Far East Gold Ltd (FEG or the Company) is pleased to announce completion of the independent
Idenburg Scoping Study (the Study). The Study centres on Idenburg’s conceptual development
pathway at Sua, supported by high-grade, near-surface mineralisation, conceptual open-pit
potential, strong preliminary metallurgical recoveries, a conventional processing route and close
proximity to the Trans-Irian Highway. It evaluated two conceptual cases - a Sua standalone case
and a staged expansion from Sua into Bermol and North Bermol - while exploration continues
across the wider project.
Sua’s grade-tonnage curve reveals a significant concentration of high-grade gold that supports its
development potential. At a 3.0 g/t Au cut-off, the Sua inferred Mineral Resource Estimate (MRE)
contains approximately 390,000 ounces at an average grade of 9.2 g/t Au. This represents
approximately 76% of Sua's contained gold within approximately 24% of its tonnage.
The Study is a preliminary technical and economic study based on low-level assessments. It is
insufficient to support the estimation of Ore Reserves, provide assurance of an economic
development case or certainty that its conclusions will be realised. Sua hosts an inferred MRE of
5.6 Mt at 2.9 g/t Au for 514,000 ounces. The approximately 390,000 ounce subset at a 3.0 g/t Au
cut-off grade is an unconstrained grade-tonnage presentation of that MRE and is not an Ore
Reserve, a mineable inventory or a production target. As the Study was based wholly on an inferred
MRE, the Study's modelled production targets and forecast financial information are not disclosed.
See the full Cautionary Statement on page 3.
The Study defines the work required to advance Idenburg and supports the Indonesian Feasibility
Study pathway to increase FEG's ownership from 51% to 80%.
SCOPING STUDY AT A GLANCE
HIGH-GRADE GOLD
At a 3.0 g/t Au cut-off, Sua’s grade-tonnage curve
contains ~390,000 oz at an avg. grade of 9.2 g/t Au
MINING AND ACCESS
Near-surface mineralisation; staged conceptual open
pits; Sua ~5 km from the Trans-Irian Highway
DEVELOPMENT CASES
Two development cases: Sua standalone; Sua with
staged expansion into Bermol and North Bermol
RESOURCE BASIS
Independent JORC inferred MREs only; Mafi’s inferred
MRE and all Exploration Targets excluded
OWNERSHIP PATHWAY
Indonesian Feasibility Study work supporting FEG’s
contractual pathway from 51% to 80%
GRADE CONCENTRATION
Approximately 76% of Sua’s contained gold within
24% of its tonnage
RECOVERY AND PROCESSING
Metallurgical tests returned ~95% gold recovery;
Study adopted 92% with conventional gravity-CIL
MODELLING FRAMEWORK
US$3,300/oz; 9% discount rate; ±40% mining-cost
sensitivity; both cases supported progression
RESOURCE DEFINITION PROGRAM
Recommended 73 holes for approximately 6,085m,
targeting greater geological confidence
DISTRICT SCALE
95,280 hectares; Sua can advance while broader
exploration continues
ASX ANNOUNCEMENT
24 AUGUST 2026
I D E N B U R G UP D AT E :
I N D E P E N D E N T S C O P IN G S T U D Y C OM PL E T E D
FAR EAST GOLD ASX ANNOUNCEMENT 2
Figure 1: Exploration drilling at the Sua prospect, Idenburg Gold Project, Papua, Indonesia
HIGHLIGHTS
• At a 3.0 g/t Au cut-off on the Sua grade-tonnage curve, the Sua inferred Mineral Resource
Estimate contains approximately 390,000 ounces at an average grade of 9.2 g/t Au. This
represents approximately 76% of Sua's contained gold within approximately 24% of its
tonnage.
• The independent JORC Mineral Resource Report describes Idenburg as offering near-
surface, high-grade open-pit resources. Historical Sua drilling includes 16 m at 8.49 g/t Au
from surface, including 1 m at 105 g/t Au. The Study establishes a staged conceptual open-
pit pathway, and Sua is approximately 5 km from the Trans-Irian Highway.
• The Study modelled two distinct development cases: Sua standalone and staged expansion
from Sua into Bermol and North Bermol. Both were evaluated at US$3,300/oz and a 9%
discount rate, and both supported progression. The cases used only independently
estimated JORC inferred Mineral Resources; Mafi’s inferred MRE and all Exploration
Targets were excluded.
• Preliminary Sua metallurgical testwork returned approximately 95% gold recovery through
whole-ore CIL and gravity-CIL testing. The Study adopted a more conservative 92%
recovery assumption and a conventional gravity-CIL processing route.
• A recommended 73-hole, approximately 6,085-metre drilling program across Sua, Bermol
and North Bermol is designed to increase geological confidence within and around the
conceptual development areas and test extensions. At Sua, 26 holes for approximately
2,840 metres target the main high-grade corridor and conceptual pit area.
• The Study establishes a pathway from targeted drilling to a potential updated MRE and,
subject to results and further technical work, the next study stage and potential future
disclosure of project economics. This work also supports FEG’s contractual pathway to
increase its ownership from 51% to 80%.
These Highlights should be read together with the Cautionary Statement on page 3.
I D E N B U R G UP D AT E :
I N D E P E N D E N T S C O P IN G S T U D Y C OM PL E T E D
FAR EAST GOLD ASX ANNOUNCEMENT 3
CAUTIONARY STATEMENT
The internal Scoping Study referred to in this announcement is a preliminary technical and
economic study of the potential viability of Idenburg. Its modelling was based solely on the
independently estimated JORC inferred Mineral Resources at Sua, Bermol and North Bermol. It
did not include Mafi’s inferred Mineral Resource or any Exploration Targets. The Study is based on
low-level technical and economic assessments that are insufficient to support the estimation of Ore
Reserves or to provide assurance of an economic development case at this stage. Further
exploration, evaluation work and appropriate studies are required. There is a low level of geological
confidence associated with Inferred Mineral Resources and there is no certainty that further
exploration will result in the determination of Indicated or Measured Mineral Resources.
FEG has determined that it does not presently have a reasonable basis to report the production
targets or forecast financial information derived from the Study for the purposes of ASX Listing
Rules 5.16 and 5.17. This announcement therefore does not disclose the modelled processing rate,
production profile, mine life, capital or operating cost estimates, AISC, NPV, IRR, payback or cash
flow. The statement that the modelling supported progression across the disclosed sensitivity range
is not a disclosure of the Study's financial results and does not provide assurance of economic
development.
The proposed work program is forward-looking and represents a planning framework only. It is not
project guidance or a production target. Its scope, timing and implementation will depend on
exploration and study results, regulatory and land-access approvals, funding and future Board
decisions.
Chief Executive Officer's comments
“This Scoping Study is an important milestone because it has given us a clear starting point
for Idenburg’s conceptual development pathway—and that starting point is Sua.
Sua already hosts an inferred MRE containing 514,000 ounces of gold, including a compelling
high-grade concentration of approximately 390,000 ounces at an average grade of 9.2 g/t Au
based on a 3.0 g/t Au cut-off on the grade-tonnage curve. Combined with near-surface
mineralisation, conceptual open-pit potential, strong preliminary metallurgical recoveries, a
conventional processing route and close proximity to the Trans-Irian Highway, we believe Sua
provides a strong foundation from which to advance the broader Idenburg Gold Project.
The Scoping Study has also defined what we need to do next. Mining One Consultants have
recommended 73 holes for approximately 6,085 metres across Sua, Bermol and North Bermol.
The initial phase would focus on Sua, with 26 holes for approximately 2,840 metres designed
to increase geological confidence within and around the main high-grade corridor and
conceptual pit area, while testing extensions and opportunities for resource growth.
Our objective is for the drilling to support an updated MRE with portions classified as indicated
and potentially measured. If successful, that greater geological confidence, together with
further technical work, would position Idenburg for next-stage evaluation and could provide the
reasonable basis required to disclose project economics.
For us, the Study is not the endpoint—it establishes the development pathway. Importantly,
neither conceptual development case relies on Mafi or any Exploration Targets, while the
broader district-scale Idenburg system retains significant exploration upside.”
Shane Menere, Chief Executive Officer
Please Click this Link to watch the video by CEO Shane Menere: https://fareast.gold/link/rv7WbP
I D E N B U R G UP D AT E :
I N D E P E N D E N T S C O P IN G S T U D Y C OM PL E T E D
FAR EAST GOLD ASX ANNOUNCEMENT 4
IDENBURG SCOPING STUDY
PT Mining One Indonesia (Mining One) has completed an internal Scoping Study for the Idenburg
Gold Project (Idenburg or the Project). The Study identifies the concentration of grade at Sua,
evaluates two conceptual development cases, selects conceptual mining and processing routes
and defines the drilling, engineering and execution work required for the next stage.
The Study was prepared to support internal project planning and the Indonesian Feasibility Study.
Because Idenburg’s current Mineral Resource is classified entirely as inferred, FEG has determined
that it does not presently have a reasonable basis to report the Study’s modelled production targets
or forecast financial information under ASX Listing Rules 5.16 and 5.17. This announcement
instead presents the principal technical and execution findings that support progression of the
Project.
Sua combines near-surface mineralisation and a staged conceptual open-pit design with
preliminary testwork recovery of approximately 95%, a conventional gravity-CIL processing route
and location approximately 5 km from the Trans-Irian Highway.
Figure 2: Technical checks during exploration drilling at the Idenburg Gold Project, Papua, Indonesia.
I D E N B U R G UP D AT E :
I N D E P E N D E N T S C O P IN G S T U D Y C OM PL E T E D
FAR EAST GOLD ASX ANNOUNCEMENT 5
TWO DEVELOPMENT CASES — BOTH SUPPORT PROGRESSION
• Sua standalone case — a conceptual development centred on Sua.
• Sua staged-expansion case — a conceptual development beginning at Sua and expanding
into Bermol and North Bermol.
Both cases were evaluated at US$3,300/oz and a 9% discount rate. Mining costs were tested from
40% below to 40% above the base estimate. Even when modelled mining costs were increased by
40%, both cases still supported progressing the Project. Both relied solely on the independently
estimated JORC inferred MREs at Sua, Bermol and North Bermol; Mafi’s inferred MRE and all
Exploration Targets were excluded. Because those Resources are entirely inferred, the modelled
production targets and financial outcomes are not disclosed.
Sua can therefore progress through resource-definition work and pre-feasibility study (PFS)
readiness work without waiting for the wider tenement to be fully explored. In parallel, systematic
exploration can continue across the 95,280-hectare Contract of Work, seeking to expand the
resource base and add future development options.
STUDY BASIS, SCOPE AND PATHWAY TO 80% OWNERSHIP
FEG holds a 51% interest in PT Iriana Mutiara Idenburg, the holder of the 95,280-hectare Idenburg
Contract of Work. The current Exploration Period under the Contract of Work continues until 27
October 2027, subject to any extension or voluntary suspension. The Project is located in Papua
and Papua Pegunungan Provinces, Indonesia. Under the Conditional Share Purchase Agreement
(CSPA), FEG has a pathway to increase its ownership interest to 80% upon completion and delivery
to the Vendors of an Indonesian Feasibility Study by 31 December 2027. The internal Scoping
Study is intended to underpin a number of the workstreams required for that feasibility study.
The Study was based on the JORC 2012 MRE announced on 5 May 2026. The MRE comprises
7.8 Mt at 3.1 g/t Au for 780,000 ounces of contained gold across Sua, Bermol, North Bermol and
Mafi and is classified entirely as inferred.
The Study is therefore not an assessment of Idenburg's full tenement-wide potential. It establishes
how the Sua-led conceptual development pathway can advance while exploration continues across
the wider mineralised system.
Of the 15 main prospect areas identified across Idenburg, only six have been drill tested and only
four currently host Mineral Resources, comprising the Project’s 780,000-ounce inferred MRE (see
ASX announcement dated 30 July 2026).
Prospect Tonnes (Mt) Au (g/t) Contained Au (koz)
Sua 5.6 2.9 514
Bermol 1.5 4.8 228
North Bermol 0.5 1.2 22
Mafi 0.2 2.9 16
Total 7.8 3.1 780
Table 1: All Mineral Resources are classified as Inferred and were reported at a 0.1 g/t Au cut-off. Mafi was excluded
from the Study modelling. Totals may differ due to rounding. (see ASX announcement dated 5 May 2026).
I D E N B U R G UP D AT E :
I N D E P E N D E N T S C O P IN G S T U D Y C OM PL E T E D
FAR EAST GOLD ASX ANNOUNCEMENT 6
SUA GRADE-TONNAGE DISTRIBUTION
At a 3.0 g/t Au cut-off on the Sua grade-tonnage curve, the Sua inferred MRE contains
approximately 390,000 ounces at an average grade of 9.2 g/t Au. This represents approximately
76% of Sua's contained gold within approximately 24% of its tonnage. The subset sits within Sua's
514,000 ounce inferred MRE and provides a focus for planned resource-definition work. The
concentration remains evident at higher cut-offs: at a 4.0 g/t Au cut-off, the Sua grade-tonnage
curve contains approximately 350,000 ounces at an average grade of 11.5 g/t Au.
The 3.0 g/t Au cut-off grade is one of the cut-off grades presented on the Sua grade-tonnage curve.
It is not the 0.1 g/t Au Mineral Resource reporting cut-off used for the published MRE and is not the
cut-off adopted for the Study's pit optimisation. The curve is an unconstrained grade-tonnage
presentation: it does not apply pit design, mining dilution, ore loss, geotechnical limits, processing
recovery or economic modifying factors. The subset is therefore not an Ore Reserve, mineable
inventory or production target.
Figure 3: Sua grade-tonnage curve reproduced from Figure 6.12 of the independent March 2026 JORC Resource Report
– a full copy of that report is included as Appendix A to this announcement. The 3.0 g/t Cut-off grade row shows 392,996
contained ounces at an average grade of 9.2 g/t Au.
NEAR-SURFACE GOLD AND STAGED OPEN-PIT CONCEPT
The independent March 2026 JORC Resource Report describes Idenburg as offering the
opportunity to develop near-surface, high-grade open-pit resources and confirms that all reported
Mineral Resources are from areas planned for open-cut mining. At Sua, oxidation extends from
near surface to an average depth of approximately 10-20 m, and multiple historical drill holes
intersected mineralisation from surface.
The Sua mineralised system remains open along strike and to depth, with recent mapping at
Kwaplu, approximately one kilometre west of Sua, confirming strike-extension potential along the
Sua–Afley shear zone (see ASX announcement dated 30 July 2026).
I D E N B U R G UP D AT E :
I N D E P E N D E N T S C O P IN G S T U D Y C OM PL E T E D
FAR EAST GOLD ASX ANNOUNCEMENT 7
Selected Sua intersections demonstrate high-grade mineralisation from surface and at shallow
downhole depths:
Hole From Downhole interval Au grade Included high-grade interval
KSD001 Surface 16.0 m 2.38 g/t -
KSD010 Surface 18.0 m 2.05 g/t -
KSD013 Surface 16.0 m 8.49 g/t 1.0 m at 105 g/t Au
KSD023 18.5 m 9.8 m 13.77 g/t 0.8 m at 131 g/t Au
KSD024 23.5 m 35.5 m 8.59 g/t 0.8 m at 252.5 g/t Au
Table 2: Intervals are downhole lengths. The historical KSD001, KSD010 and KSD013 intersections used a 0.5 g/t Au
cut-off, a 41 g/t Au top cut and up to 2m internal waste. The KSD023 and KSD024 intersections used a 0.2 g/t Au cut-
off, no grade top cut and up to 3m internal dilution. KSD001, KSD010 and KSD013 were previously reported in the
Company’s ASX announcement dated 15 July 2024; KSD023 on 10 November 2025; and KSD024 on 24 November
2025. Refer to those announcements for complete technical information.
The Study evaluated Sua as a standalone conceptual development and as the anchor of a second
case incorporating Bermol and North Bermol. Pit optimisation at US$3,000/oz generated the
conceptual pit shells and staged mine designs that formed the basis of the two development cases.
Those cases were then evaluated at US$3,300/oz, the Study’s base-case gold price. The designs
remain preliminary and require resource-definition drilling, geotechnical and hydrogeological data,
sterilisation drilling and more detailed mine design before they can support an Ore Reserve.
Figure 4: Conceptual Sua cross-section showing topography, modelled mineralisation and the preliminary pit design. It
is not an Ore Reserve, final mine design or production target.
METALLURGY AND PROCESSING FLOWSHEET
The conceptual flowsheet is grounded in preliminary Sua testwork previously reported on 21 April
2026. Testing of three composite samples returned total gold recovery of approximately 95%.
Diagnostic leach testing indicated that 94–96% of the gold in the samples tested was readily
amenable to cyanidation, while preliminary gravity recoverable gold exceeded 50%. The samples
also reported low arsenic and other deleterious elements, subject to further testwork.
The independent metallurgist who reviewed the results described the early testwork as indicating
a relatively straightforward conventional gravity and CIL processing route, while emphasising that
it must be confirmed as the resource is better defined. The Study adopted a 92% recovery
assumption after allowing a 3% plant-loss deduction for internal evaluation.
I D E N B U R G UP D AT E :
I N D E P E N D E N T S C O P IN G S T U D Y C OM PL E T E D
FAR EAST GOLD ASX ANNOUNCEMENT 8
The resulting concept uses crushing, SAG and ball milling, gravity recovery and intensive leaching,
CIL, electrowinning and smelting to produce gold doré. CIL tailings would pass through cyanide
detoxification and filtration before conceptual dry-stack disposal.
Figure 5: Simplified conceptual Idenburg processing flowsheet derived from the internal Scoping Study.
PFS-readiness metallurgical work is expected to include:
• variability testing across representative Sua mineralised domains and deposit-specific
testing;
• additional comminution and multi-stage gravity testing;
• grind-size, leach residence-time and reagent-consumption optimisation; and
• confirmation of cyanide detoxification, cyanide recycling and process design criteria.
TECHNICAL DESIGN BASIS
Workstream Study conclusion and basis for the next stage
Mining
Conventional open-pit drill, blast, load and haul using 5 m benches. Pit
optimisation used a US$3,000/oz gold price and generated staged
concepts at Sua and Bermol.
Processing
Gravity concentration followed by CIL and production of gold doré. The
Study adopted 92% gold recovery for internal evaluation.
Tailings
Cyanide detoxification followed by filtration and dry-stack disposal was
selected as the conceptual management route for further assessment.
Infrastructure
Sua is approximately 5 km from the Trans-Irian Highway. Power, water,
site access, plant location and supporting infrastructure require PFS-level
trade-off studies.
Two
development
cases
Sua standalone and staged expansion from Sua into Bermol and North
Bermol. Both were evaluated at US$3,300/oz and a 9% discount rate, with
the modelling supporting progression of both cases across a ±40%
mining-cost sensitivity range.
I D E N B U R G UP D AT E :
I N D E P E N D E N T S C O P IN G S T U D Y C OM PL E T E D
FAR EAST GOLD ASX ANNOUNCEMENT 9
The Study's actual production assumptions and financial results are not disclosed. The qualitative
statement above describes only whether the modelling supported progression across the sensitivity
range and does not provide assurance of an economic development case.
RECOMMENDED RESOURCE DRILLING PROGRAM
The Study recommends a 73-hole, approximately 6,085-metre program combining infill, extension
and twin drilling. Its principal purpose is to improve geological confidence within and around the
conceptual pit shells and test the continuity and extent of mineralisation.
The MRE was based on 37 drill holes at Sua. Three additional holes were subsequently completed,
bringing the total at Sua to 40 holes totalling approximately 6,754m. These totals include 18 holes
totalling 4,125m from the recent drilling program (see ASX announcement dated 30 April 2026).
The recommended 26-hole, approximately 2,840m Sua program is designed to increase drill
density across the main high-grade corridor and conceptual pit area, improve geological confidence
and test extensions.
Prospect Holes
Approx.
metres
Principal objective
Sua 26 2,840
50 m infill, step-out/down-dip testing and two twin
holes; focus on the main high-grade corridor and
conceptual pit area.
Bermol 28 2,600 Infill and extension drilling, including one twin hole.
North Bermol 19 645
Shallow infill and extension drilling, including one
twin hole.
Total 73 6,085
Recommended program; final design and timing
remain subject to approval, access and funding.
There is no certainty that the proposed drilling will result in any Mineral Resources being classified
as indicated or measured, or in an increase to the Mineral Resource.
Figure 6: Exploration drilling undertaken at the Idenburg Gold Project, Papua, Indonesia.
I D E N B U R G UP D AT E :
I N D E P E N D E N T S C O P IN G S T U D Y C OM PL E T E D
FAR EAST GOLD ASX ANNOUNCEMENT 10
PATHWAY TO POTENTIALLY REPORTABLE PROJECT ECONOMICS
Publication of modelled project economics will require reporting of higher-confidence Mineral
Resources, appropriate technical studies and sufficiently advanced modifying-factor work. FEG’s
planned activities entail:
• complete priority infill, twin and extension drilling and receive final assays;
• update the geological interpretation and Mineral Resource model, with the objective of
supporting the classification of appropriate areas to higher-confidence categories and
testing extensions;
• complete the required metallurgical, geotechnical, hydrogeological, tailings, infrastructure,
environmental and permitting work;
• undertake a PFS-level evaluation supported by sufficient engineering and cost definition
and, if justified, estimate an Ore Reserve; and
• report a production target and forecast financial information if the Company has reasonable
grounds and satisfies the applicable ASX and JORC disclosure requirements.
Figure 7: Geological logging of core at the Idenburg Gold Project, Papua, Indonesia.
I D E N B U R G UP D AT E :
I N D E P E N D E N T S C O P IN G S T U D Y C OM PL E T E D
FAR EAST GOLD ASX ANNOUNCEMENT 11
TWO PARALLEL PATHWAYS TO VALUE
The internal Study defines the resource-definition drilling, engineering, permitting and PFS-
readiness work required to advance the conceptual development cases at Sua, Bermol and North
Bermol. In parallel, FEG can continue systematic exploration across the wider 95,280-hectare
Contract of Work, seeking to expand the resource base and add future development options. The
Study work also supports the Indonesian Feasibility Study pathway to increase FEG’s ownership
from 51% to 80%.
Potential near-term value catalysts include:
• new drill assays from the Sua high-grade corridor and conceptual pit area;
• potential classification of appropriate portions of the current inferred resources in higher-
confidence categories;
• resource-extension results and an updated Mineral Resource Estimate;
• metallurgical, geotechnical, hydrogeological and infrastructure work that reduces key
development uncertainties;
• Indonesian Feasibility Study and permitting work supporting FEG's contractual pathway
from 51% to 80% ownership; and
• continued systematic exploration across the wider Idenburg district, in parallel with Sua's
development work, seeking new discoveries and potential future additions to the resource
base.
MINERAL RESOURCE AND PREVIOUS DISCLOSURES
The information in this announcement that relates to the Idenburg MRE was previously reported in
the Company's ASX announcement dated 5 May 2026, “Idenburg JORC MRE Increases from
540,000 Ounces to 780,000 Ounces of Gold”. The Company confirms that it is not aware of any
new information or data that materially affects the information included in that announcement and
that all material assumptions and technical parameters underpinning the estimate continue to apply
and have not materially changed. The Company confirms that the form and context in which the
Competent Person's findings are presented have not been materially modified from the original
announcement.
The metallurgical results referred to in this announcement were previously reported in the
Company's ASX announcement dated 21 April 2026, “Idenburg Update: Metallurgical Testwork
Demonstrates High Gold Recoveries at Sua”. The Company confirms that it is not aware of any
new information or data that materially affects the information included in that announcement.
FEG's current 51% ownership interest, the contractual pathway to increase that interest to 80%
and the relationship between the Scoping Study and Indonesian Feasibility Study workstreams
were described in the Company's ASX announcements dated 22 June 2026 and 30 July 2026.
I D E N B U R G UP D AT E :
I N D E P E N D E N T S C O P IN G S T U D Y C OM PL E T E D
FAR EAST GOLD ASX ANNOUNCEMENT 12
FORWARD-LOOKING STATEMENTS
This announcement contains forward-looking statements concerning FEG's plans, intentions and
expectations. Forward-looking statements are subject to known and unknown risks, uncertainties
and assumptions, many of which are beyond the Company's control. Actual outcomes may differ
materially from those expressed or implied. The Company gives no assurance that the activities or
outcomes described will be achieved and, except as required by law or the ASX Listing Rules,
undertakes no obligation to update these statements.
Figure 8: Exploration drilling at the Sua prospect, Idenburg Gold Project, Papua, Indonesia
I D E N B U R G UP D AT E :
I N D E P E N D E N T S C O P IN G S T U D Y C OM PL E T E D
FAR EAST GOLD ASX ANNOUNCEMENT 13
COMPETENT PERSONS’ STATEMENT
The technical information in this announcement that relates to the Idenburg Scoping Study is derived
from the final report titled “Idenburg Gold Project Scoping Study” dated 21 August 2026, prepared by
PT Mining One Indonesia (Mining One). The Study was prepared under the supervision of Mr Ievan
Ludjio, Director, who is a Fellow of the Australasian Institute of Mining and Metallurgy, and is employed
by Mining One. Mr Ievan Ludjio has sufficient experience relevant to the style of mineralisation and type
of deposit under consideration and to the activity being undertaken to qualify as a Competent Person
under the 2012 Edition of the JORC Code. Mr Ievan Ludjio has reviewed the final announcement and
consents to the inclusion of the matters based on the Study in the form and context in which they appear.
The announcement does not reproduce the Study in full and does not disclose the detailed life-of-mine
schedules, production profiles or financial outputs contained in the Study.
The Idenburg Mineral Resource Estimate referred to in this announcement was previously reported in
the Company’s ASX announcement dated 5 May 2026, “Idenburg JORC MRE Increases from 540,000
Ounces to 780,000 Ounces of Gold”. The Mineral Resource Estimate was based on the SMG
Consultants report titled “JORC Resource Report, PT Iriana Mutiara Idenburg, March 2026” and
supporting documentation prepared by SMG Consultants Principal Geologist and Competent Person
Mr Abdullah Dahlan.
The Company confirms that it is not aware of any new information or data that materially affects the
Mineral Resource Estimate and that all material assumptions and technical parameters underpinning
the estimate continue to apply and have not materially changed. The Company confirms that the form
and context in which Mr Dahlan’s findings are presented have not been materially modified from the
original market announcement.
A complete copy of the JORC Resource Report, which has an effective Mineral Resource date of 31
March 2026 and was completed in May 2026, is included as Appendix A and published in full in
accordance with the consent contained in the report.
Michael C Corey, a Member of the Association of Professional Geoscientists of Ontario, Canada, and
an employee of Far East Gold Limited, has reviewed the Company’s summary of the technical
information included in the prepared announcement for consistency with the source reports. This review
does not replace the original Competent Person consent provided by Mr Abdullah Dahlan in respect of
the Mineral Resource Estimate or the Competent Person consent provided by Mr Ievan Ludjio in respect
of the Scoping Study.
ABOUT FAR EAST GOLD
Far East Gold Ltd (ASX: FEG) is an ASX listed copper/gold exploration company with six advanced
projects in Australia and Indonesia. This announcement has been authorised for release by the
Board of Far East Gold Ltd.
FURTHER INFORMATION:
Sign up to the Far East Gold investor hub to receive important news and updates directly to your
inbox, and to engage directly with our leadership team: https://investorhub.fareast.gold/auth/signup
COMPANY ENQUIRIES
Justin Werner
Chairman
e:
Share your feedback
Discover