joint Venture, Placer Dome under
Exclusive Option Period and Minorco,
Newcrest Mining, Newmont Mining under
confidential due diligence investigations.
• ACA Howe International Ltd. compiled an
independent technical report on the key
prospective targets within the COW held by
IMI.
• SMGC in Jakarta completed an Exploration
Target Assessment and a Maiden inferred
JORC resource estimate for FEG in 2024.
Geology
• Deposit type, geological setting and style of
mineralisation.
• All gold prospects are located within the
exotic Idenburg Inlier terrane, an
approximately 30x30km block of
amphibolite facies metamorphic rocks
hosting dismembered ophiolites emplaced
along regionally extensive thrust faults.
• Tectonic setting is on edge of Pacific Rim,
in complex collisional zone between
Northward creeping Australian continental
plate and oceanic Pacific Plate drifting to
Southwest.
• Style of gold mineralisation as determined
from field observations including mapping
and drill core logging is of the orogenic gold
type, also referred as mesothermal lode
gold.
• Repeated petrographic investigations
suggest the presence of auriferous,
sheared quartz veins in metamorphic rocks
with alteration assemblages seen and fluid
inclusion homogenisation temperatures
indicate that orogenic lode gold deposits
are present.
Drill hole
Information
• A summary of all information material to the
understanding of the exploration results including a
tabulation of the following information for all Material
drill holes:
- Easting and Northing of the drill hole collar
• Drill hole collar details were provided in the
included Table and shown on the included
plan map.
5
Criteria JORC Code explanation Commentary
- elevation or RL (Reduced Level – elevation
above sea level in metres) of the drill hole collar
- dip and azimuth of the hole
- down-hole length and interception depth
- hole length.
• If the exclusion of this information is justified on the
basis that the information is not Material and this
exclusion does not detract from the understanding of
the report, the Competent Person should clearly
explain why this is the case.
Data
aggregation
methods
• In reporting Exploration Results, weighting averaging
techniques, maximum and/or minimum grade
truncations (eg cutting of high grades) and cut-off
grades are usually Material and should be stated.
• Where aggregate intercepts incorporate short lengths
of high grade results and longer lengths of low grade
results, the procedure used for such aggregation
should be stated and some typical examples of such
aggregations should be shown in detail.
• The assumptions used for any reporting of metal
equivalent values should be clearly stated.
• Significant assay intersections were
calculated using a 0.2 g/t Au cut-off with no
top-cut and maximum 3m of internal
dilution.
• Samples of variable lengths were weighted
when present as part of calculating
significant assay intersection.
• No grade equivalents are reported.
Relationship
between
mineralisation
widths and
intercept
lengths
• These relationships are particularly important in the
reporting of Exploration Results.
• If the geometry of the mineralisation with respect to
the drill hole angle is known, its nature should be
reported.
• If it is not known and only the down-hole lengths are
reported, there should be a clear statement to this
effect (eg ‘down-hole length, true width not known’).
• The drill targets were tested with the aim of
intersecting the interpreted structural
features as perpendicular as possible to the
strike, based on the geological
interpretation from historical data and
determined from surface creek mapping
and mapping of fault/shear zone exposures.
• Results are reported as down-hole widths,
in most cases, true width is approximately
80-85 % of down-hole length.
Diagrams
• Appropriate maps and sections (with scales) and
tabulations of intercepts should be included for any
significant discovery being reported These should
include, but not be limited to a plan view of drill hole
collar locations and appropriate sectional views.
• Figures attached.
Balanced
reporting
• Where comprehensive reporting of all Exploration
Results is not practicable, representative reporting of
both low and high grades and/or widths should be
practiced to avoid misleading reporting of Exploration
Results.
• Results from all drill holes in the historic
programs for which assays have been
received have been reported in previous
FEG announcements.
Other
substantive
exploration
data
• Other exploration data, if meaningful and material,
should be reported including (but not limited to):
geological observations; geophysical survey results;
geochemical survey results; bulk samples – size and
method of treatment; metallurgical test results; bulk
density, groundwater, geotechnical and rock
characteristics; potential deleterious or contaminating
substances.
Previous historical exploration activities
included:
• Regional drainage sampling has been
completed over the entire remaining Project
Area at a sampling density of just over 1
sample per 5 sq. km. At each stream site a -
80# stream sediment, panned concentrate
and BLEG sample were collected, along
with any mineralised rock float or rock
outcrops.
• The BLEG samples were assayed for Au,
Ag and Cu. The silt and rock samples were
assayed for Au, Ag, Cu, Pb, Zn, Mo, Sb,
Hg, Bi, Ni, Co, K and Cr.
• Lithostructural interpretations from air
photos and satellite imagery.
6
Criteria JORC Code explanation Commentary
• Compilation of all geochemical, geological
and geophysical data into a GIS database
initially in Datamine and Leapfrog format.
• Preliminary metallurgical test work, on
surface samples and on drill core
composites from the Sua district show that
50 to 60 % of the contained gold is
recoverable by gravity, while overall
recoveries by carbon-in-leach (CIL) or
resin-in-leach (RIL) processes exceed 95
%.
• Preliminary cyanide-leach, bottle-roll tests
on Bermol rock material by Placer
reportedly indicated gold recoveries
Share your feedback
Discover