Quarterly Activities/Appendix 5B Cash Flow Report
Released
Released
Announcement PDF
ASX ANNOUNCEMENT
31 July 2023
REPORT ON ACTIVITIES FOR
THE QUARTER ENDED
30 JUNE 2023
(ASX: FEG)
FAR EAST GOLD LTD ACN 639 887 219
WWW.FAREAST.GOLD
EXPLORATION ACTIVITES
DURING 2 N D QUARTER
ENDED 30 JUNE 2023
Far East Gold Ltd (‘FEG’ or ‘the Company’) is pleased to provide an update of exploration and work
activities completed across the quarter ending 30 June 2023 on its highly prospective portfolio of
Indonesian and Australian projects.
WOYLA PROJECT HIGHLIGHTS
FEG continued to test epithermal quartz vein targets within the Woyla Copper Gold Project’s 24,260ha
Contract of Work (COW) tenement. To date the Company has drill tested 6 of 12 quartz vein zones
identified by historical and recent surface mapping within 3 separate vein systems at Woyla (Anak Perak,
Rek Rinti and Aloe Eumpeuk prospect areas). This represents drill testing of approximately 2,500m of
the more than 13,000m defined strike length for these vein systems across the tenement.
The occurrence of discrete zones of high-grade gold and silver mineralisation has been intersected in
each of the vein systems tested.
FEG is encouraged by the results so far from its ongoing 10,000m Phase 2 diamond drilling program at
its Woyla Copper Gold Project in Aceh, Indonesia. By the end of the June 2023 quarter 51 holes totaling
8,028m of the Phase 2 program had been completed with assays returned for 44 holes.
21 of these 44 holes have returned gold assays greater than 3.94 g/t Au that includes 10 holes
with assays greater than 7.85 g/t Au of which 4 holes had assays greater than 17.5 g/t Au. Peak
gold assays for each of the prospect areas explored so far in Phase 2 are as follows:
•
Rek Rinti – 0.5m at 81 g/t Au and 734 g/t Ag from 201.2m in drillhole AGM007
•
Aloe Eumpeuk – 0.4m at 28.06 g/t Au and 957 g/t Ag from 108.95m in drillhole AED007
•
Anak Perak – 1m at 12.09 g/t Au and 8.3 g/t Ag from 42.2m in drillhole APD021
Results from the Phase 1 and Phase 2 diamond drilling programs confirm that the epithermal veins being
explored at both Rek Rinti and Aloe Eumpeuk are largely comprised of massive crystalline quartz with
local development of colloform-crustiform banded quartz containing narrow zones with ginguro
banding that contain fine-grained disseminated gold and electrum, galena, chalcopyrite and black
sulphides.
These results indicate that the physiochemical process necessary to develop bonanza-grade type
mineralization did occur at Woyla. The Phase 1 drillhole RRD004 indicates that such zones can occur
over significant width.
FAR EAST GOLD ASX ANNOUNCEMENT
1
JUNE QUARTERLY EXPLORATION UPDATE
31 JULY 2023
Aloe Eumpeuk - Scout Drilling Success
In early April 2023 FEG commenced an initial 6 hole, 650m scout drilling program at the Aloe Eumpeuk
prospect area where detailed mapping from FEG geologists has returned bonanza grade peak assay
results of 131 g/t Au and 1,508 g/t Ag associated with coarse visible gold in samples taken from artisanal
mining pits (see the Company’s ASX announcement dated 4 April 2023).
The Company’s initial scout drilling program is the first ever drilling at the Aloe Eumpeuk prospect area
and was planned to test two defined veins over a strike length of 300m. Initial results are extremely
encouraging with multiple occurrences of visible gold and electrum seen within the drill core (see the
Company’s ASX announcement dated 17 April 2023). The second hole (AED002) intersected a 11.6m
wide massive quartz zone containing high grade gold and silver mineralisation from 75.4m. Significant
assays from this intersection include:
•
1m at 18.46 g/t Au and 1,359 g/t Ag (34.77 g/t AuEq) from 75.4m – 76.4m
•
1m at 12.94 g/t Au and 625 g/t Ag (20.44 g/t AuEq) from 78.5m – 79.5m
•
1m at 9.85 g/t Au and 259 g/t Ag (12.95 g/t AuEq) from 86m – 87m
Consequently, FEG decided to increase its scout drilling program at Aloe Eumpeuk to further test the 2
quartz veins over a lateral distance of approximately 500m and to about 150m vertical depth. By the end
of the June 2023 quarter FEG had completed 21 drill holes at Aloe Eumpeuk totaling 2,435.9m with
assays received for 18 of these holes. Significant assays include:
•
AED002 – 2.6m at 7.31 g/t Au and 540.78 g/t Ag from 74.4m – 77m including 1m at
18.46 g/t Au and 1359 g/t Ag (34.77 g/t AuEq) from 75.4m
•
AED005 – 6.8m at 1.2 g/t Au and 36.61 g/t Ag from 61.2m – 68m including 0.9m at 4
g/t Au and 114 g/t Ag (5.37 g/t AuEq) from 61.2m
•
AED007 – 1.85m at 6.39 g/t Au and 257.27 g/t Ag from 18.95m – 110.8m including
0.4m at 28.06 g/t Au and 957 g/t Ag (39.54 g/t AuEq) from 108.95m
•
AED008 – 1.6m at 6.36 g/t Au and 248.62 g/t Ag from 101m – 102.6m including 1m at
9.4 g/t Au and 330 g/t Ag (13.36 g/t AuEq) from 101.6m
•
AED011 – 6.3m at 2.62 g/t Au and 232.3 g/t Ag from 102.6 – 108.9m including 0.65m
at 14.48 g/t Au and 1,260 g/t Ag (29.60 g/t AuEq) from 102.6m
•
AED014 – 3.4m at 2.11 g/t Au and 282.4 g/t Ag from 56.5m – 59.9m including 0.6m at
6.39 g/t Au and 297 g/t Ag (9.95 g/t AuEq) from 58.5m
•
AED015 – 8.4m at 0.86 g/t Au and 59.61 g/t Ag from 48m – 56.4m including 0.6m at
5.53 g/t Au and 176 g/t Ag (7.64 g/t AuEq) from 52.4m
•
AED016 – 6m at 0.54 g/t Au and 98.38 g/t Ag from 77m – 83m including 0.5m at 2.67
g/t Au and 66 g/t Ag (3.46 g/t AuEq) from 80.5m
•
AED017 – 1.7m at 0.49 g.t Au and 8.78 g/t Ag from 28.3m – 30m including 0.5m at
5.69 g/t Au and 106 g/t Ag (6.97 g/t AuEq) from 32m
•
AED018 – 6.8m at 3.5 g/t Au and 113.97 g/t Ag from 65.2m – 68.9m including 1m at
17.6 g/t Au and 160 g/t Ag (19.52 g/t AuEq) from 65.2m
FAR EAST GOLD ASX ANNOUNCEMENT
2
JUNE QUARTERLY EXPLORATION UPDATE
31 JULY 2023
FEG is very pleased with the results so far at Aloe Eumpeuk. The assay results indicate the presence of
a narrow high-grade Au-Ag zone that extends laterally for 150m and which is open to the south. The
Company will test the extension of this zone as part of the current drill program.
Rek Rinti – Resource delineation and scout drilling continues to intercept high grade gold
FEG’s Phase 1 scout drilling program was completed in December 2022 and comprised 33 holes totaling
4,640.9m. This program included 13 drill holes totaling 1,984.2m that tested 3 separate epithermal quartz
veins at Rek Rinti (see the Company’s ASX announcement dated 2 February 2023). The Phase 1 drill
program returned two discovery holes at Rek Rinti and significant assays from these holes include:
•
RRD003 – 2m at 30.9 g/t Au and 18.9 g/t Ag from 191m including 1m at 59g/t Au and
36.6g/t Ag from 192m
•
RRD004 – 30m at 2.83 g/t Au and 49.73 g/t Ag (3.43 g/t AuEq) from 98m including
05.m at 78g/t Au and 631 g/t Ag (85.57 g/t AuEq) from 108.6m
The Phase 2 initial resource delineation drilling program within the Rek Rinti prospect area commenced
on 19 January 2023 at the Agam vein zone. The resource delineation program is proceeding with 50mspaced drilling centered on the Phase 1 discovery hole RRD004.
20 drill holes (AGM001-AGM019) totaling 4,171.3m have been completed by the end of the June
2023 quarter with assays received for 17 holes as part of the resource delineation program. During the
June 2023 quarter, ten of these drill holes (AGM011-AGM019) totaling 2,025.9m were completed. This
includes 125m in hole AGM014R that was redrilled to improve core recovery. Significant assays include:
•
AGM001 – 4.8m at 1.41 g/t Au and 15.33 g/t Ag from 122.2m – 127m including 1m at
3.97 g/t Au and 32.4 g/t Ag (4.36 g/t AuEq) from 125m
•
AGM002 – 0.4m at 5.38 g/t Au and 17.20 g/t Ag (5.59 g/t AuEq) from 255.5m – 255.9m
•
AGM003 – 3.65m at 4.10g/t Au and 32.32 g/t Ag (4.48 g/t Au Eq) from 84.7m – 88.3m
including 0.7m at 8.95 g/t Au and 37.4 g/t Ag (9.4 g/t AuEq) from 85.3m
•
AGM004 – 9m at 1.94 g/t Au and 43.39 g/t Ag (2.46 g/t AuEq) from 144m – 153m
including 1m at 3.97 g/t Au and 83 g/t Ag (4.97 g/t AuEq) from 144.5m.
•
AGM006 – 1.8m at 1.07 g/t Au and 4.08 g/t Ag from 62m – 63.8m including 0.4m at
4.24 g/t Au and 8.4 g/t Ag (4.34 g/t AuEq) from 63.4
•
AGM007 – 5.3m at 8.43 g/t Au and 99.89 g/t Ag (9.97 g/t AuEq) from 201.2m – 206.5m
including 0.5m at 81 g/t Au and 734 g/t Ag (89.81 g/t AuEq) from 201.2m
•
AGM008 – 6.2m at 0.55 g/t Au and 15.2 g/t Ag from 44.5m – 50.7 including 0.7m at
2.11 g/t Au and 98 g/t Ag (3.28 g/t AuEq) from 47.4m
•
AGM009 – 0.5m at 9.07 g/t Au and 6.8 g/t Ag from 138.35m – 138.85m
•
AGM012 – 5m at 1.11 g/t Au and 40.38 g/t Ag from 46m – 51m including 1m at 3.97
g/t Au and 75 g/t Ag (3.36 g/t AuEq) from 49m
•
AGM012 – 1m at 7.85 g/t Au and 9.6 g/t Ag (7.96 g/t AuEq) from 69m – 70m
•
AGM013 – 3.3m at 3.58 g/t Au and 36.59 g/t Ag from 164m – 167.3m including 0.5m
at 12.85 g/t Au and 112 g/t Ag (14.19 g/t AuEq) from 164.5m
FAR EAST GOLD ASX ANNOUNCEMENT
3
JUNE QUARTERLY EXPLORATION UPDATE
31 JULY 2023
•
AGM014 – 3m at 1.2 g/t Au and 19.48 g/t Ag from 112m – 115m including 0.5m at 3.94
g/t Au and 57 g/t Ag (4.63 g/t AuEq) from 112m
•
AGM015 – 2m at 1.32 g/t Au and 1.7 g/t Ag from 131m – 133m including 1m at 2.38
g/t Au and 2.1 g/t Ag (2.41 g/t AuEq) from 132m
•
AGM017 – 2.4m at 2.81 g/t Au and 21.23 g/t Ag (3.07 g/t AuEq) from 216.4m – 218.8m
including 0.9m at 6.7 g/t Au and 53 g/t Ag (7.34 g/t AuEq) from 217.4m
•
AGM017 – 2.4m at 3.02 g/t Au and 50.6 g/t Ag (3.62 g/t AuEq) from 219.9m – 222.3m
including 0.6m at 7.29 g/t Au and 171 g/t Ag (9.34 g/t AuEq) from 219.9m
During the June 2023 quarter an additional 4 holes (RRD014-RRD017) totaling 633.1m were
completed at Rek Rinti as part of a scout drill program that continues to test quartz vein targets with
assays received for 3 of these holes. Significant assays include:
•
RRD014 – 2.9m at 0.82 g/t Au and 41.37 g/t Ag from 98.9m – 1-1.8m including 0.7m
at 1.39 g/t Au and 155 g/t Ag (3.25 g/t AuEq) from 100.5m
•
RRD016 – 1.2m at 0.02 g/t Au and 618 g/t Ag (7.44 g/t AuEq) from 94.4m
Anak Perak – Confirmation of high-grade gold zone over a strike length of 100m
As part of the Phase 2 scout drilling program FEG has completed 6 holes totaling 788.5m at the Anak
Perak prospect area during the first quarter 2023 with final assays received during the June 2023 quarter.
Drillholes APD008 and APD011 in the Phase 1 scout drilling program returned high grade gold assays.
Drillhole APD021 in the Phase 2 scout drilling program was located between these two holes and
confirmed continuation of the interpreted high-grade gold zone over a strike length of 100m which
remains open to the north. Significant assay results from this high grade zone include:
•
APD008 – 1.45m at 6.21 g/t Au and 19.8 g/t Ag from 88.4m
•
APD021 – 6.4m at 2.53 g/t Au and 5.6 g/t Ag from 38.2m including 1m at 12.09 g/t Au
and 8.3 g/t Ag from 42.2m
•
APD011 – 10.75m at 3.18 g/t Au and 10.4 g/t Ag (3.3 g/t AuEq) from 49.35m including
2.5m at 10.5g/t Au and 19.2 g/t Ag from 51m and 0.3m at 24.91 g/t Au and 25.2 g/t Ag
from 53.2m.
FAR EAST GOLD ASX ANNOUNCEMENT
4
JUNE QUARTERLY EXPLORATION UPDATE
31 JULY 2023
Kareung Reuboeh – New Prospect Area Defined
During the June 2023 quarter FEG carried out detailed mapping and rock sampling at the new Kareung
Reuboeh prospect approximately 1.5km south of Aloe Eumpeuk and has discovered two quartz veins for
which assay results indicate significant gold concentration.
This is a very significant discovery for the Company as the veins were not previously identified by
historical exploration and effectively confirms continuation of the structural corridor between the Aloe
Eumpeuk and Aloe Rek prospect areas and the potential for additional veins within in it. Initial sampling
of quartz stockwork veins has shown bonanza grade assay results with peak assay from these rock
samples including:
•
28.4 g/t Au and 8.5 g/t Ag
•
58 g/t Au and 27.3 g/t Ag
•
98 g/t Au and 77 g/t Ag
TRENGGALEK PROJECT HIGHLIGHTS
The Trenggalek Copper Gold Project is an advanced 12,813 hectare Izin Usaha Pertambangan – Operasi
Produksi (IUP-OP) mining licence for operation and production located in East Java, Indonesia.
Extensive advanced exploration has previously been carried out on the project and includes:
•
17,786m of drilling
•
3,675km airborne magnetic and radiometric survey
•
Surface Geochem survey of >10,500 soil and >5,000 rock samples
•
Induced Polarisation (IP) Resistivity geophysics
On 10 May 2021 FEG entered into a Conditional Share Purchase Agreement (CSPA) to acquire 100%
economic interest in the Trenggalek Project. On 29 March 2023 approval was received from the Indonesian
Minister for Energy & Mines for the share transfer required to give effect to the CSPA. On 6 June 2023 Stage
2 Completion of the CSPA was achieved and transfer of all shares was concluded.
FAR EAST GOLD ASX ANNOUNCEMENT
5
JUNE QUARTERLY EXPLORATION UPDATE
31 JULY 2023
TENEMENT SUMMARY
Project
Location
Mining Licence
Type
Tenement Minerology
Area
Type
Current Percentage
Beneficial Ownership
Woyla
Copper Gold
Project
Aceh,
Indonesia
6th Generation
Contract of Work
24,260 ha
Porphyry and
Epithermal
51% - will increase to 80%
upon completion of maiden
JORC resource estimate and
Indonesian Govt feasibility
study
Trenggalek
Copper Gold
Project
East Java,
Indonesia
IUP - Operation
and Production
12,813 ha
Porphyry and
Epithermal
100%
Wonogiri
Copper Gold
Project
Central Java,
Indonesia
IUP – Exploration
3,928 ha
Porphyry and
Epithermal
100%
Mount Clark
West
Copper Gold
Project
Connors Arc
Queensland,
Australia
Exploration
Permit Minerals
(EPM)
1,912 ha
Porphyry
90%
Hill 212
Gold Project
Drummond Basin
Queensland,
Australia
Exploration
Permit Minerals
(EPM)
1,920 ha
Epithermal
90%
Blue Grass
Creek
Gold Project
Drummond Basin
Queensland,
Australia
Exploration
Permit Minerals
(EPM)
2,240 ha
Epithermal
90%
Table 1: List of FEG projects and current status as at end Q2 2023.
During the June 2023 quarter the Company completed its acquisition of 100% economic interest in the
Trenggalek Project. The Company did not acquire or dispose of any other mining tenement and its
beneficial interest in the tenements for each of its other projects remained unchanged. The Company
did not enter into any new farm in or farm out agreements during the quarter.
FAR EAST GOLD ASX ANNOUNCEMENT
6
JUNE QUARTERLY EXPLORATION UPDATE
31 JULY 2023
FAR EAST GOLD PROJECT LOCATIONS
Figure 1: Map shows location of FEG projects in Indonesia and Australia
INDONESIAN PROJECT ACTIVITIES
WOYLA PROJECT – ACEH PROVINCE, INDONESIA
The Company’s Woyla Copper Gold Project is a 24,260 ha 6th generation Contract of Work (COW)
located in the Aceh region of North Sumatra, Indonesia (Figure 1). In the Company’s opinion this project
was one of the most highly prospective undrilled copper gold projects in South-East Asia with the potential
to host high grade epithermal and porphyry deposits. FEG holds a 51% interest in the project that will
increase to 80% upon the Company’s completion of a feasibility study and definition of a maiden JORC
resource estimate for the project.
The Company continues to test vein targets within the Rek Rinti and Aloe Eumpuek prospect areas
(Figure 2). Within Rek Rinti, Phase 2 work has focused on detailed drilling within the Agam zone.
FAR EAST GOLD ASX ANNOUNCEMENT
7
JUNE QUARTERLY EXPLORATION UPDATE
31 JULY 2023
Figure 2: Map shows location of Woyla project in Aceh Province, North Sumatra and the locations of epithermal quartz vein
systems and porphyry prospect at Beurieung are indicated. The location of the new vein discovery at the Kareung Reuboeh
prospect south of Aloe Eumpuek is also indicated. Historical rock sample locations and reported assays are shown as is the
interpreted extent of the Sumatra Fault Zone (SFZ). Quarter 2 exploration has focused within the Rek Rinti and Aloe Eumpuek
prospect areas.
Rek Rinti - Agam Zone Drill Program
The Rek Rinti vein system is comprised of 8 individual quartz veins ranging from 0.7m to 20m in width.
The veins are structurally-controlled with a dominant northeast orientation and can be traced at surface
for up to 250m in length. The quartz veins are mostly chalcedonic with distinct colloform-crustiform
banded textures including sulphide-rich ginguro bands. The veins also contain intergrowths of adularia
and are intercalated with massive black manganese near surface.
FAR EAST GOLD ASX ANNOUNCEMENT
8
JUNE QUARTERLY EXPLORATION UPDATE
31 JULY 2023
To date, the Phase 2 drill program at Rek Rinti has focused on detailed drilling at the Agam vein zone
(Figure 3). Nineteen holes (AGM001-AGM019) were completed for a total of 4,171.3m. Hole AGM014R
was a redrill of AGM014 to improve recovery through a section of extremely broken core. Table 2 below
lists details for the completed drill holes and Figures 3 to 5 show the location of AGM completed holes
and current interpretation. The AGM holes were drilled at 50m spaced sites centered around the Phase
1 drill hole RRD004 which intersected 3.43 g/t AuEq over 30 meters, including 8.98 g/t AuEq over 8.1
meters (at 108.6m depth). The high-grade mineralization is associated with ginguro-banded quartz
containing fine-grained electrum and Ag-rich sulphide minerals.
During Quarter 2 the Company received assays for drillholes AGM011 to AGM017. Details and compiled
significant assays for holes AGM001-AGM010 were released in the Company’s Quarter 1 Report of
Activities released on 28 April 2023. Compiled significant assay intersections received during Quarter 2
are listed in Table 4 and include:
•
1m of 7.96g/t AuEq in AGM012 (69m-70m)
•
3.3m of 4g/t AuEq in AGM013 (164m-167.3m), including 14.19g/t AuEq over 0.5m (164.5m165m). Hole AGM013 was drilled 25m southwest along vein trend from RRD04.
•
0.5m of 4.63g/t AuEq in AGM014(112m-112.5m).
Table 2: Details of completed AGM drillholes. UTM WGS 84 – Zone 47N
FAR EAST GOLD ASX ANNOUNCEMENT
9
JUNE QUARTERLY EXPLORATION UPDATE
31 JULY 2023
The AGM holes completed have confirmed lateral and vertical continuity of the Agam vein zone over
200m along an apparent east-west zone trend. High grade mineralisation occurs within narrow zones of
quartz veins showing ginguro-type banding and drilling suggests that the east-west structural trend is
host to the wide mineralized quartz zone intersected in hole RRD004. The intermedial east-west trending
vein/breccia zone occurs within the overall northeast-trending Agam zone. This would be consistent with
structural models related to strike-slip fault systems indicating the formation of sigmoidal veins forming
intermedial to the trend of the primary faults. Such veins are also the site is significant dilation and can
be preferred locations for mineralisation. An interpreted schematic representation of the Agam zone is
provided in Figure 6.
Figure 3: Plan map showing the surface extent of the Agam zone quartz veins (yellow). Completed drilling indicates
the occurrence of an east-west oriented intermedial sigmoidal vein zone situated between the interpreted Agam
zone boundary faults and the northeast-trending quartz veins. (Figure 4). Additional scout drill holes RRD014 –
RRD016 are shown to the west of the Agam zone.
FAR EAST GOLD ASX ANNOUNCEMENT
10
JUNE QUARTERLY EXPLORATION UPDATE
31 JULY 2023
Figure 4: Plan map showing the surface extent of the Agam zone quartz veins (yellow). Completed drilling indicates
the occurrence of an east-west oriented intermedial sigmoidal vein zone situated between the interpreted Agam
zone boundary faults and the northeast-trending quartz veins. Such structures could be important controls to high
grade mineralisation found within areas of local vein dilation (eg. RRD004). Refer to Figure 5 for a schematic
representation looking northeast along strike.
FAR EAST GOLD ASX ANNOUNCEMENT
11
JUNE QUARTERLY EXPLORATION UPDATE
31 JULY 2023
Figure 5: Interpretive cross section of the first completed drill section across the Agam Zone. The zone is
characterised by hangingwall and footwall faults at zone boundary with outer quartz stock vein zones and central
zone of massive quartz and quartz breccia. The best developed (and highest grade) mineralization occurs within
the central breccia zone and zones of massive quartz contained therein. The cross section will be revised as more
holes are drilled. Refer to Table 4 for compiled assay results from AGM holes.
The Company also completed additional scout drill holes to test the Rame vein northwest of the Agam
zone. See Figure 3. Three holes were completed (RRD014-RRD016) to test vein targets beneath an
area of artisanal mining. The holes intersected a narrow zone of Ag-rich mineralization (up to 618 ppm
Ag) within the quartz vein. Refer to Table 3 for significant compiled assay results.
FAR EAST GOLD ASX ANNOUNCEMENT
12
JUNE QUARTERLY EXPLORATION UPDATE
31 JULY 2023
Table 3: Summary of compiled significant assays for drillholes RRD014-RRD016 that tested a part of the Rame vein.
Intersection intervals are reported in meters and zone widths are reported as intersected downhole. Refer to Figure 3 for hole
locations. Significant intersections were compiled using 0.2g/t Au cut-off with no more than 1m of consecutive internal dilution
(below-cut off) included. No top cut of gold assays has been applied. Au Equivalent is based on USD$1,800/oz gold and
USD$22/oz silver (Au g/t +(Ag g/t * 0.012)).
Only 3 of the 8 known vein systems within the Rek Rinti systems have been effectively drill tested.
The results to date confirm that high-grade Au-Ag mineralisation developed over significant
width. The Company will continue to drill test priority vein targets.
FAR EAST GOLD ASX ANNOUNCEMENT
13
JUNE QUARTERLY EXPLORATION UPDATE
31 JULY 2023
Table 4: Above and Below. Summary of Agam vein zone compiled significant assay results for drillholes AGM011 to AGM017.
For compiled significant assays of holes AGM001-AGM010 see the Company’s ASX announcement dated 28 April 2023.
Intersection intervals are reported in meters and zone widths are reported as intersected downhole. Refer to Figure 6 for hole
locations. Significant intersections were compiled using 0.2g/t Au cut-off with no more than 1m of consecutive internal dilution
(below-cut off) included. No top cut of gold assays has been applied. Au Equivalent is based on USD$1,800/oz gold and
USD$22/oz silver (Au g/t +(Ag g/t * 0.012)).
FAR EAST GOLD ASX ANNOUNCEMENT
14
JUNE QUARTERLY EXPLORATION UPDATE
31 JULY 2023
FAR EAST GOLD ASX ANNOUNCEMENT
15
JUNE QUARTERLY EXPLORATION UPDATE
31 JULY 2023
Aloe Eumpuek Prospect
As part of the Phase 2 scout drill program the Company is conducting initial drilling of the Aloe Eumpuek
prospect located about 1.5km to the south of Rek Rinti (Figure 6). Previous exploration by Barrick in 1997
indicated the occurrence of 2 northwest trending quartz veins. Sampling of the veins by the Company from
surface quartz vein rubble within artisanal mining pits displayed well developed ginguro banding and
visible gold. (See the Company’s ASX releases dated 28 April 2023 and 1 May 2023 for additional
details).
To date a total of 21 diamond drill holes (2,435.9m) have been completed (Figure 7) and hole details are
listed in Table 5. Assays have been received for hole AED001 to AED018 and compiled significant
intersections are listed in Table 6. The Company previously reported assay results for hole AED002 (see
ASX release dated 1 May 2023) which returned up to 18.46 g/t Au and 1,539 g/t Ag over a 1 metre interval
from 74.5m. Fine-grained disseminated visible gold/ electrum were observed in drill core associated with the
sulphide-rich ginguro bands.
FAR EAST GOLD ASX ANNOUNCEMENT
16
JUNE QUARTERLY EXPLORATION UPDATE
31 JULY 2023
Interpreted
structural jog
and potential
dilation zone.
Figure 6: Plan map showing the interpreted surface extents of the Rek Rinti vein system and Agam zone and the
Aloe Eumpeuk prospect area immediately south. Previous exploration by Barrick indicated the occurrence of 2
northwest trending quartz veins. The structural framework is consistent with the veins forming within a dilational jog.
Such jogs are favourable zones for development of high-grade veins.
Initial drilling of quartz veins at the Aloe Eumpuek prospect continued during Quarter 2 a total of 21 holes
(AED001-AED021) totaling 2,435.9m completed. The program is testing the Meuh and Awai quartz
veins over a lateral distance of approximately 500m and to about 150m vertical depth.
The drilling has confirmed the occurrence of the veins where drilled and has indicated continuity of a
narrow zone of high-grade Au-Ag in the Meuh vein over a lateral distance of 150m. Assays were received
for holes AED-01 to AED018 during the Quarter and are listed in Table 6.
Compiled significant intercepts from Aloe Eumpuek (see the Company’s ASX May 1, 2023) include:
•
AED002: 1m at 34.77g/t AuEq (75.4m – 76.4m), 1m at 20.44 g/t AuEq (78.5m –
79.5m) and 1m at 12.95 g/t AuEq (86m – 87m)
•
AED007: 1.85m at 9.48g/t AuEq (108.9m-110.8m)
•
AED008: 1m at 13.36g/t AuEq (101.6m-102.6m)
FAR EAST GOLD ASX ANNOUNCEMENT
17
JUNE QUARTERLY EXPLORATION UPDATE
31 JULY 2023
•
AED011: 6.3m at 5.4g/t AuEq (102.6m-108.9) that includes 3.2m at 8.8g/t AuEq
(102.6m-105.8m).
•
AED014 – 3.4m at 2.11 g/t Au and 282.4 g/t Ag from 56.5m – 59.9m including 0.6m at
6.39 g/t Au and 297 g/t Ag (9.95 g/t AuEq) from 58.5m
•
AED015 – 8.4m at 0.86 g/t Au and 59.61 g/t Ag from 48m – 56.4m including 0.6m at
5.53 g/t Au and 176 g/t Ag (7.64 g/t AuEq) from 52.4m
•
AED017 – 1.7m at 0.49 g.t Au and 8.78 g/t Ag from 28.3m – 30m including 0.5m at
5.69 g/t Au and 106 g/t Ag (6.97 g/t AuEq) from 32m
•
AED018 – 6.8m at 3.5 g/t Au and 113.97 g/t Ag from 65.2m – 68.9m including 1m at
17.6 g/t Au and 160 g/t Ag (19.52 g/t AuEq) from 65.2m
Figure 7: Plan map showing the extent of the Aloe Eumpuek veins. Assay results to date indicate a zone of highgrade gold and silver over a distance of 150m within the Meuh vein. The high-grade zone remains open to the
north and south. Planned holes are indicated in blue. Refer to Table 5 for current assay results.
FAR EAST GOLD ASX ANNOUNCEMENT
18
JUNE QUARTERLY EXPLORATION UPDATE
31 JULY 2023
Drill hole AED002 intersected the hanging wall quartz vein within the Meuh vein zone from 75.4m to
87.1m. The vein is comprised of massive crystalline to colloform-crustiform banded quartz containing
distinct ginguro banding with fine-grained disseminated gold and electrum (Figure 8).
Two cavity zones with no core recovery intersected. These include a 1.3m cavity from 77m to 78.3m and
a 3.6m wide cavity from 82.4m to 86 m. The presence of wood fragments within the cavities suggests
they are historical artisanal mining shafts and infers that the hanging wall quartz vein occurs over the
entire drilled width of 11.6m. An interpreted drillhole cross section is shown in Figure 9.
Table 5: Details of completed AED drillholes. UTM WGS 84 – Zone 47N.
FAR EAST GOLD ASX ANNOUNCEMENT
19
JUNE QUARTERLY EXPLORATION UPDATE
31 JULY 2023
Figure 8: Photos of cut drill core specimens from drillhole AED002 (see Figure 7). The section shows the occurrence of darkgrey ginguro bands with fine-grain electrum and sulphide minerals. Photo A-75.7m, B-75.9m, C-78.6m. The sections containing
these samples assayed, 1m at 18.46 g/t Au and 1,359 g/t Ag (34.77 g/t AuEq) from 75.4m – 76.4m and 1m at 12.94 g/t Au and
625 g/t Ag (20.44 g/t AuEq) from 78.5m – 79.5m.
FAR EAST GOLD ASX ANNOUNCEMENT
20
JUNE QUARTERLY EXPLORATION UPDATE
31 JULY 2023
Figure 9: Interpreted cross section for hole AED002 section with compiled significant assays (refer to Table 6 below). Figure
shows occurrence of high-grade Au-Ag within 2 zones within the Meuh vein. Continuous core sampling through the zones was
not possible due to the presence of historical artisanal mining shafts. Photos of cut drill core specimens from drillhole AED002
are shown in Figure 8. Drill hole AED001 was terminated after intersecting a cavity from an artisanal mine shaft.
FAR EAST GOLD ASX ANNOUNCEMENT
21
JUNE QUARTERLY EXPLORATION UPDATE
31 JULY 2023
FAR EAST GOLD ASX ANNOUNCEMENT
22
JUNE QUARTERLY EXPLORATION UPDATE
31 JULY 2023
FAR EAST GOLD ASX ANNOUNCEMENT
23
JUNE QUARTERLY EXPLORATION UPDATE
31 JULY 2023
Table 6: Compiled significant assay results for drillholes AED001 to AED018. Intersection intervals are reported in
meters and widths are reported as intersected downhole. Refer to Figure 7 for hole locations. Significant
intersections were compiled using 0.2g/t Au cut-off with no more than 1m of consecutive internal dilution (below
cut-off) included. No top cut of gold assays has been applied. Au Equivalent is based on USD$1,800/oz gold and
USD$22/oz silver (Au g/t +(Ag g/t * 0.012)).
The Company believes that the textures seen within the Aloe Eumpuek veins suggest that the
system has the potential to contain wider and higher grade zones of Au-Ag mineralization. The
high-grade mineralization identified in the current drill program remains open along strike.
Woyla Project - New Target Delineation
In tandem with the Phase 2 drill program the Company also continued to expand its surface mapping and
sampling program during Quarter 2. This work was focused within the Rek Rinti, Aloe Eumpuek, Aloe
Rek prospect areas (Figures 10 to 12).
The importance of this activity is recent detailed mapping and rock sampling at the new Kareung Reuboeh
(KR) prospect approximately 1.5km south of Aloe Eumpeuk (Figure 10) has discovered a wide zone of
quartz veins and breccia for which assay results indicate significant Au concentration. The massive quartz
veins are 2m and 3m in width and occur with an up to 9m wide zone of quartz stockwork veins. The
apparent total zone width is about 15m and current mapping indicates it extends for at least 500m along
strike.
FAR EAST GOLD ASX ANNOUNCEMENT
24
JUNE QUARTERLY EXPLORATION UPDATE
31 JULY 2023
The veins and stockwork occur within the same interpreted structural corridor tha
Share your feedback
Discover