Far East Gold Ltd (‘FEG’ or ‘the ‘’Company’) is pleased to report results from a productive quarter of exploration
activity. Work focused on the Idenburg project in Papua, Indonesia where resource expansion drilling was active at
the Sua and North Bermol prospects and detailed mapping and surface rock sampling were completed across the
property. The Company also completed initial drilling at the Mount Clark West tenement in Queensland, Australia
to test defined geophysical targets.
INDONESIAN HIGHLIGHTS:
- Upaya Pengelolaan Lingkungan – Upaya Pemantauan Lingkungan (UKL-UPL) environmental was granted to
the Company for advanced exploration activities. This approval allows FEG to advance drilling within its priority
strategic corridor providing a significant regulatory milestone that supports accelerated exploration activities.
Refer to Company ASX Announcement 17 March 20261.
- This (UKL-UPL) recommendation is a mandatory prerequisite to formally apply for the Persetujuan Penggunaan
Kawasan Hutan (PPKH) (or "Borrow-Use") for the approved area contained in the UKL-UPL with the Ministry of
Environment and Forestry. Securing this regional endorsement is the final step required to lodge the PPKH and
will allow the Company to continue its pathway to development of the Idenburg project.
- Metallurgical Testing at Sua Prospect - The Company has received preliminary metallurgical test results for 3
drill core composite samples. Diagnostic leach analysis confirm that the gold is predominantly present as free
milling, cyanide recoverable gold. Total gold recoveries of 94–96% were achieved, with Gravity Recoverable
Gold (GRG) exceeding 50%, indicating a simple and potentially low-cost processing pathway. Refer to the
Company Announcement 21 April 20262.
Higher Grades and Zone Extensions at the Sua Prospect
8 holes (KSD032-040) for a total of 2,289m were drilled during the Quarter. The holes were planned to test depth
and lateral extensions of defined gold mineralized zones. The results confirmed zone continuity to depth and the
presence of high-gradegoldassociated withrare coarse visible gold. Assay results received during the Quarter for
holes KSD027 to 039 indicate the potential to significantly expand the current resource estimate at Sua. Refer to
Company ASX announcements of 24 November, 20253, and 16 December, 20254, 10 November 20255, 12
January 20266. The Company is progressing an updated Mineral Resource Estimate.
Compiled significant intercepts include:
➢ 49.47 g/t Au over 4.85m (73.85m to 78.7m) incl:
- 62.12 g/t Au over 3.85m (from 73.85m)
- 93 g/t Au over 1.0m (from 74.5m) and
- 175 g/t Au over 0.55m (from 77.15m) in KSD027
➢ 10.29 g/t Au over 1.65m (17.1 to 18.75m) and
- 8.55 g/t Au over 1m (97.2m to 98.2m) in KSD033
➢ 7.92 g/t Au over 1m (178m to 179m) in KSD034
➢ 5.24 g/t Au over 1.45m (142.75m to 144.2m) in KSD035
The high-grade gold zones remain open down-dip and along strike to the northeast. Mineralisation at Sua is hosted
within a series of stacked milky-quartz ± sulphide veins in which more than 30 individual gold-bearing quartz veins
have been identified.
The Sua vein system occurs within the 5km long Sua–Afley shear zone and infers significant potential for additional
high-grade discoveries. A review and discussion of historical exploration and assessment of resource potential can
be found in the Company’s ASX announcement of 21 August, 20247.
DrillingProgramatNorth BermolhasDiscovered Extensive Near Surface GoldMineralisation
• ToQuarterendanadditional7holes(BND019-025)foratotalof569.8mweredrilled.The initial drill program
at North Bermol is now complete with a total of 25 holes for 1,530.7m drilled. All assays have been
received. The holes tested a low angle thrust fault/shear plane that shows intense ductile deformation
withassociated quartzveins and pyrite mineralisation. Assays received suggest that highergrades ofgold
ASX ANNOUNCEMENT -
MARCH2026QUARTERLY EXPLORATION UPDATE
3
FAREASTGOLDASX ANNOUNCEMENT
mineralisation correlate with greater abundance of pyrite. Both quartz veins and pyrite mineralisation
reflect multistage development associated with intense deformation. Refer to Company ASX
announcement of 28 October, 20258.
• Basedonthe drill resultsthe North Bermol shear zone is abroad, near surface, shallow dipping (15°) plane
thatstrikesanddipstothe northeast. The thrust planehas beenintersectedtoadepth of about135mand
hasanapparent truethickness of 0.5-8 meters.3D modelingof currentdrill results suggest that the shear
plane is at least 300m across (to NW) and has a strike length of about 1,500m (to NE). The thrust plane
remains open along strike and to the west.
Compiled significant intercepts included:
➢ 1.45 g/t Au over 0.45m (35.05m to 35.5m) in BND019
➢ 1.36 g/t Au over 4.60m (71.4m to 76m) incl
- 3.12 g/t Au over 1m(74.5m to 75.5m) in BND023
➢ 5.58 g/t Au over 0.4m (130.6m to 131m) in BND024
AUSTRALIAN HIGHLIGHTS:
- Drilling at the Company’sMount Clark Project commenced inlate 2025. Refer ASX Announcement 7 Nov 20259
and 10 February 202610.
Observations from the current program are consistent with the intersection of the upper and peripheral zones of
a potentially significant Cu mineralised porphyry system. Assay results are currently in progress.
Observed features include:
➢ Widespread alteration including propylitic and phyllic alteration.
➢ Quartz veining and brecciation.
➢ Disseminated sulphides, See Figure 9.
- The Company received formal confirmation from the Queensland Department of Natural Resources and Mines,
Manufacturing and Regional and Rural Development, that EPM 26008 (Mount Clark West) has been extended
until February 2031, with the statutory relinquishment requirement deferred until February 2030. This is a
supportive regulatory outcome from the Queensland Government. Refer the Company’s ASX Announcement 10
February 202610
Managing Director &CEOShane Menere said:
“I am pleased to report a highly productive quarter for Far East Gold, underpinned by continued strong momentum
at our flagship Idenburg Project. Ongoing drilling across Sua and North Bermol continues to confirm the scale,
continuity and grade of the system, while the Kwaplu potential high grade zone presents clear near term opportunity
for further resource growth as results are received and drilling progresses.
Importantly, recent metallurgical results at Sua indicate high gold recoveries with a significant gravity component,
supporting the view that Idenburg may benefit from a relatively straightforward processing pathway. Combined with
the strength of our geological results, this continues to reinforce our confidence in the broader potential of the
project.
During the quarter, we also achieved key permitting milestones, including the granting of the UKL-UPL
environmentalapprovaladdedtothePIPPIBforestrydowngradereclassificationoverapproximately9,000hectares
to Production Forest. These outcomes provide a clear and supportive regulatory framework for ongoing exploration
and future development activities. We are also encouraged by the strong alignment with both government and local
communities, who recognise the potential for the project to deliver meaningful long term economic and social
benefits to the region.
ASX ANNOUNCEMENT -
MARCH2026QUARTERLY EXPLORATION UPDATE
4
FAREASTGOLDASX ANNOUNCEMENT
Idenburg is increasingly demonstrating the characteristics of asignificant gold system, and the Company is working
toward an updated Mineral Resource estimate in the near term. Based on the scale of mineralisation observed to
date and the growing number of defined structural targets across the project, we consider that the broader
exploration potential remains substantial.
With these developments, Far East Gold is positioning itself beyond a pure exploration focus, with Idenburg
providing a clear pathway toward development activities, supported by permitting progress, technical results and
ongoing work programs. At the same time, the Company continues to receive inbound interest from a range of
parties in relation to its asset portfolio, reflecting the quality and growing recognition of the underlying projects.
With multiple workstreams advancing in parallel, we believe the Company is well placed to deliver continued
progress and build value as we advance our projects in a disciplined and responsible manner.”
Figure 1: Map showinglocation ofFEG projects inIndonesia and Australia
INDONESIAN PROJECT ACTIVITIES
IDENBURGGOLDPROJECT -WEST PAPUAPROVINCE,INDONESIA
Idenburg is a95,280 Ha 6th generation CoW located inthe same province hostingworld class multi-million-ounce
gold and copper deposits including Grasberg (+70 Moz Au), Porgera (+20 Moz Au), Frieda River (20 Moz Au) and
Ok Tedi (20 Moz Au). It is an advanced project with over US$25M in historical exploration including over 5,531
meters of diamond drilling. Of the 14 prospect areas identified only 5 prospects have been drilltested, with 3 main
prospects currently host to a JORC inferred mineral resource of 540,000 0z Au at 4.1 g/t Au (see Table 7). The
mineralized zones intersected at each of the three prospects remain open along strike and to depth. Only 30% of
the CoW has been explored in detail. SMG Consulting (SMGC) reported Exploration Targets for all 14 prospects
identified (at the time) within the Idenburg CoW area of circa 7.2Moz at 6.1gpt. The Company has since identified
an additional 15 target prospect areas and continues to develop exploration and mapping plans across the 29
total identified prospects and areas of interest.
ASX ANNOUNCEMENT -
MARCH2026QUARTERLY EXPLORATION UPDATE
5
FAREASTGOLDASX ANNOUNCEMENT
On 11 March 2026, the Company (Fareast Gold/FEG) received environmental approval for advanced exploration
activitiesatIdenburg.ThislandmarkapprovalremovedakeyregulatoryhurdleandallowsFEGtoacceleratedrillingwithin
itsprioritystrategiccorridor—markingthefirsttimetheIndonesianGovernmenthasgrantedsuchauthorityoverthishighly
prospective area. PIPPIB approval allowing for reclassification of 8,950 Ha of forest area toProduction Forest was
received in December 2025 which opensthepathwaytoenvironmentalpermitting,operationallicensingandfuture
minedevelopment. Refer to Figure 2 and ASX Announcement 17 March 20261.
Figure2: Map showingprospect and resourceareas withintheIdenburgCOWtenement.TheareasofannouncedPIPPIBforest
reclassificationarealsoindicated.RefertoAppendix1Table1fordetailsoftheJORC2012InferredMineralResourceEstimatefor
IdenburgascompletedbySMGC.CoordinatesarereferencedtodatumWGS84,zone54south.
Sua Prospect Area – Resource Expansion Drill Program
To end of the Quarter, 18 holes (KSD023 to 040) for 4,125m were drilled by the Company at the Sua prospect. Refer to Table 1.
The drill program had the objective of expanding the current Sua JORC 2012 inferred resource laterally along strike and to depth
testing the host shear zones down dip. The programconfirmed the occurrence of high-grade gold zones intersected by historical
drilling and also extension of the zones to depth and along strike. Importantly, the results indicate the potential for higher grade
gold mineralisation and the presence of coarse gold at depth. Given the success of the initial drill program the Company is
planningforfurtherdrillingwithintheSuaprospectarea. RefertoFigure3andtheCompany’sASXannouncementsof12January
20266 and 10 March 202611. Compiled significant assay intersections are listed in Table 2. Assays are pending from
holeKSD040.
ASX ANNOUNCEMENT -
MARCH2026QUARTERLY EXPLORATION UPDATE
6
FAREASTGOLDASX ANNOUNCEMENT
Figure 3: Map imageshowing the Sua prospect areaand the locations ofcompleted FEG drillholes (KSD023 to 040). Assays have been
received for FEG holes KSD023-039. Table 1 lists hole collar details for the FEG holes completed and Table 2 lists compiled significant
intersections for holes KSD023-039. Coordinates are referenced to datum WGS84, zone 54 south. A review and discussion of historical
explorationandassessmentofresource potentialcanbe foundinthe CompanyASXannouncementof21 August2024 7.
High grade gold mineralisation is associated with intense multiphase deformation, quartz veins and what appear to
be a late-stage, overprint of coarse pyrite. Numerous zones remain open to depth and laterally. Importantly the
high gold grades come from mineralized zones that show little or no supergene alteration and are associated with
very low arsenic (As) concentration (<100ppm).
FEG’s Idenburg Project hosts a JORC (2012) inferred Mineral Resource estimate of approximately 540,000 oz Au,
at an average grade of 4.1 g/t Au including an estimated 296,000 oz Au at an average grade of 3.7 g/t Au within
the Sua Prospect (see Table 7). Refer to ASX announcement of 16 December 20244 and Table 7.
ASX ANNOUNCEMENT -
MARCH2026QUARTERLY EXPLORATION UPDATE
7
FAREASTGOLDASX ANNOUNCEMENT
Table1: CollardetailsforcompletedFEGdrillholesat Sua.HolecoordinatesareinmetersandconformtotheWGS84/UTMZone54S reference
system.
Figure 4: Above: Interpreted long section(looking Northwest)showing the trace ofFEG holes KSD023to 035and historical holes. Refer to
Figure 2 and Tables 1 and 2. The holes tested a series of stacked mineralized zones along the length of the Sua prospect area. Assays are
pending for hole KSD040. The collars for holes KSD025-026 were located at a higher elevation than the section profile and have been
projected onto the section. Refer to ASX announcement of March 10, 2026 11, Coordinates are referenced to datum WGS84, zone 54
south.
ASX ANNOUNCEMENT -
MARCH2026QUARTERLY EXPLORATION UPDATE
8
FAREASTGOLDASX ANNOUNCEMENT
Table 2 below: Compiled significant intersections from FEG drillholes KSD027to KSD039. Intersections were compiled using a 0.2 g/t Au
cut-offwithnogradetopcut, and amaximumof3metersofinternaldilution.RefertoTable 1forholecollardetails. Assaysarepending for
hole KSD040.
ASX ANNOUNCEMENT -
MARCH2026QUARTERLY EXPLORATION UPDATE
9
FAREASTGOLDASX ANNOUNCEMENT
Sua Metallurgical Test Results
The Company completed metallurgical testing of 3 composite samples of Sua drill core. Three composite
samples were tested, 1) a low-grade (LG) sample with 1.1 g/t Au, 2) a high-grade (HG) sample with 39.8 g/t Au,
and 3) an average grade (AG) sample with 3.7 g/t Au which is the average grade of the inferred JORC 2012 Sua
resource as estimated by SMGC. Refer to ASX announcement of 16 December 20244. See Table 7.
The metallurgical test results indicate high gold recovery for all sample types and across all test conditions, with
total gold recovery achieving approximately 95%. Diagnostic leach test results indicate that gold in the AG, HG
and LG samples is predominantly present as free cyanide recoverable gold, with 94-96% of the gold readily
amenable to cyanidation for the samples tested. See Figure 5. This supports a conventional Carbon-in-Leach
(CIL) process flowsheet. Bench-scale Knelson Gravity Recoverable Gold (GRG) recoveries exceeded 50% for the
HG and LGsamplestested. The results also indicate low grades of arsenic (As) and other deleterious elements,
subject to further test work. Refer to ASX announcement of 21 April, 20262.
The results are preliminary in nature and are based on limited composite samples. Furthermetallurgicaltestwork
will be required as the resource is further defined to confirm processing routes, recoveries and reagent
consumption assumptions.
Figure5:Above:DiagnosticleachingresultsindicatethatgoldinbothAGandLGsamplesispredominantlypresentasfreecyanide-able
gold,withover90%ofthegoldreadilyamenabletocyanidation
Cautionary Statement: The metallurgical test results reported in this announcement do not imply that an Ore
Reserve has been established and does not constitute a development or production decision.
ASX ANNOUNCEMENT -
MARCH2026QUARTERLY EXPLORATION UPDATE
10
FAREASTGOLDASX ANNOUNCEMENT
Bermol DistrictDrilling Update:
Drilling during the Quarter focused within the North Bermol prospect area which was a new discovery identified through
detailed mapping and surface rock sampling. Refer to ASX announcement of 28 October, 20258. To Quarter end and
additional7holesforatotalof569.8mdrilled. The initial drill program at North Bermol is now completed with a total
of 25 holes for 1,530.7m drilled. All assays have been received. Based on results, gold mineralisation at North
Bermolis hosted withinabroad, shallow dipping(15°) shear plane that strikes tothe northwest and dips tothe northeast.
The shear zone has been intersected toadepth of about 30mand has anapparent true thickness of 2-6 meters. 3D
modelling of current drill results suggest that the shear plane has a minimumstrike extent (toNW) of 300m and a dip extent
(toNE) ofabout350m.Refer to Figure 6. Asummary ofcompletedholes is provided inTable 3 andcompiled significant
intersections of drill hole assays are shown in Table 4 and Figure 7.
Figure6:Above: NorthBermolprospectmapshowinglocations ofcompletedandplanned(italics)drillholes. RefertoTable3for
completed holecoordinates.TheinterpretedEasternmarginoftheNorthBermolshearzoneisshowninorange. Mapcoordinates
conformtothe WGS84/UTMZone54Sreferencesystem.
ASX ANNOUNCEMENT -
MARCH2026QUARTERLY EXPLORATION UPDATE
11
FAREASTGOLDASX ANNOUNCEMENT
Table3:Below:Collardetailsfor FEGdrillholescompletedatNorthBermolduringtheQuarter.Holecoordinatesareinmetersandconform
totheWGS84/ UTM Zone 54S reference system. Compiled significant assay intersections are provided in Table 4.
ASX ANNOUNCEMENT -
MARCH2026QUARTERLY EXPLORATION UPDATE
12
FAREASTGOLDASX ANNOUNCEMENT
Table 4: Below: Compiled significant intersections from FEG drillholes BND018 to BND025. Holes BND019-025 were completed during the
reportingQuarter. Intersections were compiled using a 0.2 g/t Au cut-offwithnogradetop cut. Amaximumof3meters ofinternaldilution
wasincluded.RefertoTable3forBND holecollardetails.
Figure 7: Above: Longsection(lookingnorthwest)throughtheNorthBermolprospect area. Refer toFigure 2for holelocations and legend details.
Tables 3and 4provide collardetailsand compiledsignificant intersections for allcompleteddrillholes.
The drill results from the North Bermol prospect area confirm the exploration and resource potential remaining in
the Bermol district. The Company is confident that the current program of detailed field mapping and surface rock
sampling will identify new areas of gold mineralisation and targets to drill test.
ASX ANNOUNCEMENT -
MARCH2026QUARTERLY EXPLORATION UPDATE
13
FAREASTGOLDASX ANNOUNCEMENT
WOYLAPROJECT –ACEH PROVINCE, INDONESIA
The Company’s Woyla Copper Gold Project is a 24,260-ha 6th generation Contract of Work (COW) located in
the Aceh region of North Sumatra, Indonesia (Figure 1). FEG holds a 51% interest in the project. Refer to
Company ASX announcement of 7 April 202612.
The Company has prepared a long-term project plan for Woyla as requested by ESDM which will enable the
Company to extend the exploration permit for the COW. There was no exploration activities completed during
the March 2026 Quarter.
TRENGGALEKCOPPER-GOLDPROJECT–CENTRALJAVA,INDONESIA
The Company continues to engage with local communities about the timing of the planned Phase 1 drill
program. There was no exploration activities completed during the March 2026 Quarter.
WONOGIRICOPPER-GOLDPROJECT –CENTRAL JAVA, INDONESIA
During the quarter, the Company continued its regular engagement with the Mining Department (ESDM) to
address administrative and regulatory matters relating to the IUP Exploration permit, with the objective of
progressing the permit’s status in accordance with the prevailing regulatory framework. There was no
exploration activities completed during the March 2026 quarter.
ASX ANNOUNCEMENT -
MARCH2026QUARTERLY EXPLORATION UPDATE
14
FAREASTGOLDASX ANNOUNCEMENT
AUSTRALIA PROJECT ACTIVITIES
BLUE HILL CREEK PROJECT – QUEENSLAND
TherewerenoexplorationactivitiescompletedduringtheMarch2026quarter.
MOUNT CLARK WEST PROJECT – QUEENSLAND
Initial FEG drilling commenced November 4, 2025. Three drill holes were completed for a total of 1,229.3
meters (Figure 7). The holes were drilled using reverse-circulation (RC) and diamond drilling methods. The
holes were located totest defined geophysical targets suggesting potentialforburied porphyry.
Hole MCDD005 was drilled using RC to a depth of 142m and was terminated due to poor ground conditions
downhole. The hole intersectedweakly altered andesite volcanics toend of the hole. Hole MCDD006wasdrilled
to a depth of 516.2m. Drilling encountered altered hydrothermally andesitic volcanics and tuff. The hole
intersected including propylitic and phyllic altered volcanics with intermittent narrow quartz veins with pyrite
and rare, minor chalcopyrite. Variable magnetite enrichmentwas noted associatedwithpropylitic and weakly
development potassic alteration. Hole MCDD007 was RC drilled to a depth of 233m and to a total depth of
571.1musingHQdiamonddrilling. Theholeintersectedawell-developedhydrothermalsystemcharacterized
by propylitic altered volcanic rocks near surface in contact with intensely propylitic and silicified and phyllic
altered felsic intrusive containing pyrite and very minor chalcopyrite. See Figures 8 and 9. Refer to ASX
announcement of 10 February, 202610.
Select intervals from each hole have been submitted to ALS for assay. The results will dictate what further
drilling is necessary at the Mount Clark West project.
ASX ANNOUNCEMENT -
MARCH2026QUARTERLY EXPLORATION UPDATE
15
FAREASTGOLDASX ANNOUNCEMENT
Figure 8 Above: Interpreted RTP magnetic image base with SGC interpreted MIMDAS zones of highchargeability (green) The image shows the occurrence of
3 and possibly 4 low magnetic zones whichrepresent high priority drill targets as potential mineralized porphyry bodies. Survey coordinates conform to the
GDA94, MGA55surveydatum.
Table5:Below.CompletedMCDDDrillHoleLocations
HOLE_ID HOLE_TYPE LOCATION EASTING NORTHING DIP AZM DEPTH
MCDD07 RC/DD MCW 663301.272 7616887.519 -60 268 571.1m
MCDD06 RC/DD MCW 662362.881 7617743.665 -60 180 516.2m
ASX ANNOUNCEMENT -
MARCH2026QUARTERLY EXPLORATION UPDATE
16
FAREASTGOLDASX ANNOUNCEMENT
Figure9:Above: Coretray fromMCDD07showingdrilledinterval317.79to321.13m. Thecoreshowsintensequartz-carbonateveiningwithdisseminatedpyrite
andminorchalcopyrite(<1%) indicativeof porphyry-relatedalteration. Selectedintervalswillbesampledforassay.
Cautionary Statement: Visual estimates of mineral abundance should never be considered a proxy or substitute for
laboratoryanalyseswheremineralconcentrationsor gradesarethefactorofprincipaleconomicinterest.Visualestimates
also provide no information of deleterious physical or chemical properties that may negatively affect the project’s
economic viability and valuation.
TENEMENT SUMMARY
Table6: Below:ListofFEGProjects andstatusattheendofMarch2026Quarter.
The Company did not acquire or dispose of any mining tenements nor change its beneficial interest in the Company’s
Indonesian and Australianprojects duringthe Quarter underreview.
PROJECT LOCATION
MININGLICENCE
TYPE
TENEMENT
AREA
MINERALOGY TYPE
CURRENTPERCENTAGEBENEFICIAL
OWNERSHIP
Woyla
CopperGold
Project
Aceh,
Indonesia
6thGeneration
Contract of Work
24,260 ha Porphyryand Epithermal 51%
Trenggalek
CopperGold
Project
EastJava,
Indonesia
IUP–Operation
andProduction
12,813 ha Porphyryand Epithermal 100%
Wonogiri
CopperGold
Project
CentralJava,
Indonesia
IUP – Exploration 3,928ha Porphyryand Epithermal 100%
Idenburg
Gold
Project
Papua&Papua
Pegunungan,
Indonesia
6th
Generation
ContractofWork
95,280 Orogenic Gold 51% upon issuing the final consideration
shares to the vendor. Ability to increase
to80%upon completionofIndonesian
Govt feasibility study.
MountClark
WestCopper
Gold Project
Connors Arc
Queensland,
Australia
EPM 26008 1,912ha Porphyry 90%
BlueHill
CreekGold
Project
Drummond
Basin
Queensland,
Australia
EPM’s 26217,
27794&28601
8,000ha Epithermal 90%
ASX ANNOUNCEMENT -
MARCH2026QUARTERLY EXPLORATION UPDATE
17
FAREASTGOLDASX ANNOUNCEMENT
SUMMARY OF EXPENDITURE
During the quarter, the Company capitalised total exploration and evaluation expenditure of $533,000, reflecting
costs directly attributable to exploration activities undertaken in Australia and Indonesia.
Capitalised explorationexpenditure1 comprised:
$236,000 relating toexploration support activities and employee costs inIndonesia, and
$297,000 incurred on drilling activities at the Mount Clark West Project, Australia.
In addition, the Company incurred $1.783 million in drilling and associated support costs at the Idenburg Project,
which were expensed through operating cash flows, as detailed in Appendix 5B – Cashflow Report.
Further details of cash movements, including capitalised and expensed exploration costs, are provided in Appendix
5B. No expenditure was incurred on mining, production, or development activities during the reporting period.
PAYMENTS TO RELATED PARTIES AND THEIR ASSOCIATES
Payments to related parties and their associates during the quarter totaled $178,000, as disclosed in Item 6 of
Appendix 5B.
These payments comprised:
$145,000 in salaries and fees paid to Directors, and
$33,000 in employee benefits provided to Managing Director.
All related party payments were made on normal commercial terms and in accordance with remuneration
arrangements.
1 The capitalisation of exploration costs is consistent with the Company’s accounting policy, whereby expenditure is capitalised when it is
considered likely that the costs will be recouped through successful exploration and future development, or where exploration activities are
ongoing.
ASX ANNOUNCEMENT -
MARCH2026QUARTERLY EXPLORATION UPDATE
18
FAREASTGOLDASX ANNOUNCEMENT
ASXAnnouncementsreferenceddirectly, or incommentary of,the Quarterly activity release
1
ASX:FEG17March2026“IdenburgProjectUpdate:UKL-UPL(Environmental)ApprovalGranted”
2
ASX:FEG21April2026“IdenburgUpdate:MetallurgicalTestworkDemonstratesHighGoldRecoveriesatSua”
3
ASX:FEG24November2025“VisibleGoldandBonanzaGradesExtended”
4
ASX:FEG16December2024“AmendedIdenburgAnnouncementandIndependentJORCResourceReport”
5
ASX:FEG10November2025“VisibleGoldandBonanzaGradesIntersectedatIdenburg”
6
ASX:FEG12January2026“SuaProspectFifthConsecutiveHigh-GradeGoldIntercept”
7
ASX:FEG21August2024“IdenburgPTIrianaMutiaraIdenburgExplorationTargetReport,June2024”
8
ASX:FEG28October2025“GoldDiscoveryatNorth Bermol ConfirmsIdenburg’s District-ScalePotential”
9
ASX:FEG7November2025“DrillingCommencedAtMountClarkWest Copper-GoldProject”
10
ASX:FEG10February2026“MountClarkWest:PositiveDrillingObservations,TenementExtensionGranted”
11
ASX:FEG10March2026“High-GradeGoldIntersectionsExtendMineralisationatSua–ResourceUpdatePending”
12
ASX:FEG7April2026“WoylaProjectUpdate”
CompetentPersonandCompliance Statement
The information in this announcement that relates to exploration results is based on and fairly represents
information and supporting documentation prepared, reviewed and approved by Mr Michael C Corey, a
competentpersonwhoisamemberoftheAssociationofProfessionalGeoscientistsofOntario(APGO),Canada.
Mr Michael C Corey is employed on a consulting basis by Far East Gold Limited as the General Manager of
Exploration. Mr Michael C Corey has sufficient experience which is relevant to the style of mineralisation and
typeofdepositsunderconsiderationandtotheactivitybeingundertakentoqualifyasaCompetentPersonas
definedinthe2012editionoftheJORCCode.MrMichaelCCoreyhasprovidedhispriorwrittenconsentastothe
form and context in which the exploration results and the supporting information are presented in this
announcement.
Allinformationcompiledandfootnotedabove1-12relatestoexplorationresultsthathavebeenpreviously
releasedtotheASX.TheCompanyconfirmsthatitisnotawareofanyinformationordatathatmateriallyaffects
the information included in the announcements and that all material assumptions and technical parameters
underpinningtheannouncementscontinuetoapply.TheCompanyconfirmsthattheformandcontextinwhich
the Competent Person’s findings are presented have not been materially modified from the original market
announcements.
ASX ANNOUNCEMENT -
MARCH2026QUARTERLY EXPLORATION UPDATE
19
FAREASTGOLDASX ANNOUNCEMENT
IdenburgMineralResource Estimate
The JORC compliant resource estimates reported in the JORC Resource Report, PT Iriana Mutiara
Idenburg, November 2024’ Company ASX announcement of 16 December 2024 are consistent with the
initial exploration targets determined by SMGC in the June 2024 Exploration Target Report released by
the Company on August 21, 2024.
TheCompanyconfirmsthat itisnotawareofanynewinformation ordatathatmaterially affectstheinformation
included in the Idenburg Mineral Resource estimate and all material assumptions and technical parameters
underpinningthe estimatecontinue toapply and have notmateriallychanged when referringto itsresource
announcement made on 16 December 2024 ‘Amended Idenburg Announcement and Independent JORC Resource
Report”. TheCompanyconfirms thattheCompetent Persons’s findingsarepresented and havenotbeenmaterially
modifiedfromtheoriginalmarketannouncement.
Table7:MineralResourcetable asestimatedbySMGC basedonhistoricalexplorationdatausing acut-offgrade of0.1g/tAuwithnograde
capping applied tothe IMI historical assays
Idenburg Exploration Target
The information referenced in the announcement that relates to the Exploration Target has previously been
releasedontheASX. TheCompanyconfirmsthatit isnotawareof anynewinformation ordata thatmaterially
affects the information included in the report `Idenburg PT Iriana Mutiara Idenburg Exploration Target Report, June
2024’preparedbySMGConsultantsandreleasedby theCompanyon 15August 2024and 21August2024. All
material assumptions and technical parameters underpinning the determinations as stated by SMG Consultan